Comprehensive Service Level Agreements typically do not address:()
A

 Roles & responsibilities

B

 Headcount & budgets

C

 Reporting policies

D

 Penalites


相似考题
参考答案和解析
正确答案: B
解析: 暂无解析
更多“单选题Comprehensive Service Level Agreements typically do not address:()A  Roles  responsibilitiesB  Headcount  budgetsC  Reporting policiesD  Penalites”相关问题
  • 第1题:

    Which of the following is the MOST important physical consideration when deploying a new server?()

    • A、 Humidity monitors, Biometrics, and fire suppression
    • B、 Cooling, rack space, and power requirements冷
    • C、 Service level agreements, uninterruptible power supply (UPS) deployment, and CCTV
    • D、 Biometrics, fire suppression, and power requirements

    正确答案:B

  • 第2题:

    Comprehensive Service Level Agreements typically do not address:()

    • A、 Roles & responsibilities
    • B、 Headcount & budgets
    • C、 Reporting policies
    • D、 Penalites

    正确答案:B

  • 第3题:

    A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address the customer concern?()

    • A、Enable automatic problem reporting from smit
    • B、Use IVM to enable console mirroring to IBM Remote Support.
    • C、Use the HMC to enable reporting through Electronic Service Agent.
    • D、Enable Automatic Problem Reporting in ASMI using he embedded modem on the FSP.

    正确答案:C

  • 第4题:

    You have two Exchange Server 2010 servers that have the Client Access, Hub Transport, and Mailbox server roles installed.The servers are members of a database availability group (DAG).You need to ensure that all users can access the Client Access server if a single server or service fails.What should you do?()

    • A、from DNS manager, create two new records for the Client Access servers.
    • B、from Failover Cluster Manager, create a new service named Client Access Server and assign a new IP address.
    • C、Install the Network Load Balancing feature on each server and assign a second IP address to each network adapter.
    • D、Deploy a hardware load balancer.Create a DNS record for the virtual IP address and configure a Client Access server array.

    正确答案:D

  • 第5题:

    You create a Windows Communication Foundation (WCF) service and deploy it with wsHttpBinding and message security enabled.You create an intermediate WCF service for logging messages sent to the primary service.The intermediate service is called via endpoint behaviour. The primary service is receiving malformed data from a client application.You need to enable inspection of the malformed data and prevent message tampering. What do you do?()

    • A、Specify a protection level of None in the contract for the intermediate service. Disable message and transport security from the client application configuration file.
    • B、Specify a protection level of Sign in the contract for the intermediate service. Disable transport security from the client application configuration file.
    • C、Modify the binding on the intermediate service to use netNamedPipeBinding.
    • D、Modify the binding on the intermediate service to use webHttpBinding.

    正确答案:B

  • 第6题:

    单选题
    A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address the customer concern?()
    A

    Enable automatic problem reporting from smit

    B

    Use IVM to enable console mirroring to IBM Remote Support.

    C

    Use the HMC to enable reporting through Electronic Service Agent.

    D

    Enable Automatic Problem Reporting in ASMI using he embedded modem on the FSP.


    正确答案: A
    解析: 暂无解析

  • 第7题:

    单选题
    A Windows Communication Foundation (WCF) service has a callback contract. You are developing a client application that will call this service. You must ensure that the client application can interact with the WCF service. What should you do? ()
    A

     On the OperationContractAttribute, set the AsyncPattern property value to True.

    B

     On the OperationContractAttribute, set the ReplyAction property value to the endpoint address of the client. For interactive and self-paced preparation of exam 70-513, try our practice exams. Practice exams also include self assessment and reporting features!

    C

     On the client, create a proxy derived from DuplexClientBase(Of TChannel).

    D

     On the client, use GetCallbackChannel(Of T).


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    You create a Windows Communication Foundation (WCF) service and deploy it with wsHttpBinding and message security enabled.You create an intermediate WCF service for logging messages sent to the primary service.The intermediate service is called via endpoint behaviour. The primary service is receiving malformed data from a client application.You need to enable inspection of the malformed data and prevent message tampering. What do you do?()
    A

    Specify a protection level of None in the contract for the intermediate service. Disable message and transport security from the client application configuration file.

    B

    Specify a protection level of Sign in the contract for the intermediate service. Disable transport security from the client application configuration file.

    C

    Modify the binding on the intermediate service to use netNamedPipeBinding.

    D

    Modify the binding on the intermediate service to use webHttpBinding.


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    Which service is provided by Cisco SMARTnet?()
    A

     Investment protection with upgrade discounts

    B

     around-the clock access to Cisco Technical Access Center

    C

     Cisco Learning Credits for IT staff development

    D

     service level agreements to ensure uptime requirements are met


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    You work in a company which is named Wiikigo Corp. The company uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. There is a database named Service in the instance. There is a database user who is named ServiceGreatUser. A SQL Server login named ServiceGreatLogin maps to ServiceGreatUser in the Service database. According to the requirement of the company CIO, the database user can only perform the two tasks below: the database user executes all stored procedures that currently exist in the Sales database and executes all stored procedures that will be created in the Sales database. So what should you do to ensure this? ()
    A

    ServiceGreatUser should be added to the appropriate fixed database roles. 

    B

    You should assign the appropriate object-level permissions to ServiceGreatUser 

    C

    You should assign the appropriate server-level permissions to ServiceGreatLogin 

    D

    You should assign the appropriate database-level permissions to ServiceGreatUser


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    You are creating a Windows Communication Foundation (WCF) service that implements the following service contract.  Public Interface IOrderProcessing  Sub ApproveOrder(ByVal id As Integer)For interactive and self-paced preparation of exam 70-513, try our practice exams. Practice exams also include self assessment and reporting features!End Interface You need to ensure that only users with the Manager role can call the ApproveOrder method. What should you do?()
    A

     In the method body, check the Rights.PosessesProperty property to see if it contains manager.

    B

     Add a PrincipalPermission attribute to the method and set the Roles property to Manager.

    C

     Add a SecurityPermission attribute to the method and set the SecurityAction to Demand.

    D

     In the method body, create a new instance of WindowsClaimSet.


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    When designing the WAN module within the enterprise edge, which document is used to specify the connectivity and performance agreements with the service provider?()
    A

    RFP

    B

    RFC

    C

    SLC/SLA

    D

    SOW


    正确答案: C
    解析: 暂无解析

  • 第13题:

    Which of the following is the MOST important physical consideration when deploying a new server?()

    • A、Humidity monitors, Biometrics, and fire suppression
    • B、Cooling, rack space, and power requirements
    • C、Service level agreements, uninterruptible power supply (UPS) deployment, and CCTV
    • D、Biometrics, fire suppression, and power requirements

    正确答案:B

  • 第14题:

    Service Level Agreements (SLA) typically do not address()

    • A、 Network access and availability
    • B、 Application access and availability
    • C、 Escalation and conflict resolution
    • D、 Headcounts and budgets

    正确答案:D

  • 第15题:

    You are deploying a Junos Pulse Access Control Service cluster in active/passive mode. How do you configure the IP address on the SRX Series devices?()

    • A、Configure a single Junos Pulse Access Control Service instance on the enforcer, specifying the VIP as the IP address the instance.
    • B、Configure multiple Junos Pulse Access Control Service instances on the enforcer, specifying the specific IP address each device in a separate instance.
    • C、Configure a single Junos Pulse Access Control Service instance on the enforcer, specifying the VIP and active node address in the instance.
    • D、Configure a single Junos Pulse Access Control Service instance on the enforcer, specifying the VIP and passive node address in the instance.

    正确答案:A

  • 第16题:

    You are creating a client application and configuring it to call a Windows Communication Foundation (WCF) service.When the application is deployed, it will be configured to send all messages to a WCF routing service. You need to ensure that the application can consume the target service after the application is deployed. What should you do?()

    • A、In the client application, add a service reference to the router service. In the client binding configuration, specify the address of the router service.
    • B、In the client application, add a service reference to the target service. In the client binding configuration, specify the address of the target service.
    • C、In the client application, add a service reference to the router service. In the client binding configuration, specify the address of the target service.
    • D、In the client application, add a service reference to the target service. In the client binding configuration, specify the address of the router service.

    正确答案:D

  • 第17题:

    单选题
    AMVER is a system which provides().
    A

    satellite communications

    B

    navigational information

    C

    weather information

    D

    position reporting service


    正确答案: B
    解析: 暂无解析

  • 第18题:

    单选题
    Comprehensive Service Level Agreements typically do not address:()
    A

     Roles & responsibilities

    B

     Headcount & budgets

    C

     Reporting policies

    D

     Penalites


    正确答案: B
    解析: 暂无解析

  • 第19题:

    单选题
    Which of the following is the MOST important physical consideration when deploying a new server?()
    A

     Humidity monitors, Biometrics, and fire suppression

    B

     Cooling, rack space, and power requirements冷

    C

     Service level agreements, uninterruptible power supply (UPS) deployment, and CCTV

    D

     Biometrics, fire suppression, and power requirements


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    You are creating a client application and configuring it to call a Windows Communication Foundation (WCF) service.When the application is deployed, it will be configured to send all messages to a WCF routing service. You need to ensure that the application can consume the target service after the application is deployed. What should you do?()
    A

    In the client application, add a service reference to the router service. In the client binding configuration, specify the address of the router service.

    B

    In the client application, add a service reference to the target service. In the client binding configuration, specify the address of the target service.

    C

    In the client application, add a service reference to the router service. In the client binding configuration, specify the address of the target service.

    D

    In the client application, add a service reference to the target service. In the client binding configuration, specify the address of the router service.


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    You are deploying a Junos Pulse Access Control Service cluster in active/passive mode. How do you configure the IP address on the SRX Series devices?()
    A

    Configure a single Junos Pulse Access Control Service instance on the enforcer, specifying the VIP as the IP address the instance.

    B

    Configure multiple Junos Pulse Access Control Service instances on the enforcer, specifying the specific IP address each device in a separate instance.

    C

    Configure a single Junos Pulse Access Control Service instance on the enforcer, specifying the VIP and active node address in the instance.

    D

    Configure a single Junos Pulse Access Control Service instance on the enforcer, specifying the VIP and passive node address in the instance.


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    In the design phase, which service component provides the customer with a comprehensive design? Select exactly 1 answer(s) from the following:()。
    A

    Implementation Plan

    B

    Detailed Design Development

    C

    Project Kick-off

    D

    Staging Plan

    E

    High-Level Design


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    You have two Exchange Server 2010 servers that have the Client Access, Hub Transport, and Mailbox server roles installed.The servers are members of a database availability group (DAG).You need to ensure that all users can access the Client Access server if a single server or service fails.What should you do?()
    A

    from DNS manager, create two new records for the Client Access servers.

    B

    from Failover Cluster Manager, create a new service named Client Access Server and assign a new IP address.

    C

    Install the Network Load Balancing feature on each server and assign a second IP address to each network adapter.

    D

    Deploy a hardware load balancer.Create a DNS record for the virtual IP address and configure a Client Access server array.


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    Service Level Agreements (SLA) typically do not address()
    A

     Network access and availability

    B

     Application access and availability

    C

     Escalation and conflict resolution

    D

     Headcounts and budgets


    正确答案: D
    解析: 暂无解析