更多“判断题The engineer hasn’t got time to track down the problem.‘To track down’ means to find out.A 对B 错”相关问题
  • 第1题:

    I don't understand what the engineer means, but I’ve got rough idea of

    Project plan.

    A. the; a B. 不填; theC. the;不填 D. a ; the


    正确答案:B

  • 第2题:

    The words "chop down" in the second paragraph means______

    A. clear

    B. make room for

    C. destroy

    D. cut down


    正确答案:D

    此题为词汇题。第二段中的词汇chop down意思是“砍伐”。

  • 第3题:

    Which two statements about the track configuration option are correct?()

    A. The track option monitors interfaces as defined by the user.

    B. The track option monitors all interfaces participating in VRRP.

    C. The track option allows for a reduction of the priority value if the monitored interface goes down.

    D. The track option causes syslog entries to be written in the messages log file, if the monitored interface goes down.


    参考答案:A, C

  • 第4题:

    The engineer hasn’t got time to track down the problem.‘To track down’ means to find out.

    A

    B



  • 第5题:

    The engineer hasn’t got time to track down the problem.‘To track down’ means to find out.


    正确答案:正确

  • 第6题:

    Will you please turn down the TV?()

    • A、I‘ll turn it down next time. 
    • B、Never mind if you turn it down.
    • C、It sounds reasonable.
    • D、Sorry. I haven‘t realized you‘re sleeping.

    正确答案:D

  • 第7题:

    A system must be upgraded from AIX 5.1 to 5.2.  Which of the following scheduling processes should be performed? ()

    • A、 Schedule enough down time to backup, upgrade and reboot. 
    • B、 Backup, upgrade, then schedule enough down time to reboot the system. 
    • C、 Backup, then schedule enough down time to upgrade and reboot the system. 
    • D、 No scheduling processes are necessary because no down time is required.

    正确答案:A

  • 第8题:

    Which two statements about the track configuration option are correct?()

    • A、The track option monitors interfaces as defined by the user.
    • B、The track option monitors all interfaces participating in VRRP.
    • C、The track option allows for a reduction of the priority value if the monitored interface goes down.
    • D、The track option causes syslog entries to be written in the messages log file, if the monitored interface goes down.

    正确答案:A,C

  • 第9题:

    单选题
    The oil mist detectors continuously() the crankcase atmosphere, via a pipe system, and move it past a sensitive and accurate opacity measuring track.
    A

    detract

    B

    extract

    C

    pump up

    D

    pump down


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A: Excuse me. Could you show me the way to the nearest subway station?  B: ______
    A

    Any time. It’s far from here, isn’t it?

    B

    Do you want me to go with you?

    C

    No problem. What can I do for you?

    D

    Of course. Go down this street and turn right.


    正确答案: C
    解析:
    此题会话情景是问路。D项“当然,顺着这条路往前走,然后朝右拐。”为正确答案。A项前半部分是听到感谢后的回答,后半句是反意疑问句,并没有提供“怎么走”的信息。B项和C项答非所问。

  • 第11题:

    单选题
    -Can you turn down the radio, please? -()
    A

    I’m sorry, I didn’t realize it was that loud

    B

    Please forgive me

    C

    I’ll keep it down next time


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    A system administrator needs to upgrade the Oracle database from Version 7 to Version 8.  Which of the following scheduling concerns should be considered?()
    A

    Schedule enough down time to backup, upgrade and reboot. 

    B

    Backup, upgrade, then schedule enough down time to reboot the system.

    C

    Backup, then schedule enough down time to upgrade and reboot the system. 

    D

    There are no scheduling concerns because no down time is required.


    正确答案: B
    解析: 暂无解析

  • 第13题:

    —How about your journey to Mount Emei ?

    —Everything was wonderful except that our car _________ twice on the way .

    A. slowed down B. broke down C. got downD. put down


    正确答案:B

  • 第14题:

    We were able to () the error and have credited your account.

    A、track out

    B、track down

    C、track over

    D、track up


    参考答案:B

  • 第15题:

    You are asked to configure real-time performance monitoring (RPM) between two Junos devices to track traffic in your network. Which two application traffic types can you track?()

    A. ICMP

    B. SNMP

    C. TCP

    D. HTTPS


    参考答案:A, C

  • 第16题:

    Will you please turn down the TV?()

    AI‘ll turn it down next time. 

    BNever mind if you turn it down.

    CIt sounds reasonable.

    DSorry. I haven‘t realized you‘re sleeping.


    D

  • 第17题:

    -Can you turn down the radio, please? -()

    • A、I’m sorry, I didn’t realize it was that loud
    • B、Please forgive me
    • C、I’ll keep it down next time

    正确答案:A

  • 第18题:

    You are asked to configure real-time performance monitoring (RPM) between two Junos devices to track traffic in your network. Which two application traffic types can you track?()

    • A、ICMP
    • B、SNMP
    • C、TCP
    • D、HTTPS

    正确答案:A,C

  • 第19题:

    A system administrator needs to upgrade the Oracle database from Version 7 to Version 8.  Which of the following scheduling concerns should be considered?()

    • A、Schedule enough down time to backup, upgrade and reboot. 
    • B、Backup, upgrade, then schedule enough down time to reboot the system.
    • C、Backup, then schedule enough down time to upgrade and reboot the system. 
    • D、There are no scheduling concerns because no down time is required.

    正确答案:A

  • 第20题:

    多选题
    Which two statements about the track configuration option are correct?()
    A

    The track option monitors interfaces as defined by the user.

    B

    The track option monitors all interfaces participating in VRRP.

    C

    The track option allows for a reduction of the priority value if the monitored interface goes down.

    D

    The track option causes syslog entries to be written in the messages log file, if the monitored interface goes down.


    正确答案: A,C
    解析: 暂无解析

  • 第21题:

    单选题
    The word decathlon in paragraph 3 probably means ______.
    A

    jumping

    B

    five track and field events

    C

    throwing

    D

    ten track and field events


    正确答案: D
    解析:
    文章倒数第二段最后提到“...The decathlon hasten track and field events”,也就是说,decathlon有十项运动,由此可以推断,decathlon为十项运动,故D项正确。deca-为前缀,表示“十”,如:decade (十年)。

  • 第22题:

    单选题
    Will you please turn down the TV?()
    A

    I‘ll turn it down next time. 

    B

    Never mind if you turn it down.

    C

    It sounds reasonable.

    D

    Sorry. I haven‘t realized you‘re sleeping.


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    How does an icebreaker normally free a ship which has become beset while navigating independently?()
    A

    By backing down the track and cutting out ice on either bow

    B

    By approaching from the stern and crossing ahead at an angle of 20° to 30° to the beset ship's course

    C

    By overtaking the beset ship,running ahead and then backing down the track to the beset vessel

    D

    By approaching the vessel from astern and towing the beset vessel stern first


    正确答案: C
    解析: 暂无解析