SPT
LVT
FLRT
SSIC
第1题:
A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()
第2题:
An administrator needs to recover an HMC due to a failed disk. The disk has been replaced, allowing the administrator to reinstall the HMC back to the required release of software. Backups of both the HMC Console Data and Upgrade Data are available. After reloading the HMC with the Recovery DVDs, what are the next steps to restore the HMC configuration?()
第3题:
Which tool is based on the AIX trace facility?()
第4题:
Which is a supported method to upgrade firmware on an IBM Power Systems 570?()
第5题:
A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS. Which of the following must be completed prior to this migration ()
第6题:
Dynamic LPAR
Micro-Partitioning
Small Memory Real Mode
Capacity Upgrade on demand for memory
第7题:
Use the /usr/sbin/invscout AIX command
Use the 'Updates' panel on the managing HMC
Boot the 570 using an IBM-provided microcode CD
Use the /usr/lpp/diagnostics/bin/update_flash AIX command
第8题:
LPAR creation
Proper card placement
Application compatibility assistance
Response time for applications
第9题:
Upgrade system firmware to latest level
Upgrade to AIX 5.3
Upgrade HMC to version 6.1
Convert rootvg filesystems to JFS2
第10题:
It has a GUI interface for upgrading system firmware.
It creates and manages AIX/Linux and VIOS type LPARs.
It can be managed by the Hardware Management Console (HMC).
It supports Live Partition Mobility on POWER6 systems and above.
第11题:
SPT
LVT
FLRT
SSIC
第12题:
Update Firmware, Update Drivers, Run Diagnostics Install Windows
Update Firmware, Update Drivers, Run Diagnostics Install Windows and Linux Operating systems
Update Firmware, Run Diagnostics, Install Windows
Update Firmware, Update Drivers. Install Windows
第13题:
Which is a supported method to upgrade firmware on an IBM Power Systems 570?()
第14题:
Which tool validates firmware and HMC compatibility for a proposed AIX upgrade?()
第15题:
An administrator notices that some of their systems are reporting a number in the eferred Level?column on the HMC pdates?panel. WhatAn administrator notices that some of their systems are reporting a number in the ?eferred Level?column on the HMC ?pdates?panel. What is the meaning of the eferred Level?is the meaning of the ?eferred Level?()
第16题:
Which of the following is a feature of Integrated Virtualization Manager (IVM)? ()
第17题:
A client tried to upgrade the system firmware on a p5 590, but it failed. What is the minimum requirement to update the system firmware from the HMC if inventory scout is already installed?()
第18题:
Oracle WebLogic Domain Upgrade tool
Smart Update
Smart Upgrade
No tool required, just install WebLogic 12c, update the domain to point to the new WebLogic installation and start your domain.
JDeveloper
第19题:
Use the 'HMC Management > Restore HMC Data' option to first restore just the HMC Data..
Use the 'HMC Management > Restore Upgrade Data' option to first restore just the Upgrade Data.
Use the 'HMC Management > Restore HMC Data' option to first restore the HMC Data and then the Upgrade Data.
Use the 'HMC Management > Restore Upgrade Data' option to first restore the Upgrade Data, and then the HMC Data.
第20题:
Use the /usr/sbin/invscout AIX command.
Use the ’Updates’ panel on the managing HMc
Boot the 570 using an IBM-provided microcode Cd
Use the /usr/lpp/diagnostics/bin/update_flash AIX command.
第21题:
no
netpmon
entstat
nfso
第22题:
The number denotes the firmware level which will be activated when AIX is next rebooted.
The number denotes the firmware level which will be activated when all LPARs are next started.
The number denotes the firmware level which will be activated when the managed system is next restarted.
The number denotes how many days have elapsed since the firmware was installed without the LPARs being reactivated.
第23题:
A public internet connection
All of the Logical Partitions need to be active
One partition must be configured with Service Authority
A local Repository must be configured prior to the update
第24题:
ITSO Redbooks
Facts and Features
System Planning Tool
Fix Level Recommendation Tool