The bosinst_data has an incorrect console defined.
The bosinst_data is incompatible with the level of spot.
The bosinst_data has an incorrect disk location defined.
The bosinst_data has an incorrect language option defined.
第1题:
During a NIM install, the system stops with the LED code 611.What is the cause of the issue?()
第2题:
After using the alt_disk_install command to clone a system image to another disk, the system administrator noticed a large number of defined devices not allocated to the LPAR. Which of the following is the most likely cause of this situation?()
第3题:
An administrator is investigating why a non-prompted NIM rte install is failing after the successful netboot of the spot. A matching spot and lpp_source are correctly allocated to the NIM client in addition to a bosinst_data. What is the most likely cause of the install failure?()
第4题:
For NIM to install client machines located in a non-adjacent network, which routing must be defined?()
第5题:
To load a base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed?()
第6题:
A mksysb resource, a SPOT resource, and an lpp_source resource
A SPOT resource, an lpp_source resource, and a machine definition
An lpp_source resource, a mksysb resource, and a machine definition
A SPOT resource, an lpp_source resource, a bosinst_data resource, and a machine definition
第7题:
The bosinst_data has an incorrect console defined.
The bosinst_data is incompatible with the level of spot.
The bosinst_data has an incorrect disk location defined.
The bosinst_data has an incorrect language option defined.
第8题:
A failure to NFS mount filesystems from the NIM client
A failure to NFS mount filesystems from the NIM master
A failure to retrieve the tftp client info from the NIM master
A failure to retrieve the tftp server info from the NIM master
第9题:
Boot/install servers will be required on each intermediate network.
When an install is initiated by the client, routing is only required from the LPAR back to the NIM master.
When an install is initiated by the NIM master, routing is only required from the NIM master to the client.
Appropriate network NIM resources need to be defined to the NIM master to allow routing in both directions.
第10题:
rsct.*
xIC* and rsct.*
bos.adt.* and rsct.*
csm.*.rte and rsct.*
第11题:
View debug logs on NIM master for errors or failures.
Boot the client machine to SMS, and view the POST Error log.
Boot the client machine to SMS, setup remote IPL, and execute a ping test.
Boot the client machine to diagnostics, and ping the client from the NIM master.
第12题:
root
spot
home
paging
第13题:
An administrator is investigating why a non-prompted NIM rte install is failing after the successful netboot of the spot. A matching spot and lpp_source are correctly allocated to the NIM client in addition to a bosinst_data. What is the most likely cause of the install failure?()
第14题:
To load the base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed()
第15题:
What are the minimal resources to perform a NIM BOS install?()
第16题:
An administrator is defining an lpp_source calledlpp_AIX6 in NIM when the following warning message is displayed in the output:warning: 0042-267 c_mk_lpp_source: The defined lpp_source does not have the 'simages' attribute because one or more of the following packages are missing: Bos bos.net bos.diag bos.sysmgtbos.terminfo bos.terminfo.all.data bos.mp64 devices.common bos.64bit. What does this warning message mean?()
第17题:
While attempting to load a base operating system to a machine, an administrator is receiving bootp timeout error messages. What steps should be followed to troubleshoot communications between the NIM master and the client machine?()
第18题:
The lpp_AIX6 is not a valid lpp_source NIM resource.
The lpp_AIX6 can be used in NIM BOS operations to install AIX only on standalone clients.
The lpp_AIX6 can be used in NIM CUST operations to install software on SPOTs and running machines.
The lpp_AIX6 does not contain all of the required software packages for NIM CUST installation operations.WArialCourier NewTimes New RomanZ
第19题:
SPOT
lpp_source
mksysb
install CD
第20题:
The cfgmgr command was not run to reconfigure the devices
The machine was not booted into SMS MultiBoot mode after configuration
The machine was not in full system partition mode when the volume was created
The alt_disk_install command was not run with the -O option to remove references in the ODM
第21题:
spot, lpp_source
mksysb, lpp_source
boot, bundle, nim_script
aix disks, spot, lpp_source
第22题:
The bosinst_data has an incorrect console defined.
The bosinst_data is incompatible with the level of spot.
The bosinst_data has an incorrect disk location defined.
The bosinst_data has an incorrect language option defined.
第23题:
Create and install the NIM server
Create and install the Virtual I/O Server
Create and install the application servers
Activate Advanced POWER Virtualization
第24题:
A mksysb resource, a SPOT resource, and an lpp_source resource
A SPOT resource, an lpp_source resource, and a machine definition
An lpp_source resource, a mksysb resource, and a machine definition
A SPOT resource, an lpp_source resource, a machine definition, and a bootable CD