LPAR Planning Tool.
System Planning Tool.
LPAR Validation Tool.
System Validation Tool.
第1题:
Companycom has a p5 590 that has their production LPAR, their Tivoli Storage Manager (TSM) LPAR, and several other LPARs. What method would provide connectivity between the production LPAR, and the TSM LPAR, but be isolated from the other LPARs in the system without utilizing a Virtual IO Server or physical adapter resources?()
第2题:
A System p customer is planning to implement virtualization and is concerned about how to respond to an increased workload and what limitations there are for very small workloads. Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()
第3题:
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()
第4题:
An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
第5题:
What current IBM resource can be used for simple-to-complex configurations and can be exported in different formats for the pricing of System x, BladeCenter and System x storage products?()
第6题:
Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()
第7题:
Use the Workload Estimator capacity planning tool.
Use prtconf output from legacy systems.
Use the LPAR Validation Tool.
Use Performance Management Services.
第8题:
Maxperm% is set too low on LPAR 2
Insufficient paging space on LPAR 1
Service IBM.DRM is unavailable on LPAR 1
Insufficient pinnable memory frames available on LPAR 2
第9题:
The LPAR Configuration backup is corrupt
The LPAR Configuration has been altered using DLPAR
The LPAR Configuration backup was performed on a different HMC
The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed
第10题:
Use shared memory and semaphores to transfer the data to the TSM LPAR
Provide gigabit Ethernet adapters in each LPAR and run a crossover cable
Create a Virtual Ethernet between the production server and the TSM LPARs
Create a Virtual Ethernet between the TSM server LPAR and the non-production LPARs
第11题:
Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.
Smallest partition 10% of a processor, as small 1% of a processor may be transferred.
Smallest partition one processor, as small 1% of a processor may be transferred.
Smallest partition one core, as small 10% of a processor may be transferred.
第12题:
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS
Use DLPAR to move resources from the test LPAR to training when training is active
Install Partition Load Manager to share resources between the test and training environments
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
第13题:
Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()
第14题:
An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
第15题:
An electrician needs to know what type of receptacle is required. What is the most up-to-date resource to identify the plug type for the feature code ordered?()
第16题:
What type of configuration can provide the best availability in a Virtual IO Server environment?()
第17题:
During the pre-installation planning of a customer’s recently purchased IBM System Storage DS8700 the port configuration, cabling, and disk layout were discussed. What other topic should be discussed in this solution review()
第18题:
System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()
第19题:
e-Config
System Planning Tool (SPT)
IBM Workload Estimator (WLE)
IBM Performance Monitor (PM)
第20题:
Provide multiple paths to all resources through 2 or more Virtual IO Servers
Mirror all disk resources on the Virtual IO Server to present to the client LPAR
Mirror all disk resources on the client LPAR to the shared SCSI on the Virtual IO Server
Trunk multiple Ethernet adapters on the Virtual IO Server to a single Shared Ethernet Adapter (SEA)
第21题:
LPAR Planning Tool.
System Planning Tool.
LPAR Validation Tool.
System Validation Tool.
第22题:
Reboot the source LPAR.
Remove the resource from the source LPAR.
Rediscover the managed system from the HMC.
Add the resource to the profile of the LPAR.
第23题:
Dynamic LPAR
Workload Manager
Partition Load Manager
Shared Processor Pools