1. Upgrade from 4.5 to 5.12. Upgrade from 5.1 to 5.5
1. Upgrade from 4.5 to 5.22. Upgrade from 5.2 to 5.5
1. Upgrade from 4.5 to 5.32. Upgrade from 5.3 to 5.5
1. Upgrade from 4.5 to 5.4.12. Upgrade from 5.4.1 to 5.5
第1题:
An administrator is planning an upgrade of a major software package on an application server.The software has been identified, the project approved and the upgrade purchased. Which of the following steps should the administrator take NEXT?()
第2题:
A blade server has been configured to boot from SAN. After an HBA firmware upgrade the blade was rebooted and cannot find the operating system. Which of the following should the administrator do NEXT to troubleshoot the issue?()
第3题:
In order to upgrade from AIX Version 4.3 to AIX Version 5.2, which of the following actions should be performed?()
第4题:
An administrator will be performing a PowerHA upgrade on a cluster from version 5.3 to version 5.5. Which ofthe following tasks will verify a successful migration?()
第5题:
A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS. Which of the following must be completed prior to this migration ()
第6题:
You perform the following activities during the database upgrade from Oracle Database 10g to Oracle Database 11g: 1. Capture plans for a SQL workload into a SQL Tuning Set (STS) before upgrade. 2. Load these plans from the STS into the SQL plan baseline immediately after the upgrade. What is the reason for performing these activities? ()
第7题:
Use the clstat command and verify the cluster is in a stable state
After each node is upgraded, run a verification and synchronization
After all nodes are upgraded, run a verification and synchronization
Take a snapshot of each node and verify the configuration is the same
第8题:
Perform a Windows Anytime Upgrade.
Download and run the Windows 7 Upgrade Advisor.
Insert the Windows 7 installation media. From the Install Windows dialog box, select the Upgrade option.
Start the computer from the Windows 7 installation media. From the Install Windows dialog box, selectthe Upgrade option.
第9题:
Use alt_disk_install
Backup image to NIM server
Backup using mksysb to DVD-RAM
Apply the upgrade and do not commit
第10题:
Run smit update_all
Run smit install_all
Boot from the installation media
Run update_all from the mounted CD
第11题:
Schedule enough down time to backup, upgrade and reboot.
Backup, upgrade, then schedule enough down time to reboot the system.
Backup, then schedule enough down time to upgrade and reboot the system.
There are no scheduling concerns because no down time is required.
第12题:
The socket size does not match
The cache is from a different manufacturer
The processors do not match
Processors cannot be upgraded after server has been deployed
第13题:
A company would like to upgrade an old server to a multi-processor box. The server currently has asingle 3.0GHz 1Mb cache processor in it with a single empty socket. The only processor that is available from a manufacturer is a 3.0GHz 2Mb cache model. Which of the following is the BEST reason why this upgrade will not work?()
第14题:
A system must be upgraded from AIX 5.1 to 5.2. Which of the following scheduling processes should be performed? ()
第15题:
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()
第16题:
A system administrator needs to upgrade the Oracle database from Version 7 to Version 8. Which of the following scheduling concerns should be considered?()
第17题:
A System p administrator needs to upgrade a system from AIX 5.2 to AIX 5.3. Which of the following installation methods would minimize downtime()
第18题:
Migration installation
Partition Mobility
alt_disk_install
update_all smit fastpath and reboot during the next scheduled outage
第19题:
IBM Techline
IBM Supportline
IBM Software Distribution
IBM Hardware Support
第20题:
to minimize plan regression due to the use of a new optimizer version
to completely avoid the use of new plans generated by a new optimizer version
to prevent plan capturing when the SQL statement is executed after the database upgrade
to keep the plan in the plan history so that it can be used when the older version of the optimizer is used
第21题:
1. Upgrade from 4.5 to 5.12. Upgrade from 5.1 to 5.5
1. Upgrade from 4.5 to 5.22. Upgrade from 5.2 to 5.5
1. Upgrade from 4.5 to 5.32. Upgrade from 5.3 to 5.5
1. Upgrade from 4.5 to 5.4.12. Upgrade from 5.4.1 to 5.5
第22题:
Open a Web browser and log on to the IMM; in the navigation frame, click IMM Firmware Update under IMM Control; click Browse; select the .exe file; click the Upgrade/Update button
TFTP to the AMM; from the Main Menu, select Update; browse to the downloaded .exe file
Telnet to AMM; from the Main Menu, select Update; browse to the downloaded .pkt file
Open a Web browser and log on to the AMM; in the navigation frame, click AMM Firmware Update under AMM Control; click Browse; select the .pkt file; click the Upgrade/Update button
第23题:
Create a test environment for the new version.
Determine system requirements for the upgrade.
Request bids from other competing vendors in the product space.
Document the upgrade.
第24题:
Schedule enough down time to backup, upgrade and reboot.
Backup, upgrade, then schedule enough down time to reboot the system.
Backup, then schedule enough down time to upgrade and reboot the system.
No scheduling processes are necessary because no down time is required.