Configure the static route in the /etc/rc.net file
Using application Start/Stop scripts to manage the static route
Configure Pre and Post event commands to manage the static route
Using smitty route command to create the static route and update the ODM
第1题:
A customer who has a two node PowerHA cluster, with each node being at a different site and using cross siteLVM, plans to add a third heartbeat to further reduce the chance of data divergence or partitioned cluster. Theheartbeat will make use of spare adapters in the nodes. However, the heartbeats must go via an externalnetwork requiring static routes to be added for cluster functionality.How can this be achieved?()
第2题:
A customer is planning a PowerHA cluster split across two sites. The sites are located 10km apart. There is aDS8000 storage array at each site with SAN connectivity between the two arrays. There are only enough IPinterfaces for one IP network in this cluster. How can they ensure that disk data is automatically mirrored and synchronized between sites?()
第3题:
How can you configure High Availability for interacting with a non-Oracle database using WebLogic?()
第4题:
Your environment includes a Windows Server 2008 R2 Hyper-V failover cluster. You manage the virtual environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You plan to perform maintenance on the Hyper-V failover cluster. You need to complete the maintenance on the failover cluster while maximizing the uptime of the virtual machines (VMs). What should you do prior to starting maintenance on each cluster node?()
第5题:
You need to recommend the server configurations for the new failover cluster. The configurations must support the company's planned changes Which two actions should you recommend?()
第6题:
Purchase PowerHA/XD license
Purchase PowerHA with GLVM license
Implement PowerHA with split-site LVM
Implement PowerHA with cross-site LVM
第7题:
Individually before each node is upgraded
Individually before and after each node is upgraded
Individually after each node has been upgraded
Collectively after all nodes have been upgraded
第8题:
A
B
C
D
第9题:
Configure the static route in the /etc/rc.net file
Using application Start/Stop scripts to manage the static route
Configure Pre and Post event commands to manage the static route
Using smitty route command to create the static route and update the ODM
第10题:
Perform the cIRGmove command to move the node’s resources to another cluster node.
Perform a graceful stop of the cluster,replace the adapter,and restart the cluster.
Perform a force stop of the cluster node,replace the adapter,and restart the cluster.
Perform a graceful takeover of the cluster,replace the adapter,and restart the cluster.
第11题:
Configure the fourth node to use multicast mode.
Remove 10.50.8.70 from the Network Connections Properties of the fourth node.
On the fourth node, run the nlb.exe resume command.
On the fourth node, run the wlbs.exe reload command.
第12题:
The service IP addresses must be on a separate subnet and VLAN.
The non-service and service IP addresses must be on the same subnet and on the same VLAN.
All interfaces on a node must be in different subnets. All subnets must be on the same VLAN.
One non-service and one service IP address must be on the same logical subnet. All interfaces must be on the same VLAN.
第13题:
Company.com is migrating from a third party managed disk subsystem to an IBM TotalStorage Enterprise Storage Server. Connection of the new storage server is complete, and it has been tested on all of the nodes in the three node HACMP cluster. How does the customer migrate to the new storage server with minimum down time?()
第14题:
Which two statements are true regarding the WebLogic domain?()
第15题:
You are the network administrator for your company. The network consists of a single Active Directory domain. All computers on the network are members of the domain. You administer a Network Load Balancing cluster that consists of three nodes. Each node runs Windows Server 2003 and contains a single network adapter. The Network Load Balancing cluster can run only in unicast mode. The Network Load Balancing cluster has converged successfully. To increase the utilization of the cluster, you decide to move a particular application to each node of the cluster. For this application to run, you must add a Network Load Balancing port rule to the nodes of the cluster. You start Network Load Balancing Manager on the second node of the cluster. However, Network Load Balancing Manager displays a message that it cannot communicate with the other two nodes of the cluster. You want to add the port rule to the nodes of the cluster. What should you do? ()
第16题:
You are the network administrator for your company. The network consists of a single Active Directory domain. All computers on the network are members of the domain. You administer a three-node Network Load Balancing cluster. Each cluster node runs Windows Server 2003 and has a single network adapter. The cluster has converged successfully. You notice that the nodes in the cluster run at almost full capacity most of the time. You want to add a fourth node to the cluster. You enable and configure Network Load Balancing on the fourth node. However, the cluster does not converge to a four-node cluster. In the System log on the existing three nodes, you find the exact same TCP/IP error event. The event has the following description: "The system detected an address conflict for IP address 10.50.8.70 with the system having network hardware address 02:BF://0A:32:08:46." In the System log on the new fourth node, you find a similar TCP/error event with the following description: "The system detected an address conflict for IP address 10.50.8.70 with the system having network hardware address 03:BF://0A:32:08:46." Only the hardware address is different in the two descriptions. You verify that IP address 10.50.8.70 is configured as the cluster IP address on all four nodes. You want to configure a four-node Network Load Balancing cluster. What should you do? ()
第17题:
Company.com wishes to use IPAT via IP replacement in a two-node mutual cluster. Each node has two Ethernet 10/100/1000 adapters. Throughout the planning session,the customer has asked questions about subnet and VLAN requirements for the intended network topology. Which of the following best describes the network requirements?()
第18题:
Use Network Load Balancing Manager on the Network Load Balancing default host to add the port rule.
Change the host priority of the second node to be the highest in the cluster, and then use Network Load Balancing Manager to add the port rule.
Run the nlb.exe drain command on each node, and then use Network Load Balancing Manager to add the port rule.
Add the port rule through Network Connections Properties on each node.
第19题:
LDAP Authentication Module
Smart Assist for Active Directory
C-SPOC for user and password management
File Collections designating one node as the primary authentication node
第20题:
Purchase PowerHA/XD license
Purchase PowerHA with GLVM license
Implement PowerHA with split-site LVM
Implement PowerHA with cross-site LVM
第21题:
One disk per node,one network
Two disks per node,one network
Two disks per node,six networks
Two disks per node,three networks
第22题:
Configure multiple physical data sources and reuse the same JNDI name for each.
Use the compatibility option of Active GridLink to enable compatibility with non-Oracle databases.
Configure a single physical data source for each node in a database cluster and wrap it using Multi Data Source.
Configure a Data Source Group that contains a physical connection pool to each node in the database cluster.
第23题:
Shut down one node at a time and let the other node serve the application
Stop HACMP with the forced option and perform migration of the disks on one node,then restart HACMP
Stop both nodes and perform the migration all at once using standard AIX commands in parallel, then restart the cluster
Use C-SPOC to add the new disks to the cluster and migrate the information off the existing disks, then remove the old disks with C-SPOC
第24题:
rg1 is configured with a delayed fallback timer
Settling time policy has not been configured for rg1
Node1 does not have sufficient resources to support rg1
Node2 is the first in the ’Default Node Priority’ list for resource group rg1