单选题Bob, a technician, wants to run antivirus scans on every machine on a daily basis. To minimize the impact to all system resources, which of the following is the BEST time to schedule the scans to run?()A 5:00 p.m. - 7:00 p.m.B 7:30 a.m. - 9:30 a.m.C 11

题目
单选题
Bob, a technician, wants to run antivirus scans on every machine on a daily basis. To minimize the impact to all system resources, which of the following is the BEST time to schedule the scans to run?()
A

5:00 p.m. - 7:00 p.m.

B

7:30 a.m. - 9:30 a.m.

C

11:00 p.m. - 1:00 a.m.

D

12:00 p.m. - 2:00 p.m.


相似考题

2.To: All Griffin Corporation Employees From: Sally Kleinman, Director, Employee Relations Re: Employee Fitness Center Sent: Thursday, November 1, 9:46 A.M. Dear Colleagues: As you know, Griffin Corporation recognizes the importance of having an excellent exercise facility on the premises. Over the past three years, we have worked hard to improve the employee fitness center: we have purchased new exercise equipment, renovated the locker rooms, and begun offering "Welcome Aboard! ", a safety training course. Two months ago, you responded enthusiastically to a survey about this fitness facility. Based on our recommendations, changes are planning for the fitness center. They will take effort on December 1. First of all, as requested, the fitness center will stay open three extra hours Monday through Thursday. Also, a new series of classes-most of them suggested by you-will begin. Finally,those of you who have been using the center will be pleased to hear that popular personal trainer Joseph Santiago will be promoted to manager of the fitness center. We encourage more employees to take advantage of all the fitness center has to offer. Membership will continue to be subsidized and will remain at $15 per month. In addition, and for a limited time only, we are now offering a special rate for new members, members who sign up before December 1 will only be charged $10 per month for the next six months. Please contact Joseph Santiago to sign up at this new reduced rate. Best Regards, Sally Kleinman GRIFFIN EMPLOYEE FITNESS CENTER:NEW SCHEDULE (as of December 1) Hours of Operation Group Classes Monday6:00 A.M.-9:00 P.M.MondayWeight lifting12:00-1:00 P.M. Tuesday6:00 A.M.-9:00 P.M. TuesdayAerobic workout 6:00-7:00 P.M. Wednesday 6:00 A.M.-9:00 P.M.Wednesday Kickboxing 12:00-1:00 P.M. Thursday 6:00 A.M.-9:00 P.M. ThursdayStep aerobics6:00-7:00 P.M. Friday 6:00 A.M.-9:00 P.M.Friday Yoga7:00-$:30 A.M. Saturday 6:00 A.M.-9:00 P.M.SaturdayCross training9:00-1:30 A.M. SundayCLOSED ALL DAY Sunday CLOSED ALL DAY Reminders 1. Please do not use equipment for more than 30 minutes if other members are waiting to use it. 2. Members may bring one guest per visit. Guests under 18 must be accompanied by a member at all times. 3. Registration is not required for classes, but class size is limited to 15 participants. Please arrive early to secure a place. Goals and bags should be left in the locker room so that all class participants have plenty of space. 4. New members are required to complete a"Welcome Aboard" class before using any equipment. 5. Members must carry their membership card at all times while in the center. Whoever is in charge of_______the event must have the ability to work OH multipletasks at the same time.A.Coordinating B.Intending C.collaborating D.depending

4.To: All Griffin Corporation Employees From: Sally Kleinman, Director, Employee Relations Re: Employee Fitness Center Sent: Thursday, November 1, 9:46 A.M. Dear Colleagues: As you know, Griffin Corporation recognizes the importance of having an excellent exercise facility on the premises. Over the past three years, we have worked hard to improve the employee fitness center: we have purchased new exercise equipment, renovated the locker rooms, and begun offering "Welcome Aboard! ", a safety training course. Two months ago, you responded enthusiastically to a survey about this fitness facility. Based on our recommendations, changes are planning for the fitness center. They will take effort on December 1. First of all, as requested, the fitness center will stay open three extra hours Monday through Thursday. Also, a new series of classes-most of them suggested by you-will begin. Finally,those of you who have been using the center will be pleased to hear that popular personal trainer Joseph Santiago will be promoted to manager of the fitness center. We encourage more employees to take advantage of all the fitness center has to offer. Membership will continue to be subsidized and will remain at $15 per month. In addition, and for a limited time only, we are now offering a special rate for new members, members who sign up before December 1 will only be charged $10 per month for the next six months. Please contact Joseph Santiago to sign up at this new reduced rate. Best Regards, Sally Kleinman GRIFFIN EMPLOYEE FITNESS CENTER:NEW SCHEDULE (as of December 1) Hours of Operation Group Classes Monday6:00 A.M.-9:00 P.M.MondayWeight lifting12:00-1:00 P.M. Tuesday6:00 A.M.-9:00 P.M. TuesdayAerobic workout 6:00-7:00 P.M. Wednesday 6:00 A.M.-9:00 P.M.Wednesday Kickboxing 12:00-1:00 P.M. Thursday 6:00 A.M.-9:00 P.M. ThursdayStep aerobics6:00-7:00 P.M. Friday 6:00 A.M.-9:00 P.M.Friday Yoga7:00-$:30 A.M. Saturday 6:00 A.M.-9:00 P.M.SaturdayCross training9:00-1:30 A.M. SundayCLOSED ALL DAY Sunday CLOSED ALL DAY Reminders 1. Please do not use equipment for more than 30 minutes if other members are waiting to use it. 2. Members may bring one guest per visit. Guests under 18 must be accompanied by a member at all times. 3. Registration is not required for classes, but class size is limited to 15 participants. Please arrive early to secure a place. Goals and bags should be left in the locker room so that all class participants have plenty of space. 4. New members are required to complete a"Welcome Aboard" class before using any equipment. 5. Members must carry their membership card at all times while in the center. William was pleased to see the executives respond So_______to the proposal he hadbeen working on.A.Frustratingly B.enthusiastically C.simply D.indifferently

更多“单选题Bob, a technician, wants to run antivirus scans on every machine on a daily basis. To minimize the impact to all system resources, which of the following is the BEST time to schedule the scans to run?()A 5:00 p.m. - 7:00 p.m.B 7:30 a.m. - 9:30 a.m.C 11”相关问题
  • 第1题:

    To: All Griffin Corporation Employees
    From: Sally Kleinman, Director, Employee Relations
    Re: Employee Fitness Center
    Sent: Thursday, November 1, 9:46 A.M.
    Dear Colleagues:
    As you know, Griffin Corporation recognizes the importance of having an excellent exercise facility on the premises. Over the past three years, we have worked hard to improve the employee fitness center: we have purchased new exercise equipment, renovated the locker rooms, and begun offering "Welcome Aboard! ", a safety training course.
    Two months ago, you responded enthusiastically to a survey about this fitness facility. Based on our recommendations, changes are planning for the fitness center. They will take effort on December 1. First of all, as requested, the fitness center will stay open three extra hours Monday through Thursday. Also, a new series of classes-most of them suggested by you-will begin. Finally,those of you who have been using the center will be pleased to hear that popular personal trainer Joseph Santiago will be promoted to manager of the fitness center.
    We encourage more employees to take advantage of all the fitness center has to offer.
    Membership will continue to be subsidized and will remain at $15 per month. In addition, and for a limited time only, we are now offering a special rate for new members, members who sign up before December 1 will only be charged $10 per month for the next six months. Please contact Joseph Santiago to sign up at this new reduced rate.
    Best Regards,
    Sally Kleinman
    GRIFFIN EMPLOYEE FITNESS CENTER:NEW SCHEDULE
    (as of December 1)
    Hours of Operation Group Classes
    Monday6:00 A.M.-9:00 P.M.MondayWeight lifting12:00-1:00 P.M.
    Tuesday6:00 A.M.-9:00 P.M. TuesdayAerobic workout 6:00-7:00 P.M.
    Wednesday 6:00 A.M.-9:00 P.M.Wednesday Kickboxing 12:00-1:00 P.M.
    Thursday 6:00 A.M.-9:00 P.M. ThursdayStep aerobics6:00-7:00 P.M.
    Friday 6:00 A.M.-9:00 P.M.Friday Yoga7:00-$:30 A.M.
    Saturday 6:00 A.M.-9:00 P.M.SaturdayCross training9:00-1:30 A.M.
    SundayCLOSED ALL DAY Sunday CLOSED ALL DAY
    Reminders
    1. Please do not use equipment for more than 30 minutes if other members are waiting to use it.
    2. Members may bring one guest per visit. Guests under 18 must be accompanied by a member at all times.
    3. Registration is not required for classes, but class size is limited to 15 participants. Please arrive early to secure a place. Goals and bags should be left in the locker room so that all class participants have plenty of space.
    4. New members are required to complete a"Welcome Aboard" class before using any
    equipment.
    5. Members must carry their membership card at all times while in the center.
    What are members of the fitness center asked not to do?

    A.Bring guests who are under eighteen years old
    B.Leave classes early
    C.Use equipment for which they have not signed up
    D.Bring bags to classes

    答案:D
    解析:
    “Remindem”下面第四条指出,包应该放在贮藏室,以便为学员们留出更多的空间。

  • 第2题:

    Bob, a technician, wants to run antivirus scans on every machine on a daily basis. To minimize the impact to all system resources, which of the following is the BEST time to schedule the scans to run?()

    • A、5:00 p.m. - 7:00 p.m.
    • B、7:30 a.m. - 9:30 a.m.
    • C、11:00 p.m. - 1:00 a.m.
    • D、12:00 p.m. - 2:00 p.m.

    正确答案:C

  • 第3题:

    In your production database there is a job, CALC_STAT, which has been scheduled to run every Friday at 5:00 p.m. CALC_STAT updates the optimizer statistics for the objects owned by the APPS schema. You want the task to be generic, thereby allowing users to modify the attributes of the task at run time without affecting the original task. Which component of Oracle Scheduler must you define to achieve this?()

    • A、Window
    • B、Program
    • C、Job class
    • D、Window group

    正确答案:B

  • 第4题:

    A technician wants to secure a Windows 7 Ultimate notebook hard drive. Which of the following should the technician do to implement BitLocker?() (Select TWO).

    • A、Disable TPM in the system BIOS
    • B、Run the BitLocker wizard and any necessary partitions
    • C、Enable TPM in the system BIOS
    • D、Enable TPM in the Windows 7 OS files
    • E、Set up the OS and the system files on the same partition

    正确答案:B,C

  • 第5题:

    You need to restore your database back to 9/30/2008 at 18:00. In what order would you run the following commands to compete this task?()   a. restore controlfile until time `09/30/2008:18:00:00’ b. restore database until time `09/30/2008:18:00:00’  c. restore spfile until time `09/30/2008:18:00:00’ d. recover database until time `09/30/2008:18:00:00’ e. alter database open resetlogs f. alter database open

    • A、 b, d, e
    • B、 b, d, f
    • C、 c, a, b, d, e
    • D、 c, a, b, d, f
    • E、 a, b, d, e

    正确答案:A

  • 第6题:

    You are the domain admin for Testking's Active Directory domain. You use a Software Update Services (SUS) server to manage the security updates for all servers that run Windows Server 2003. You need to install three critical security hotfixes from Microsoft. One of the hotfixes cannot be installed in the current production environment because the hotfix causes a custom application to stop responding. You need to install two of the three hotfixes during a maintenance session tomorrow at 2:00 A.M. You need to automate the installation process. What should you do?()

    • A、Schedule a task by using Task Scheduler on each server. Set the task to run Wupdmgr.exe at 2:00 a.m.
    • B、Synchronize the SUS server. Approve only the updates that you want to install. Configure the SUS Group Policy setting to check for updates at 2:00 a.m.
    • C、On the SUS server, run the wmic qfe command, and the run the net time /setntp:0200 command.
    • D、On the SUS server, edit the History-approve.xml file to include only the updates that you want to install. The use the AT command to schedule Sus10sp1.exe to run at 2:00 a.m.

    正确答案:B

  • 第7题:

    单选题
    In your production database there is a job, CALC_STAT, which has been scheduled to run every Friday at 5:00 p.m. CALC_STAT updates the optimizer statistics for the objects owned by the APPS schema. You want the task to be generic, thereby allowing users to modify the attributes of the task at run time without affecting the original task. Which component of Oracle Scheduler must you define to achieve this?()
    A

    Window

    B

    Program

    C

    Job class

    D

    Window group


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    Bob, a technician, wants to run antivirus scans on every machine on a daily basis. To minimize the impact to all system resources, which of the following is the BEST time to schedule the scans to run?()
    A

    5:00 p.m. - 7:00 p.m.

    B

    7:30 a.m. - 9:30 a.m.

    C

    11:00 p.m. - 1:00 a.m.

    D

    12:00 p.m. - 2:00 p.m.


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    Your database operates in ARCHIVELOG mode and user/x7fmanaged consistent backups are performed every Sunday night. On Tuesday, at 9:00 a.m. the current log sequence number was 369. Also, on Tuesday you lost the data file belonging to the SYSTEM tablespace and an archivelog file (sequence number 356) that contained redo entries between 8:00 a.m. and 8:30 a.m. With reference to this scenario, what would you do to recover the database?()
    A

    restore all the data files from last Sunday’s backup, and then perform a time­based recovery

    B

    restore all the data files from last Sunday’s backup, and then perform a cancel­based recovery

    C

    restore all the data files from last Sunday’s backup, and then perform a change­based recovery

    D

    restore only data files that belong to the SYSTEM tablespace from last Sunday’s backup, and then perform a complete recovery


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    Which command will restore all datafiles to the date 9/30/2008 at 18:00 hours? ()
    A

    restore datafiles until time '09/28/2008:21:03:11'

    B

    restore database files until time '09/28/2008:18:00:00'

    C

    restore database until time '09/28/2008:18:00:00'

    D

    recover database until time '09/28/2008:18:00:00'

    E

    recover database until timestamp '09/28/2008:18:00:00'


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    Which of the following commands scans and verifies system protected files?()
    A

    VERIFY

    B

    SFC

    C

    CHKDSK

    D

    CHKNTFS


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    You are the network administrator for All network servers run Windows Server 2003. A member server named TESTKING1 hosts several hundred folders, which reside in various locations on the server. TESTKING1 is configured to run a normal backup of the folder every Saturday at 1:00 A.M. You discover that users edit the contents of the folders on Saturday and Sunday. You need to use the Backup utility to reschedule the backup job so that it runs every Monday at 1:00 A.M. instead of every Saturday at 1:00 A.M. You must achieve this goal by using the minimum amount of administrative effort. What should you do?()
    A

    Specify Monday as the start date of the job.

    B

    Reconfigure the job schedule to run the backup every Monday at 1:00 a.m.

    C

    Add an additional schedule to the job. Configure the additional schedule to run the backup on Monday at 1:00 a.m.

    D

    Use the Repeat Task option to configure the existing job to repeat every 48 hours until an interval of 336 hours passes.


    正确答案: B
    解析: 暂无解析

  • 第13题:

    To: All Griffin Corporation Employees
    From: Sally Kleinman, Director, Employee Relations
    Re: Employee Fitness Center
    Sent: Thursday, November 1, 9:46 A.M.
    Dear Colleagues:
    As you know, Griffin Corporation recognizes the importance of having an excellent exercise facility on the premises. Over the past three years, we have worked hard to improve the employee fitness center: we have purchased new exercise equipment, renovated the locker rooms, and begun offering "Welcome Aboard! ", a safety training course.
    Two months ago, you responded enthusiastically to a survey about this fitness facility. Based on our recommendations, changes are planning for the fitness center. They will take effort on December 1. First of all, as requested, the fitness center will stay open three extra hours Monday through Thursday. Also, a new series of classes-most of them suggested by you-will begin. Finally,those of you who have been using the center will be pleased to hear that popular personal trainer Joseph Santiago will be promoted to manager of the fitness center.
    We encourage more employees to take advantage of all the fitness center has to offer.
    Membership will continue to be subsidized and will remain at $15 per month. In addition, and for a limited time only, we are now offering a special rate for new members, members who sign up before December 1 will only be charged $10 per month for the next six months. Please contact Joseph Santiago to sign up at this new reduced rate.
    Best Regards,
    Sally Kleinman
    GRIFFIN EMPLOYEE FITNESS CENTER:NEW SCHEDULE
    (as of December 1)
    Hours of Operation Group Classes
    Monday6:00 A.M.-9:00 P.M.MondayWeight lifting12:00-1:00 P.M.
    Tuesday6:00 A.M.-9:00 P.M. TuesdayAerobic workout 6:00-7:00 P.M.
    Wednesday 6:00 A.M.-9:00 P.M.Wednesday Kickboxing 12:00-1:00 P.M.
    Thursday 6:00 A.M.-9:00 P.M. ThursdayStep aerobics6:00-7:00 P.M.
    Friday 6:00 A.M.-9:00 P.M.Friday Yoga7:00-$:30 A.M.
    Saturday 6:00 A.M.-9:00 P.M.SaturdayCross training9:00-1:30 A.M.
    SundayCLOSED ALL DAY Sunday CLOSED ALL DAY
    Reminders
    1. Please do not use equipment for more than 30 minutes if other members are waiting to use it.
    2. Members may bring one guest per visit. Guests under 18 must be accompanied by a member at all times.
    3. Registration is not required for classes, but class size is limited to 15 participants. Please arrive early to secure a place. Goals and bags should be left in the locker room so that all class participants have plenty of space.
    4. New members are required to complete a"Welcome Aboard" class before using any
    equipment.
    5. Members must carry their membership card at all times while in the center.
    All of the machinery must be carefully inspected before production at the plant is allowedto_______.

    A.Inhibit
    B.Comply
    C.motivate
    D.proceed

    答案:D
    解析:
    分析整句的意思,“before”引导的状语从句表示“准许进行生产”,因此意为“进行”的D为正确答案。

  • 第14题:

    Which command will restore all datafiles to the date 9/30/2008 at 18:00 hours? ()

    • A、restore datafiles until time '09/28/2008:21:03:11'
    • B、restore database files until time '09/28/2008:18:00:00'
    • C、restore database until time '09/28/2008:18:00:00'
    • D、recover database until time '09/28/2008:18:00:00'
    • E、recover database until timestamp '09/28/2008:18:00:00'

    正确答案:C

  • 第15题:

    You are the network administrator for All network servers run Windows Server 2003. A member server named TESTKING1 hosts several hundred folders, which reside in various locations on the server. TESTKING1 is configured to run a normal backup of the folder every Saturday at 1:00 A.M. You discover that users edit the contents of the folders on Saturday and Sunday. You need to use the Backup utility to reschedule the backup job so that it runs every Monday at 1:00 A.M. instead of every Saturday at 1:00 A.M. You must achieve this goal by using the minimum amount of administrative effort. What should you do?()

    • A、Specify Monday as the start date of the job.
    • B、Reconfigure the job schedule to run the backup every Monday at 1:00 a.m.
    • C、Add an additional schedule to the job. Configure the additional schedule to run the backup on Monday at 1:00 a.m.
    • D、Use the Repeat Task option to configure the existing job to repeat every 48 hours until an interval of 336 hours passes.

    正确答案:B

  • 第16题:

    You want to perform the database backup when user activity on your system is low, such as between 12:00 a.m. and 2:00 am. Which command terminates with an error if the backup is not complete at the end of the specified duration?()

    • A、RMAN> BACKUP DURATION 2:00 MINIMIZE LOAD DATABASE
    • B、RMAN> BACKUP DURATION 2:00 PARTIAL FILESPERSET 1 DATABASE
    • C、RMAN> BACKUP DURATION 2:00 PARTIAL MINIMIZE TIME DATABASE 
    • D、RMAN> BACKUP AS COPY DURATION 2:00 PARTIAL MINIMIZE LOAD DATABASE

    正确答案:A

  • 第17题:

    You took the DATA1 tablespace offline at 10:00 A.M. At 12:30 P.M., a schema of a user is dropped and purged from the Recycle Bin. You noticed this at 2:00 P.M. and decided to perform an incomplete recovery.  Which datafiles will you recover?()

    • A、 all the datafiles in the database
    • B、 the datafiles associated with the SYSTEM tablespace
    • C、 the datafiles associated with the DATA1 tablespace
    • D、 all the datafiles in the database except those associated with the DATA1 tablespace

    正确答案:D

  • 第18题:

    单选题
    You want to perform the database backup when user activity on your system is low, such as between 12:00 a.m. and 2:00 am. Which command terminates with an error if the backup is not complete at the end of the specified duration?()
    A

    RMAN> BACKUP DURATION 2:00 MINIMIZE LOAD DATABASE

    B

    RMAN> BACKUP DURATION 2:00 PARTIAL FILESPERSET 1 DATABASE

    C

    RMAN> BACKUP DURATION 2:00 PARTIAL MINIMIZE TIME DATABASE 

    D

    RMAN> BACKUP AS COPY DURATION 2:00 PARTIAL MINIMIZE LOAD DATABASE


    正确答案: C
    解析: 暂无解析

  • 第19题:

    单选题
    ou can visit Galloway Wildlife Conservation Park ______
    A

    at 9:00 a. m. on 7th December

    B

    at 11:00 a.m. on 7th December

    C

    at 9:00 a.m. on 7th September

    D

    at 11:00 a. m. on 7th September


    正确答案: A
    解析:
    【语篇解读】本文是一篇说明文,题材为旅游信息。文章介绍了Galloway野生动物保护公园。内容包括公园里的动物、公园的设施、游玩须知、票价等。
    细节理解题。根据文章中间部分Open from 1st February to 30th October. 10:00 a.m. to 6:00 p.m.可知,开放时间是2月1日到10月30日,上午10点到下午6点。故选D项。

  • 第20题:

    单选题
    At which of the following times will the bus leave the main hall?
    A

    8:00; 9:00; 10:00; 11:00.

    B

    8:30; 9:30; 10:30; 11:30.

    C

    8:30; 9:00; 9:30; 10:00.

    D

    8:00; 9:30; 11:00; 12:30.


    正确答案: D
    解析:
    事实细节题。由关键词the bus leave the main hall定位第二段第一句“During the summer holidays, buses going to the town centre will leave the main hall every hour on the half hour during the day.”可以得知A项正确。

  • 第21题:

    单选题
    When can we visit Art Museum?
    A

    11:00 am-7:00 pm every day

    B

    8:00 am-6:00 pm on weekdays

    C

    8:00 am-9:30 am every Sunday

    D

    8:00 am-6:00 pm on weekends


    正确答案: D
    解析:
    【文章大意】本文主要介绍了三个景点的基本信息,其中包括参观内容、票价、开放时间以及地址。
    由关键词Art Museum可迅速定位至文章第三部分,由文中“8:00 am-6:00 pm on weekdays”可知B选项8:00 am-6:00 pm on weekdays正确。

  • 第22题:

    单选题
    You need to restore your database back to 9/30/2008 at 18:00. In what order would you run the following commands to compete this task?()   a. restore controlfile until time `09/30/2008:18:00:00’ b. restore database until time `09/30/2008:18:00:00’  c. restore spfile until time `09/30/2008:18:00:00’ d. recover database until time `09/30/2008:18:00:00’ e. alter database open resetlogs f. alter database open
    A

     b, d, e

    B

     b, d, f

    C

     c, a, b, d, e

    D

     c, a, b, d, f

    E

     a, b, d, e


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()
    A

    POWER5 runs in an SMP mode as default

    B

    POWER5 can run in a full system mode the same as the p690

    C

    POWER5 can run in full system mode with the purchase of PLM

    D

    POWER5 can run in a full system mode, but it is in LPAR mode


    正确答案: A
    解析: 暂无解析

  • 第24题:

    单选题
    You took the DATA1 tablespace offline at 10:00 A.M. At 12:30 P.M., a schema of a user is dropped and purged from the Recycle Bin. You noticed this at 2:00 P.M. and decided to perform an incomplete recovery.  Which datafiles will you recover?()
    A

     all the datafiles in the database

    B

     the datafiles associated with the SYSTEM tablespace

    C

     the datafiles associated with the DATA1 tablespace

    D

     all the datafiles in the database except those associated with the DATA1 tablespace


    正确答案: D
    解析: 暂无解析