单选题The boot .net.tcp.client fileset is broken. Which of the following procedures must be performed to fix the problem?()A Reinstall with the Force Overwrite optionB Update the fileset at a lower levelC Install the update in the commit stateD Reboot the sy

题目
单选题
The boot .net.tcp.client fileset is broken. Which of the following procedures must be performed to fix the problem?()
A

Reinstall with the Force Overwrite option

B

Update the fileset at a lower level

C

Install the update in the commit state

D

Reboot the system to fix the broken filelist


相似考题
更多“单选题The boot .net.tcp.client fileset is broken. Which of the following procedures must be performed to fix the problem?()A Reinstall with the Force Overwrite optionB Update the fileset at a lower levelC Install the update in the commit stateD Reboot the sy”相关问题
  • 第1题:

    The boot .net.tcp.client fileset is broken. Which of the following procedures must be performed to fix the problem?()

    A.Reinstall with the Force Overwrite option

    B.Update the fileset at a lower level

    C.Install the update in the commit state

    D.Reboot the system to fix the broken filelist


    参考答案:A

  • 第2题:

    Which of the following procedures should be performed to minimize possible problems for a customer when updating software?()

    • A、Apply the updates without committing.
    • B、Commit the new updates to be certain there is no change after the next reboot.
    • C、Update one fileset at a time and test to ensure that it works before updating the next fileset.
    • D、No action is necessary since the software can always be uninstalled and re-installed.

    正确答案:A

  • 第3题:

    After updating the system, the system administrator runs the lppchk-v command. During this process, the bos.rte.libc is in a broken state. Which of the following procedures should be performed to fix this problem?()

    • A、Reinstall the system
    • B、Use installp -r to reject the broken fileset
    • C、Use installp -acgFXd to reinstall the fileset at the same level
    • D、Use install -u to remove this broken fileset and reinstall it again

    正确答案:C

  • 第4题:

    When a user tries to log into the system, the following error occurs:  "3004-004. You must "exec" login from the lowest login Shell". Which of the following procedures should be performed next to determine the cause of the problem?()

    • A、 Reboot the system. 
    • B、 Increase the number of ptys. 
    • C、 Increase number of licenses. 
    • D、 Run df -k to check for full filesystems.

    正确答案:D

  • 第5题:

    A system was running properly until a reboot. Following the reboot, the system LED displayed cycles between 0223 and 0229. Which of the following procedures should be performed next?()

    • A、Power down then power up the system
    • B、Boot into diagnostic mode and run fsck
    • C、Boot from installation media and run bosboot
    • D、Boot into maintenance mode and check the bootlist

    正确答案:D

  • 第6题:

    Which of the following procedures is safest perform when updating licensed program products?()

    • A、Load all updates in the commit state
    • B、Load all updates in the applied state until tested
    • C、Perform all software updates in maintenance mode
    • D、Use the Force Overwrite option for filesets that are already committed.

    正确答案:B

  • 第7题:

    The following actions can be taken to remove a fileset EXCEPT.()

    • A、Removing a fileset update leaving the base fileset
    • B、Removing a base fileset in the BROKEN state
    • C、Removing a base fileset in the COMMITTED state and all fileset updates in the APPLIED stat
    • D、Removing a base fileset in the COMMITTED state and all fileset updates in the COMMITTED state

    正确答案:A

  • 第8题:

    单选题
    An administrator is installing a C compiler on a system. According to the compiler’s documentation, the AIX fileset bos.adt.libm must be installed prior to the installation of the compiler.  Which of the following commands would verify installation of the prerequisite fileset()
    A

    installp

    B

    instfix

    C

    Ippchk

    D

    Islpp


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    Which of the following procedures is safest perform when updating licensed program products?()
    A

    Load all updates in the commit state

    B

    Load all updates in the applied state until tested

    C

    Perform all software updates in maintenance mode

    D

    Use the Force Overwrite option for filesets that are already committed.


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    The boot .net.tcp.client fileset is broken. Which of the following procedures must be performed to fix the problem?()
    A

    Reinstall with the Force Overwrite option

    B

    Update the fileset at a lower level

    C

    Install the update in the commit state

    D

    Reboot the system to fix the broken filelist


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    When a user tries to log into the system, the following error occurs:  "3004-004. You must "exec" login from the lowest login Shell". Which of the following procedures should be performed next to determine the cause of the problem?()
    A

     Reboot the system. 

    B

     Increase the number of ptys. 

    C

     Increase number of licenses. 

    D

     Run df -k to check for full filesystems.


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    Which of the following procedures should be performed to minimize possible problems for a customer when updating software?()
    A

    Apply the updates without committing.

    B

    Commit the new updates to be certain there is no change after the next reboot.

    C

    Update one fileset at a time and test to ensure that it works before updating the next fileset.

    D

    No action is necessary since the software can always be uninstalled and re-installed.


    正确答案: C
    解析: 暂无解析

  • 第13题:

    IBM ToolsCenter Bootable Media Creator is used to create bootable media. Which of the following functions can be performed with this tool?()

    • A、Update Firmware, Update Drivers, Run Diagnostics Install Windows
    • B、Update Firmware, Update Drivers, Run Diagnostics Install Windows and Linux Operating systems
    • C、Update Firmware, Run Diagnostics, Install Windows
    • D、Update Firmware, Update Drivers. Install Windows

    正确答案:C

  • 第14题:

    In order to upgrade from AIX Version 4.3 to AIX Version 5.2, which of the following actions should be performed?()

    • A、Run smit update_all
    • B、Run smit install_all
    • C、Boot from the installation media
    • D、Run update_all from the mounted CD

    正确答案:C

  • 第15题:

    A System x client is interested in IBM ToolsCenter Bootable Media Creator but is concerned about functions Which describes the functions of ToolsCenter Bootable Media of the following?()

    • A、Updatefirmware, update drivers, run diagnostics, install Windows
    • B、Update firmware, run diagnostics, install Windows
    • C、Update firmware, run diagnostics, install Windows, and install Linux
    • D、Update firmware, update drivers, install Windows, and install Linux

    正确答案:B

  • 第16题:

    The boot .net.tcp.client fileset is broken. Which of the following procedures must be performed to fix the problem?()

    • A、Reinstall with the Force Overwrite option
    • B、Update the fileset at a lower level
    • C、Install the update in the commit state
    • D、Reboot the system to fix the broken filelist

    正确答案:A

  • 第17题:

    A base operating system has just been installed, successfully rebooted, and the user is now logged in as root. The user wants the server software bundle installed, but has additional software that must be installed with the bundle. Which of the following procedures should be performed to complete the installation?()

    • A、Add the software to /usr/sys/inst.images
    • B、Update the bundle file in /usr/sys/inst.images
    • C、Install the bundle filelists and run update all
    • D、Add the software to the bundle file in /usr/sys/inst.data/sys_bundles

    正确答案:D

  • 第18题:

    A software update was installed using the Apply option, however the update is no longer required. Which of the following procedures should be performed to remove the update?()

    • A、Use the Reject option
    • B、Delete the update form the /usr/lpp directories
    • C、Use the Force Overwrite option to re-install the earlier version
    • D、Commit the update and then remove the updated product filesets using SMIT

    正确答案:A

  • 第19题:

    单选题
    After updating the system, the system administrator runs the lppchk-v command. During this process, the bos.rte.libc is in a broken state. Which of the following procedures should be performed to fix this problem?()
    A

    Reinstall the system

    B

    Use installp -r to reject the broken fileset

    C

    Use installp -acgFXd to reinstall the fileset at the same level

    D

    Use install -u to remove this broken fileset and reinstall it again


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    In order to upgrade from AIX Version 4.3 to AIX Version 5.2, which of the following actions should be performed?()
    A

    Run smit update_all

    B

    Run smit install_all

    C

    Boot from the installation media

    D

    Run update_all from the mounted CD


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    The following actions can be taken to remove a fileset EXCEPT.()
    A

    Removing a fileset update leaving the base fileset

    B

    Removing a base fileset in the BROKEN state

    C

    Removing a base fileset in the COMMITTED state and all fileset updates in the APPLIED stat

    D

    Removing a base fileset in the COMMITTED state and all fileset updates in the COMMITTED state


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    IBM ToolsCenter Bootable Media Creator is used to create bootable media. Which of the following functions can be performed with this tool?()
    A

    Update Firmware, Update Drivers, Run Diagnostics Install Windows

    B

    Update Firmware, Update Drivers, Run Diagnostics Install Windows and Linux Operating systems

    C

    Update Firmware, Run Diagnostics, Install Windows

    D

    Update Firmware, Update Drivers. Install Windows


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    After a successful recovery, the system administrator wishes to remove the fileset bos.net.tcp.server and all dependent software. After running an lslpp command, it is verified that the fileset is in the BROKEN state. What is the correct method for deinstallation?()
    A

    Use installp -u command with -g to remove the fileset and all dependent software.

    B

    Use installp -c command to commit fileset; use installp command with -g to remove the fileset and all dependent software.

    C

    Use installp -C command to perform cleanup of fileset; use install command with -g to remove the fileset and all dependent software.

    D

    Use installp -a command to apply fileset; use installp command with -g to remove the fileset and all dependent software.


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    A software update was installed using the Apply option, however the update is no longer required. Which of the following procedures should be performed to remove the update?()
    A

    Use the Reject option

    B

    Delete the update form the /usr/lpp directories

    C

    Use the Force Overwrite option to re-install the earlier version

    D

    Commit the update and then remove the updated product filesets using SMIT


    正确答案: B
    解析: 暂无解析