The room temperature has reached 23C (73.4F).
A Blade within the chassis has been shut down.
The ambient temperature in the data center has increased
One of the additional System X servers in the BladeCenter rack has failed.
第1题:
An SNMP alert has been generated by a server in the main data center.The alert stated that the internal temperature of the server has exceeded the threshold.No other servers in the rack have experienced problems,and no other alerts have come from that server about any other events.Which of the following is the cause of this issue?()
第2题:
An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()
第3题:
You have a request to put together IBM System x and blade servers attached to IBM DS4000 Storage: all in a rack. Your customer is also requesting services. What IBM resource will help you put these different products together?()
第4题:
While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()
第5题:
A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()
第6题:
A customer purchased a new IBM xSeries x445. They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server. The rack houses an existing UPS unit for the entire rack. Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()
第7题:
Redundant power supplies on the servers
Redundant PDUs in the rack
edundant power supplies in the servers and redundant PDUs in the rack
Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)
第8题:
Have optional Fibre Channel and Ethernet switches been installed in the server?
What is the available kVA value of the UPS?
Are there sufficient empty socket outlets in the UPS?
What is the impact on the power consumption of the data center cooling system?
第9题:
IBM DS5000 Cabling Tool
IBM e-Configurator Tool
IBM Pre-Installation TDA Checklist
IBM Standalone Solutions Configuration Tool
第10题:
Higher rack density that reduces data center footprints
Internal upgrades that only IBM can offer
Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches
The Rear Door Heat eXchanger that only IBM can offer
第11题:
Add Rear Door Heat eXchanger
Add fans to the top of the racks
Increase circulation from Data Center raised floor
Change to perforated doors
第12题:
The room temperature has reached 23C (73.4F).
A Blade within the chassis has been shut down.
The ambient temperature in the data center has increased
One of the additional System X servers in the BladeCenter rack has failed.
第13题:
A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack. Which IBM BladeCenter Chassis should be recommended? ()
第14题:
A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()
第15题:
A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers. Which of the following should the Sales Specialist emphasize to address the pricing difference?()
第16题:
An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix of the following?()
第17题:
An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix? ()
第18题:
Disk Magic
TPC for Data
CLARiiON Procedure Generator
System Storage Interoperability Center
第19题:
sector size and the amount of production data
existing RAID levels and the disk drive speed
sector size and existing RAID levels
amount of production data and the disk drive speed
第20题:
Warm air flow is permitted through the front bezel
The system is labeled so that it can be identified
Verify the change control process can be implemented
Determine the correct power requirements
第21题:
BladeCenter E
BladeCenter H
BladeCenter T
BladeCenter HT
第22题:
IBM System x and BladeCenter Business Partner Guidebook
IBM Sizing Guides
IBM Configuration & Options Guide (COG)
IBM Standalone Solutions Configuration Tool (SSCT)
第23题:
Add Rear Door HeateXchanger
Add fans to the top of the racks
Increase circulation from Data Center raised floor
Change to perforated doors
第24题:
Rack cooling equipment failure
Dust collection in the server
Server processor failure
Server power supply failure