another
one other
the other
other
第1题:
下列语句能给数组赋值而不使用for循环的是
A.myArray{[1]="One";[2]="Two";[3]="Three";}
B.String s[5]=new String[]{"Zero", "One", "Two", "There", "Four"};
C.String s[]=new String[]{"Zero", "One", "Two", "There", "Four"};
D.String s[]=new String[]=|"Zero", "One", "Two", "There", "Four"};
第2题:
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()
A.An additional switch for the new HMC
B.Asynchronous adapters on the new HMC
C.The two 570 servers are directly connected to the new HMC
D.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
第3题:
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
A. operator training
B. cache size of the two clusters
C. fibre bandwidth capability between the sites
D. number of stacked tape drives attached to each cluster
第4题:
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
第5题:
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
第6题:
A medium-sized company has a Class C IP address. It has two Cisco routers and one non-Cisco router. All three routers are using RIP version 1. The company network is using the block of 198.133.219.0/24. The company has decided it would be a good idea to split the network into three smaller subnets and create the option of conserving addresses with VLSM. What is the best course of action if the company wants to have 40 hosts in each of the three subnets?()
第7题:
You are designing the placement of the global catalog servers. You want to use the minimum number of global catalog servers that are required. Which design should you use?()
第8题:
Convert all the routers to EIGRP and use 198.133.219.32/27, 198.133.219.64/27, and 198.133.219.92/27 as the new subnetworks.
Maintain the use of RIP version 1 and use 198.133.219.32/27, 198.133.219.64/27, and 133.219.92/27 as the new subnetworks.
Convert all the routers to EIGRP and use 198.133.219.64/26, 198.133.219.128/26, and 133.219.192/26 as the new subnetworks.
Convert all the routers to RIP version 2 and use 198.133.219.64/26, 198.133.219.128/26, and 133.219.192/26 as the new subnetworks.
Convert all the routers to OSPF and use 198.133.219.16/28, 198.133.219.32/28, and 198.133.219.48/28 as the new subnetworks.
Convert all the routers to static routes and use 198.133.219.16/28, 198.133.219.32/28, and
第9题:
Add a new domain controller in the branch office.
Configure the branch office domain controller as a global catalog server.
Transfer the RID Master role to the branch office domain controller.
Transfer the Infrastructure Master role to the branch office domain controller.
第10题:
Partition one starts and has 3.0 logical processors. Partition two does not start. Partition three has 1.0 logical processors.
Partition one starts and has 1.5 logical processors. Partition two has 1.0 logical processors. Partition three has 0.1 processors.
Partition one starts and has 2.0 logical processors. Partition two start and has 2.0 logical processors. Partition three does not start.
Partition one starts and has 2.0 logical processors. Partition two has 1.0 logical processors. Partition three has 0.1 logical processors.
第11题:
Inheritance
Low cohesion
Tight coupling
High cohesion
Loose coupling
Object immutability
第12题:
Multicasting
Proxy server
NAT
Subnetting
第13题:
A new company has been given one public IP address. The company employs 200 users requiring Internet access from the headquarters.Which of the following can be implemented to provide Internet access for all the employees?()
A. Multicasting
B. Proxy server
C. NAT
D. Subnetting
第14题:
下列语句能给数组赋值,而不使用for循环的是
A.myArray{[1]="One";[2]="Two";[3]="Three";}
B.String s[5]=new String[] {"Zero","One","Two","Three","Four"};
C.String s[]=new String[] {"Zero","One","Two","Three","Four"};
D.String s[]=new String[]= {"Zero","One","Two","Three","Four"};
第15题:
第16题:
A company has a business application that provides its users with many different reports: receivables reports, payables reports, revenue projects, and so on. The company has just purchased somenew, state-of-the-art, wireless printers, and a programmer has been assigned the task of enhancing all ofthe reports to use not only the company’s old printers, but the new wireless printers as well. When the programmer starts looking into the application, the programmer discovers that because of the design of theapplication, it is necessary to make changes to each report to support the new printers. Which two designconcepts most likely explain this situation? ()
第17题:
The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch.What must be done to ensure that this new switch becomes the root bridge on the network?()
第18题:
Your company has a main office and two branch offices. The main office is located in London. The branch offices are located in New York and Paris. Your network consists of an Active Directory forest that contains three domains named contoso.com, paris.contoso.com, and newyork.contoso.com. All domain controllers run Windows Server 2008 R2 and have the DNS Server server role installed. The domain controllers for contoso.com are located in the London office. The domain controllers for paris.contoso.com are located in the Paris office. The domain controllers for newyork.contoso.com are located in the New York office. A domain controller in the contoso.com domain has a standard primary DNS zone for contoso.com. Adomain controller in the paris.contoso.com domain has a standard primary DNS zone for paris.contoso.com. A domain controller in the newyork.contoso.com domain has a standard primary DNS zone for newyork.contoso.com. You need to plan a name resolution strategy for the Paris office that meets the following requirements: èIf a WAN link fails, clients must be able to resolve hostnames for contoso.com. èIf a WAN link fails, clients must be able to resolve hostnames for newyork.contoso.com. èThe DNS servers in Paris must be updated when new authoritative DNS servers are added tonewyork.contoso.com. What should you include in your plan?()
第19题:
You need to recommend the server configurations for the new failover cluster. The configurations must support the company's planned changes Which two actions should you recommend?()
第20题:
One global catalog server in New York.
Two global catalog servers in New York.
One global catalog server in Chicago and one global catalog server in New York.
Two global catalog servers in Chicago and two global catalog servers in New York.
One global catalog server in Chicago, one global catalog server in New York, and one global catalog server in Boston.
第21题:
Inheritance
Tight coupling
Low cohesion
High cohesion
Loose coupling
第22题:
Inheritance
Low cohesion
Tight coupling
High cohesion
Loose coupling
Object immutablility
第23题:
Another
one other
the other
other
第24题:
Inheritance
Tight coupling
Low cohesion
High cohesion
Loose coupling
Object immutability