évocation
vocation
intention
résolution
第1题:
Cells do not have _____ of their own.
A、intelligence
B、intelligent
C、intention
D、intellectual
第2题:
SWEEP INT on radar panel is the abbreviation of ________ .
A.sweep introduction
B.sweep interest
C.sweep intention
D.sweep intensity
第3题:
哪个单词与第一个单词的发音是一致的()furniture
第4题:
You need to recommend a monitoring solution for App1 that meets the museum’s technical requirements. What should you include in the recommendation?()
第5题:
Microsoft Hyper-V Server 2008 R2
Microsoft System Center Virtual Machine Manager (VMM)
Windows Deployment Services (WDS)
Windows Server Migration Tools
第6题:
The need to involve solution experts is removed
Financial justification of the proposal is enhanced
Time required to design a solution is decreased
Complex solutions are simplified considerably
第7题:
Archive solution that requires event-based retention
Backup solution that provides version-based expiration
Business continuity solution that provides two years Recovery Time Objective (RTO)
Business continuity solution that provides two years Recovery Point Objective (RPO)
第8题:
glass cleaner
a simple ammonia and water solution followed by an antistatic solution
a bleach solution followed by water
compressed air
第9题:
Document the solution and process.
Establish the most probable cause.
Implement and test the solution.
Identify additional symptoms and problems
第10题:
Modify the deployment schedule of the solution over an extended period of time to reduce the initial cash outlay.
Gain the CFO’s agreement to revisit the solution next quarter and follow-up with an aggressively priced solution.
Present financing options to the CFO showing how to implement the solution while minimizing the monthly cash outlay.
Meet with the CFO to demonstrate the financial impact of the solution to reduce operational expenses and TCO
第11题:
Before the first solution design meeting with the customer
After the solution design proposal is submitted to manufacturing for review
Once the customer has supplied the solution design specifications to the sales team
After the solution design is completed and before the proposal is submitted to the customer
第12题:
a detailed physical and logical topology
a cost analysis of the implemented solution
detailed logs from the AAA and SNMP servers
results from audit testing of the implemented solution
第13题:
It wasn’t an accident.He did it on__________.
A.aim
B.reason
C.intention
D.purpose
第14题:
Which of the following is a benefit of having a Solution Assurance?()
第15题:
A solution provider has proposed a pSeries solution to a new customer. The solution is complex with a number of technologies that are new to the customer. They have a tight timeline for implementation. The solution provider has not been able to get a clear understanding as to how the customer will backup the system. What would be the most appropriate action to address the risks with this solution?()
第16题:
Implement a central store.
Upgrade DC3 to Windows Server 2008 R2.
Create starter Group Policy objects (GPOs).
Deploy Advanced Group Policy Management (AGPM).
第17题:
Microsoft Application Virtualization (App-V)
Microsoft Enterprise Desktop Virtualization (MED-V)
Microsoft Hyper-V Server 2008 R2
Windows XP Mode
第18题:
Purchase one additional Enterprise license.
Purchase two additional Enterprise licenses.
Deploy an additional physical server that runs Microsoft Hyper-V Server 2008 R2.
Deploy an additional physical server that runs Windows Server 2008 R2 Enterprise.
第19题:
event subscriptions
Microsoft SharePoint Foundation 2010 alerts
Microsoft System Center Operations Manager 2007 R2 and the SMTP service
Resource Monitor
第20题:
the use of physical LTO-5 drives and cartridges for virtualization reduces the overall floor spacerequired for the virtual tape solution
the virtual tape solution reduces the number of cartridges and physical drives required, andimproves throughput
the virtual tape solution provides a faster robotic access to virtual cartridges sent to the physicaltape librarywhich guarantees faster accesstimes
the virtual tape solution provides a larger range of virtual tape drives and automates the backupprocess to physical tape by full synchronousreplication
第21题:
Sell Sysback
Conduct a SAR
Sell Supportline
Provide a project timeline
第22题:
a direct-attached storage (DAS) device
a multipath serial-attached SCSI drive with a witness disk
a multipath Fibre Channel logical unit number (LUN) with a witness disk
a multipath iSCSI logical unit number (LUN) with Cluster Shared Volumes (CSVs)
第23题:
An account team proposal review
An installation planning meeting
A solution design development methodology
A technical inspection of a completed solution design