单选题使用AEM 可以检测的平台有()A Power systems (i and p)B System xC System z mainframeD 以上都包括

题目
单选题
使用AEM 可以检测的平台有()
A

Power systems (i and p)

B

System x

C

System z mainframe

D

以上都包括


相似考题
更多“单选题使用AEM 可以检测的平台有()A Power systems (i and p)B System xC System z mainframeD 以上都包括”相关问题
  • 第1题:

    A customer wants to install a pSeries system into an OEM rack.  What critical information is provided in the Site and Hardware Planning Information manual?()

    • A、System dimensions and weight, system power and cooling requirements, and list of supported OEM racks
    • B、System dimensions and weight, list of supported OEM racks, and requirements for installing IBM systems into OEM racks
    • C、System performance specs, system power and cooling requirements, and requirements for installing IBM systems into OEM racks
    • D、System dimensions and weight, system power and cooling requirements, and requirements for installingIBM systems into OEM racks

    正确答案:D

  • 第2题:

    Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()

    • A、AIX
    • B、IBM i
    • C、Linux
    • D、VIO Server

    正确答案:B

  • 第3题:

    Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()

    • A、AIX
    • B、IBMi
    • C、Linux
    • D、VIO Server

    正确答案:B

  • 第4题:

    IBM POWER Systems 和 System p 服务器所支持的 7311-D20 I/O 扩展抽屉是用来安装下列哪些设备的()

    • A、CPU和内存
    • B、硬盘和适配卡
    • C、显示器和键盘
    • D、以上都是

    正确答案:B

  • 第5题:

    What is an advantage of using an HMC rather than IVM for system management?()

    • A、Support for a single VIO Server environment
    • B、Adapters can be dedicated or virtual for each LPAR environment
    • C、Interfaces with Systems Director to manage the Power Systems servers
    • D、Supports multiple Power Systems servers from a single point of control

    正确答案:D

  • 第6题:

    单选题
    A customer has a storage requirement for a mixed IBM Power AIX and System z environment. They require approximately 3 TB of high performance disk for their System z environment. They require approximately 32 TB of low-performance disk for their System p environment. The storage specialist is using Capacity Magic to configure an IBM DS8700.  Which configuration is most appropriate for this customer()
    A

    2 x 300 GB 15k rpm disk drive sets for System z; and 4 x 2 TB 7.2k rpm disk drive sets for Power AIX

    B

    4 x 146 GB 15k rpm disk drive sets for System z; and 4 x 2 TB 7.2k rpm disk drive sets for Power AIX

    C

    2 x 300 GB 10k rpm disk drive sets for System z; and 4 x 300 GB 15k rpm disk drive sets for Power AIX

    D

    2 x 300 GB 15k rpm disk drive sets for System z; and 2 x 1 TB 7.2k rpm disk drive sets for Power AIX


    正确答案: B
    解析: 暂无解析

  • 第7题:

    单选题
    IBM POWER Systems 和 System p 服务器所支持的 7311-D20 I/O 扩展抽屉是用来安装下列哪些设备的()
    A

    CPU和内存

    B

    硬盘和适配卡

    C

    显示器和键盘

    D

    以上都是


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    A customer wants to install a pSeries system into an OEM rack.  What critical information is provided in the Site and Hardware Planning Information manual?()
    A

    System dimensions and weight, system power and cooling requirements, and list of supported OEM racks

    B

    System dimensions and weight, list of supported OEM racks, and requirements for installing IBM systems into OEM racks

    C

    System performance specs, system power and cooling requirements, and requirements for installing IBM systems into OEM racks

    D

    System dimensions and weight, system power and cooling requirements, and requirements for installingIBM systems into OEM racks


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    A customer has a storage requirement for a mixed IBM System p and System z environment. They require approximately 2 TB of high performance disk for their System z environment. They require approximately 25 TB of low-performance disk for their System p environment. The storage specialist is using Capacity Magic to configure an IBM System Storage DS8300.  Which configuration is most appropriate for this customer()
    A

    4 x 73 GB 15k rpm disk drive sets for System z; and 4 x 500 GB 7.2k rpm disk drive sets for System p

    B

    4 x 146 GB 15k rpm disk drive sets for System z; and 2 x 500 GB 7.2k rpm disk drive sets for System p

    C

    2 x 300 GB 10k rpm disk drive sets for System z; and 4 x 300 GB 10k rpm disk drive sets for System p

    D

    2 x 73 GB 15k rpm disk drive sets for System z; and 2 x 500 GB 7.2k rpm disk drive sets for System p


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()
    A

    Order a new HMC to support the p5 system.

    B

    Attach the new p5 system to the existing HMC.

    C

    Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.

    D

    Do nothing.  This system does not require an HMC.


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    A customer wants to consolidate storage from four IBM System p servers and one large IBM System i server. The customer does not have a SAN installed. The customer will require approximately 4 TB for System p and 3 TB for System i. The customer states that performance and isolation of the System i system is most important. Capacity, multi-path access, and replication functions are important for the System p servers.    Which solution best satisfies the customer requirements()
    A

    IBM System Storage DS8100 with 300 GB drives for the System p, 73 GB/15k drives for System i, and advanced functions for System p capacity

    B

    IBM System Storage DS8300 with LPAR, 73 GB/15k drives for System i, and 300 GB drives and advanced functions for System p capacity

    C

    IBM System Storage DS6800 with direct attach, 73 GB/15k drives for System i performance, and 300 GB drives and advanced functions for System p

    D

    IBM System Storage DS6800 with LPAR, 146 GB/15k drives for System i, 500 GB FATA drives for System p


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    A sales team has proposed an IBM System Storage DS8100 configured with 10 TB, split equallybetween IBM System z and IBM System p. The System z environment requires point-in-time copyand the System p environment does not. For the System z environment, 3 TB have beenconfigured with an additional 2 TB for point-in-time copy. What is the least expensive licensescope for point-in-time copy?()
    A

    All and 10 TB

    B

    CKD and 2 TB

    C

    CKD and 5 TB

    D

    CKD and 10 TB


    正确答案: C
    解析: 暂无解析

  • 第13题:

    During a review of environmental requirements before ordering an IBM System z9 server and IBM System Storage DS8700, the customer states that the available power is 220 volts AC.  Which feature should be included with the DS8700 order()  

    • A、Low Voltage
    • B、High Voltage
    • C、Remote System z Power Control
    • D、Battery Assembly

    正确答案:A

  • 第14题:

    Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()

    • A、POWER5 runs in an SMP mode as default
    • B、POWER5 can run in a full system mode the same as the p690
    • C、POWER5 can run in full system mode with the purchase of PLM
    • D、POWER5 can run in a full system mode, but it is in LPAR mode

    正确答案:D

  • 第15题:

    A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system.  How might the pSeries technical specialist aid the customer in addressing their concern?()

    • A、Direct the customer to the Installation Guide for each system to identify the power requirements.
    • B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.
    • C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.
    • D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.

    正确答案:C

  • 第16题:

    A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()

    • A、Order a new HMC to support the p5 system.
    • B、Attach the new p5 system to the existing HMC.
    • C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
    • D、Do nothing.  This system does not require an HMC.

    正确答案:A

  • 第17题:

    A customer has a storage requirement for a mixed IBM Power AIX and System z environment. They require approximately 3 TB of high performance disk for their System z environment. They require approximately 32 TB of low-performance disk for their System p environment. The storage specialist is using Capacity Magic to configure an IBM DS8700.  Which configuration is most appropriate for this customer()

    • A、2 x 300 GB 15k rpm disk drive sets for System z; and 4 x 2 TB 7.2k rpm disk drive sets for Power AIX
    • B、4 x 146 GB 15k rpm disk drive sets for System z; and 4 x 2 TB 7.2k rpm disk drive sets for Power AIX
    • C、2 x 300 GB 10k rpm disk drive sets for System z; and 4 x 300 GB 15k rpm disk drive sets for Power AIX
    • D、2 x 300 GB 15k rpm disk drive sets for System z; and 2 x 1 TB 7.2k rpm disk drive sets for Power AIX

    正确答案:A

  • 第18题:

    单选题
    A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored?()
    A

    Identify which systems are the most critical and bring them up by level of importance.

    B

    Retrieve the latest backup tapes for immediate system restore using the GFS rotation.

    C

    Identify the least critical systems and then power those systems on first.

    D

    Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system.  How might the pSeries technical specialist aid the customer in addressing their concern?()
    A

    Direct the customer to the Installation Guide for each system to identify the power requirements.

    B

    Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.

    C

    Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.

    D

    Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()
    A

    AIX

    B

    IBMi

    C

    Linux

    D

    VIO Server


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    What is an advantage of using an HMC rather than IVM for system management?()
    A

    Support for a single VIO Server environment

    B

    Adapters can be dedicated or virtual for each LPAR environment

    C

    Interfaces with Systems Director to manage the Power Systems servers

    D

    Supports multiple Power Systems servers from a single point of control


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()
    A

    AIX

    B

    IBM i

    C

    Linux

    D

    VIO Server


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    During a review of environmental requirements before ordering an IBM System z9 server and IBM System Storage DS8700, the customer states that the available power is 220 volts AC.  Which feature should be included with the DS8700 order()
    A

    Low Voltage

    B

    High Voltage

    C

    Remote System z Power Control

    D

    Battery Assembly


    正确答案: A
    解析: 暂无解析