photographs
floor plans
wired network layout
blueprints
第1题:
What is a site survey best practice for location-based services?()
第2题:
How should the transmit power on an access point and client each be set during a site survey?()
第3题:
You have a single Active Directory directory service domain with three sites named Site1,Site2,and Site3. There are site links between all three sites,and replication between sites occurs every 30 minutes. You need to ensure that all replication traffic is routed through Site2. What should you do?()
第4题:
Which three business requirements development activities are performed in the prepare phase before creating a technology strategy? ()
第5题:
Which is NOT part of a typical wireless site survey?()
第6题:
Which three items should the site survey documentation include?()
第7题:
Which of the following items would MOST likely be kept in a documentation file for each server?()
第8题:
Which IBM System Storage DS8000 copy function provides a three-site or three-copy solutionusing both synchronous and asynchronous replication?()
第9题:
not be put into operation too early
be pay adequate attention to
be used only when necessary
be coated with certain material
第10题:
Transmit only
Diversity
Receive only
Single isolated antenna
第11题:
Antivirus software version
Battery replacement date
Wire shelving diagram
IP address for network printer
Shutdown delay timing
第12题:
Add a new 802.11a WLAN
Increase the Layer 2 and Layer 3 security of the WLAN
Increase the throughput for the wireless clients
Add new services (such as voice) over the WLAN
第13题:
A blinking green led indicates which of the following conditions on a cisco 1030 remote edge ap?()
第14题:
Which two of these statements describe important aspects of performing a wireless site survey? (Choose two.) ()
第15题:
A blinking green power LED indicates which of the following conditions on a Cisco Series 1000 lightweight access point?()
第16题:
Which statement regarding the site-survey process is correct?()
第17题:
Which three of these items are IPv6 transition mechanisms? ()(Choose three.)
第18题:
When determining a customer’s security requirements using the security site survey from the steps for success methodology, which three of theses should be included in the customer’s security policy and procedures?()
第19题:
Which of the following is the FIRST course of action before implementing a change to a server?()
第20题:
nowhere (but should be discussed with the customer)
on the site survey map and within the site survey text
on the customers blueprints
in the Cisco WCS Planning Tool
第21题:
identifying and assessing customer business requirements
documenting and categorizing customer business requirements in terms of performance, availability, capacity and security
producing a documented technology strategy
creating a bill of materials
presenting documented business requirements to a customer and having the customer validate them
completing a site survey
第22题:
at 30mW
matched to the antenna gain
differing by at least 20 dBi
matched to each other
第23题:
An 802.11 g access point with a variety of antennas can be used in all standard site surveys.
Site surveys can be performed manually or through assisted site survey.
Channel power during testing starts at the default minimum and gradually increases to the maximum.
Overlapping access points can create performance problems.
Surveys should be done after hours in an office building or during reduced inventory levels in warehouses.
第24题:
Survey users to get their response to the potential server change.
The change should be approved by management.
Switch over to the alternate site so users are not affected.
Implement RAID so the server does not go offline.