单选题A Catalyst switch has just been installed and configured, and is not working as expected. You have decided to capture multiple show command outputs to study. Which one command could you use that includes the output of many other show commands, such as

题目
单选题
A Catalyst switch has just been installed and configured, and is not working as expected. You have decided to capture multiple show command outputs to study. Which one command could you use that includes the output of many other show commands, such as show version and show running-config?()
A

show configuration

B

show memory

C

show stacks

D

show tech-support


相似考题
参考答案和解析
正确答案: C
解析: 暂无解析
更多“A Catalyst switch has just been installed and configured, an”相关问题
  • 第1题:

    Which three of these pre-requisite for resetting a Catalyst Express 500 switch when Cisco Network Assistant is unavailable?()

    • A、At Least one enabled switch port that is unconnected to any device
    • B、A PC pre-configured with a specific IP Address and Mask
    • C、A PC or laptop with Windows 2000 or Windows XP installed and a web browser that has Java Script enabled
    • D、Physical Access to Switch
    • E、A Switch with no connected devices

    正确答案:A,C,D

  • 第2题:

    A cisco aironet 1020 controller-based access point has been connected to a catalyst 3550-24 pwr switch. however, when it is powered up, the access point fails. What has caused this problem?()

    • A、access point does not support 802.11h
    • B、incorrect switch power supply
    • C、switch port is not enabled
    • D、switch does not support 802.3af
    • E、access point has not been initialized with the primary controller

    正确答案:D

  • 第3题:

    The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch.What must be done to ensure that this new switch becomes the root bridge on the network?()

    • A、One router is running RIPv1.
    • B、RIP neighbor is 224.0.0.9.
    • C、The network contains a loop.
    • D、Network 10.10.1.0 is reachable.

    正确答案:A

  • 第4题:

    Switch SW1 has been configured with Private VLANs. With that type of PVLAN port should thedefault gateway be configured?()

    • A、Trunk
    • B、Isolated
    • C、Primary
    • D、Community
    • E、Promiscuous
    • F、None of the other alternatives apply

    正确答案:E

  • 第5题:

    A Cisco Aironet 1020 controller-based access point has been connected to a Catalyst 3550-24 PWRSwitch. However, when it is powered up, the access point fails. What has caused this problem?()

    • A、access point does not support 802.11h
    • B、incorrect switch power supply
    • C、switch port is not enabled
    • D、switch does not support 802.3af
    • E、access point has not been initialized with the primary controller

    正确答案:D

  • 第6题:

    A company has a small network,consisting of a single switch and a single router.The switch has been configured with two vlans,and route-on-a-stick is being configured on the router for inter-vlan routing.A trunk is configured to connect the switch to the router.What is the minimum number of router subinterfaces that are required for all the vlans to communicate?()

    • A、one
    • B、three
    • C、two
    • D、zero

    正确答案:C

  • 第7题:

    WebSphere Commerce has been successfully installed and tested.  WebSphere Commerce Analyzer has been installed and the extraction programs have run with no errors but there is no data in any reports when viewed from the WebSphere Commerce Accelerator.  What could be the cause of this problem?()

    • A、The WebSphere Commerce application server was not started
    • B、The web server was not started
    • C、SSL has not been configured on the web server
    • D、The appropriate listeners were not enabled in Configuration Manager
    • E、The database server was not started

    正确答案:D

  • 第8题:

    单选题
    A cisco aironet 1020 controller-based access point has been connected to a catalyst 3550-24 pwr switch. however, when it is powered up, the access point fails. What has caused this problem?()
    A

    access point does not support 802.11h

    B

    incorrect switch power supply

    C

    switch port is not enabled

    D

    switch does not support 802.3af

    E

    access point has not been initialized with the primary controller


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    A just announced two-port Ethernet card has been installed on a system and it is not recognized. On the HMC the slot shows empty. The device driver has been installed and cfgmgr runs normally. What is the most appropriate action to solve this problem?()
    A

    Update the HMC software

    B

    Update the system firmware

    C

    Re-install the device driver

    D

    Flash update the two-port card


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    Switch SW1 has been configured with Private VLANs. With that type of PVLAN port should thedefault gateway be configured?()
    A

    Trunk

    B

    Isolated

    C

    Primary

    D

    Community

    E

    Promiscuous

    F

    None of the other alternatives apply


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    You have just created a new VLAN on your network for inter-VLAN routing.  What is one step that you should include in your VLAN-based implementation and verification plan?()
    A

    Verify that different native VLANs exist between two switches for security purposes.

    B

    Verify that the switch is configured to allow for trunking on the switch ports.

    C

    Verify that each switch port has the proper IP address space assigned to it for the new VLAN. 

    D

    Verify that the VLAN virtual interface has been correctly created and enabled.


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    A Catalyst switch has just been installed and configured, and is not working as expected. You have decided to capture multiple show command outputs to study. Which one command could you use that includes the output of many other show commands, such as show version and show running-config?()
    A

    show configuration

    B

    show memory

    C

    show stacks

    D

    show tech-support


    正确答案: D
    解析: 暂无解析

  • 第13题:

    A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down.  What might explain what happened? ()

    • A、The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.
    • B、The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.
    • C、The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.
    • D、The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.

    正确答案:B

  • 第14题:

    An administrator is configuring a Catalyst switch with VLAN information that must be automatically distributed to other Catalyst switches in the network. What conditions must be met in order for the VLANs configured on this switch to be automatically configured on the other switches?()

    • A、The switch that will share its VLAN configuration must be in VTP server mode.
    • B、The switches must be in the same VTP domain.
    • C、The switch that will share the VLAN information must be configured as the root bridge.
    • D、The switches must be connected over VLAN trunks.
    • E、The switches must be configured to use the same STP version.
    • F、The switches must have VTP pruning activated.

    正确答案:A,B,D

  • 第15题:

    The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch. What must be done to ensure that this new switch becomes the root bridge on the network?()

    • A、Lower the bridge priority number.
    • B、Change the MAC address of the switch.
    • C、Increase the VTP revision number for the domain.
    • D、Lower the root path cost on the switch ports.
    • E、Assign the switch an IP address with the lowest value.

    正确答案:A

  • 第16题:

    A Cisco Aironet 1020 controller-based access point has been connected to a Catalyst 3550-24PWR Switch. However, when it is powered up, the access point fails. What has caused this problem?()

    • A、access point does not support 802.11h
    • B、incorrect switch power supply
    • C、switch port is not enabled
    • D、switch does not support 802.3af
    • E、access point has not been initialized with the primary controller

    正确答案:D

  • 第17题:

    A new switch is installed in the Testking network. This switch is to be configured sothat VLAN information will be automatically distributed to all the other Cisco Catalyst switches in the network. Which of the conditions below have to be met in order for this to occur?()

    • A、The switch that will share the VLAN information must be in the VTP Server mode.
    • B、The switches must be in the same VTP domain.
    • C、The switch that will share the VLAN information must be configured as the root bridge.
    • D、The switches must be configured to use the same VTP version.
    • E、The switches must be configured to use the same STP version.
    • F、The switches must be configured to use the same type of ID tagging.
    • G、The switches must be connected over VLAN trunks.

    正确答案:A,B,F

  • 第18题:

    A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()

    • A、Ensure Director Agent is installed on the new servers.
    • B、Ensure a DHCP Sever is installed and configured in the environment.
    • C、Ensure Server Plus Pack option has been installed and configured.
    • D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.
    • E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.

    正确答案:B,E

  • 第19题:

    单选题
    Switch R1 has been configured with Private VLANs.  With that type of PVLAN port should the default gateway be configured?()
    A

     Trunk

    B

     Isolated

    C

     Primary

    D

     Community

    E

     Promiscuous

    F

     None of the other alternatives apply


    正确答案: E
    解析: 暂无解析

  • 第20题:

    单选题
    A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down.  What might explain what happened? ()
    A

    The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.

    B

    The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.

    C

    The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.

    D

    The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch. What must be done to ensure that this new switch becomes the root bridge on the network?()
    A

     Lower the bridge priority number.

    B

     Change the MAC address of the switch.

    C

     Increase the VTP revision number for the domain.

    D

     Lower the root path cost on the switch ports.

    E

     Assign the switch an IP address with the lowest value.


    正确答案: E
    解析: 暂无解析

  • 第22题:

    单选题
    A lightweight access point has been connected to a Catalyst 3550 24-PWR switch, and on power-up the access point fails. What is the problem with the switch?()
    A

    The power supply has inadequate wattage.

    B

    Power is incorrectly configured on the port.

    C

    It does not support 802.3af Poe.

    D

    Power is not enabled on the port.


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    A Cisco Aironet 1020 controller-based access point has been connected to a Catalyst 3550-24PWR Switch. However, when it is powered up, the access point fails. What has caused this problem?()
    A

    access point does not support 802.11h

    B

    incorrect switch power supply

    C

    switch port is not enabled

    D

    switch does not support 802.3af

    E

    access point has not been initialized with the primary controller


    正确答案: C
    解析: 暂无解析

  • 第24题:

    多选题
    Which three of these pre-requisite for resetting a Catalyst Express 500 switch when Cisco Network Assistant is unavailable?()
    A

    At Least one enabled switch port that is unconnected to any device

    B

    A PC pre-configured with a specific IP Address and Mask

    C

    A PC or laptop with Windows 2000 or Windows XP installed and a web browser that has Java Script enabled

    D

    Physical Access to Switch

    E

    A Switch with no connected devices


    正确答案: A,C
    解析: 暂无解析