Schedule and perform an incremental backup as soon as possible.
Inspect backup report logs.
Schedule and perform a full backup as soon as possible.
Inspect alert notification settings.
第1题:
You are the network administrator for All servers run Windows Server 2003. You are creating a backup schedule for the main file server. You need to create a schedule so that backup jobs are completed in the shortest amount of time possible. What should you do?()
第2题:
A system administrator performs a full backup every Saturday evening and incremental backups the rest of the week. The system failed on Thursday and needs to be restored. Which backup tapes will be required to restore the system to its most recent recoverable state?()
第3题:
Due to operational commitments, a system has a very short backup window during the week, but is not used from Saturday morning through Sunday at Midnight. Which of the following minimizes backup and recovery time, while providing complete data restore coverage ()
第4题:
You work as a database administrator for Certkiller .com. Your database is in NOARCHIVELOG mode and you want to perform a backup. Which type of backup would be appropriate in this case? ()
第5题:
You are the network administrator for All network servers run Windows Server 2003. You perform a full backup of the network every Monday. You perform incremental backups every Tuesday, Wednesday, Thursday, and Friday. Backups are always performed at 1:00 A.M. On Wednesday at noon, one server experiences hard disk failure. You need to restore all data on this server. What should you do?()
第6题:
You are a database administrator for your company. Each night, you perform full backups of your SQL Server 2005 computer. During business hours, you perform hourly transaction log backups. You rebuild database indexes each night. You need to modify your backup strategy. You must ensure that the database recovers to a new server as quickly as possible. What should you do?()
第7题:
Take an image backup nightly while the server is online.
Take an incremental backup while the server is offline.
Take a monthly snapshot backup while the server is online.
Take a differential backup while the server is online.
第8题:
Turn off all electrical power
Remove all backup media
Implement fire suppression
Evacuate all personnel
第9题:
A full database backup should be performed once daily. During business hour, a transaction log backup should be performed every two hours.
A full database backup should be performed once daily
A full database backup should be performed once daily. During business hours, a differential backup should be performed every two hours
Perform a full database backup should be performed once every week. A differential backup should be performed once daily. During business hours a transaction log backup should be performed every two hours.
第10题:
System image
Incremental backup
System state restore
Differential backup
第11题:
Schedule a normal backup every Sunday. Schedule incremental backups every Monday through Saturday.
Schedule a normal backup every Sunday. Schedule differential backups every Monday through Saturday.
Schedule a copy backup every day.
Schedule a normal backup every day.
第12题:
Schedule the full backups to run after the nightly index is rebuilt.
Schedule the full backup to run before the nightly index is rebuilt. Schedule a differential backup to run after the nightly index is rebuilt.
Schedule an additional transaction log backup to run after the nightly index is rebuilt.
Schedule a marker to be added to the transaction log before the nightly index is rebuilt.
第13题:
Lightening causes a power surge and leads to a fire in the datacenter. Following emergency procedures, which of the following is the FIRST thing the server administrator should do?()
第14题:
A system administrator needs to upgrade the Oracle database from Version 7 to Version 8. Which of the following scheduling concerns should be considered?()
第15题:
An administrator performs a full backup every Saturday evening and daily incremental backups the rest of the week. The system failed on Thursday and must be restored. Which backup tapes will be required to restore the system to its most recent recoverable state()
第16题:
You are the administrator of the TestKing company network. The network consists of a single Active Directory domain named The network includes 20 member servers running Windows Server 2003 and 4 domain controllers running Windows Server 2003. All client computers run Windows XP Professional. A member server named TestKingSrvA functions as a file server. TestKingSrvA has a locally attached tape device. You need to create a backup schedule for TestKingSrvA. All data on TestKingSrvA must be backed up once a week. Every day, you need to back up only the data that was changed after the last backup. You need to minimize the amount of data that must be backed up every day. What should you do? ()(Choose two)
第17题:
You work in a company which is named Wiikigo Corp. The company uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. There is a database named DB1 in the instance. At present about 90 GB of data is stored in DB1. You made some rough calculations that every day about 1 GB of data is modified or inserted. You set the recovery model of DB1 to Simple. According to the company requirements, during business hours, data loss of more than 120 minutes worth of transactions is unacceptable. You have to choose a backup strategy which must comply with the following two requirements: Using as little disk space as possible Complying with the company requirements. So what action should you perform to achieve this goal?()
第18题:
Schedule and perform an incremental backup as soon as possible.
Inspect backup report logs.
Schedule and perform a full backup as soon as possible.
Inspect alert notification settings.
第19题:
Restore the Wednesday backup, then restore the Tuesday backup, and then restore the Monday backup.
Restore the Wednesday backup, and then restore the Monday backup.
Restore the Monday backup, then restore the Tuesday backup, and then restore the Wednesday backup.
Restore the Monday backups, and then restore the Wednesday backup.
第20题:
Take an image backup nightly while the server is online.
Take an incremental backup while the server is offline.
Take a monthly snapshot backup while the server is online.
Take a differential backup while the server is online.
第21题:
Saturday’s full backup tape
Wednesday’s backup tape
Saturday’s full backup and Wednesday’s incremental backup tapes
Saturday’s full backup and Sunday’s through Wednesday’s incremental backup tapes
第22题:
Open each backup log, beginning with Monday and moving forward through the week. In each log, search for a backup of the file. Restore the first backup that you find.
Open each backup log, beginning with Friday and moving backward through the week. In each log, search for a backup of the file. Restore the first backup that you find.
Open each backup log, beginning with Tuesday and moving forward through the week. In each log, search for a backup of the file. Restore the first backup that you find.
Open the backup log for Monday. Search for a backup of the file. If you find a backup, restore the file. If you do not find a backup, open the backup log for Friday and search there. If you find a backup, restore the file. If you do not find a backup, continue opening backup logs, moving backward through the week from Friday Restore the first backup that you find.
第23题:
Evacuate all personnel.
Notify staff of the potential service outage.
Use fire suppression techniques until the fire department arrives.
Grab the backup tapes and exit the server room.
第24题:
Saturday’s full backup tape only
Wednesday’s incremental backup tape only
Saturday’s full backup and Wednesday’s incremental backup tapes
Saturday’s full backup and Sunday’s through Wednesday’s incremental backup tapes