Hotsite
Coldsite
Warmsite
Failoversite
第1题:
Which of the following is the MOST important step in any disaster recovery plan?()
第2题:
Which of the following replication methods provides a disaster recovery system with minimal downtime to normal operations?()
第3题:
Which of the following is the MOST important step in preparing for disaster recovery?()
第4题:
A company has just implemented a disaster recovery plan in which critical business must be restored in a four hour window. Which of the following methods should be used to backup theservers?()
第5题:
Which of the following can be used to re-deploy a system configuration in a disaster recovery scenario?()
第6题:
A customer has a large amount of data stored on three database servers and is concerned that at present there is no disaster recovery plan in place. They have an existing tape backup solution that meets their backup window. In order to analyze potential disaster recovery plans, which of the following questions is the most important?()
第7题:
A customer plans to deploy a disaster recovery site and requires a complete mirror of their production and test environments. They have an excellent relationship with the business partner who helped them with their initial deployment. Which of the following will help with a successful implementation?()
第8题:
A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products best accomplishes this task?()
第9题:
Hot site
Cold site
Warm site
Failover site
第10题:
On/Off CoD
Reserve CoD
Permanent CUoD
Capacity Backup
第11题:
What is the minimum critical backup window?
Which server is handling the most critical data?
How much data is stored on each server?
What is the throughput of the hard drives?
第12题:
RID master
Schema master
PDC emulator master
Domain naming master
第13题:
Which of the following is a distinguishing factor between data archiving and data backups?()
第14题:
Which of the following is MOST important to include on the disaster recovery documentation?()
第15题:
Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()
第16题:
A customer has two sites located 500 kilometers apart. The customer has both a high-speedInternet link and dark fiber between the sites. The customer wants to utilize storage resources ateither site leveraging replication for disaster recovery implementations. The customer wants to linkthese two sites together. Which option provides the highest performance and is most reliable?()
第17题:
Which of the following IBM solutions protect system operations from a hardware failure by automatically moving services from a failing system to another system?()
第18题:
A customer wants to deploy a centralized storage system to support a new database. Which of the following factors should the storage specialist consider first?()
第19题:
A customer is considering a second p690 at a second site for Disaster Recovery purposes. Which of the following On Demand offerings is most applicable in this environment?()
第20题:
Appropriate use of backup media and offsite storage
The disaster recovery testing process过程
Classifying systems according to operational impact
Use appropriate fire suppressant systems
第21题:
RID master
Schema master
PDC emulator master
Domain naming master
第22题:
Test the disaster recovery plan process
Identify key disaster recovery personnel
Ensure that all backup data is kept off-site
Assist management with IT backup policy decisions
第23题:
Cold site
Warm site
GFS
Hot site
第24题:
Emergency exits
The test plan
Payroll
All IT contact numbers