当前分类: IBM(000-062)
问题:单选题Company.com has recently added a partition to an existing p5-550 4-way with 8GB RAM. When the newly-created third partition is started, it fails to initialize. The configuration of the partitions is as follows: LPAR Min CPU Des CPU Max CPU P1 0.8 1.4...
查看答案
问题:单选题A technical specialist has a requirement to implement a 4-way POWER5 server with a small Web server partition and a high performance database server partition. The Web server provides a client front-end to the database server. The most important concer...
问题:单选题Company.com would like to have the processor resources on their system efficiently shared between logical partitions, but does not require management of memory or I/O resources. Which of the following would accomplish this requirement?()A HMC command l...
问题:单选题Company.com has an EMC disk array and would like to connect it to a Virtual I/O Server on a pSeries p5-520. How can the EMC device drivers be installed?()A Use smitty install on the client partitions.B Use padmin command in the VIO Server.C Use the oe...
问题:单选题ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical...
问题:单选题The Information Technology (IT) department wants to consolidate two 4-way p5-550 servers onto an 8-way p5-570. However, the departments using the p5-550 servers are concerned about quality of service after consolidation. Which per-partition processor a...
问题:单选题ompany.com has a Micro-Partitioned p5-570 4-way with six application partitions and two VIO servers. Each VIO server has been allocated 0.5 CPU and the application servers have been allocated 0.4 CPUs. The marketing department wants to deploy a new Web...
问题:单选题Company.com wants to build two Dynamic Logical Partitions (DLPAR) on a p5-520. They have a requirement for communication between the two DLPARs. Which feature of virtualization will satisfy this requirement?()A VLANB Virtual EthernetC Virtual I/O Serve...
问题:单选题A hosting company recently purchased an IBM p5-570 to use in their data center. The company intends to use the server to run several different client workloads. Which of the following features of the IBM p5 servers addresses the need for the isolation ...
问题:单选题Company.com would like to share CPU resources between AIX V5.3 and Linux partitions. Which solution would best satisfy this customer requirement?()A Micro-PartitioningB Partition Load ManagerC eWLMD Grid Toolbox...
问题:单选题Company.com wants to put two Micro-Partitions on a p5-570 and attach to a SAN. What is the best LPAR configuration to maximize SAN availability using four Host Bus Adapters (HBAs)?()A Two HBAs assigned to each redundant VIOS which provides VSCSI access...
问题:单选题Which of the following allows the user to have two separate Ethernet networks share the same network adapter?()A VLAN tagsB EtherChannelC Virtual EthernetD Shared Ethernet Adapter...
问题:单选题When doing capacity planning for the Virtual I/O Server,what is the most important consideration?()A The I/O workload needs of the client LPARsB The processing requirements of the client LPARsC The memory requirements of the client LPARsD The virtual ...
问题:单选题Which of the following should be done FIRST when setting up a new p5-520 to be managed by a new HMC via a private network?()A Change passwords in ASMIB Add the managed system to the HMCC Connect the p5-520 to a power sourceD Connect the HMC and the p5-...
问题:单选题A technical specialist defined a virtual Ethernet ent2 on the VIO server that has a physical adapter, ent0. Which of the following commands should be used to configure the Shared Ethernet Adapter?()A mkvdev -sea ent2 -vadapter ent0 -default ent0 -def...
问题:单选题Which commands can the technical specialist use in AIX 5.3 to display the Hypervisor and virtual processor affinity statistics?()A lpstat and mpstatB lparstat and mpstatC lpstat and vmstatD vmstat and sar...
问题:单选题Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool....
问题:单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()A Order a POW...