Identify the activities involved in installing and configuring equipment at a customer’s site or sites
Describe the day-to-day activities required to support, manage, and monitor a newly implemented system
Access current network readiness, site readiness, and operational readiness in preparation for designing a solution proposal
Gain an understanding of high-level business and technical requirements
第1题:
What will be the phase angle relationship of a six-pole, three-phase, rotating field generator?
A.60
B.120
C.180
D.360
第2题:
Which implement phase service component consists of preparing for migration,excuting a network migration plan,and completing migration test cases?()
第3题:
Which two service components are in the plan phase?()
第4题:
Which three of these service components are in the design phase?()
第5题:
Which service component in the design phase describes developing a detailed, site-specific plan for implementing the new technology system or solution()
第6题:
Which of following best describes customer benefits in delivering network readiness assessment services in plan phase?()
第7题:
Your network consists of 1,000 client computers that run Windows XP. The computers do not have access to the Internet. You plan to migrate 200 of the computers immediately to Windows 7. The remainder will be migrated over the next several months. You need to plan the most efficient method for activating all of the computers. What should you do?()
第8题:
Use the Key Management Service (KMS) for all the computers.
Use Multiple Activation Key (MAK) Independent for all the computers.
Use Multiple Activation Key (MAK) Proxy for the first 200 computers, and then use the Key Management Service(KMS) for the remaining computers.
Use Multiple Activation Key (MAK) Independent for the first 200 computers, and then use Multiple Activation Key(MAK) Proxy for the remaining computers.
第9题:
used to verify the identity of the peer
used between the initiator and the responder to establish a basic security policy
used to establish a symmetric shared key via a public key exchange process
used for asymmetric public key encryption
第10题:
Identify the activities involved in installing and configuring equipment at a customer’s site or sites
Describe the day-to-day activities required to support, manage, and monitor a newly implemented system
Access current network readiness, site readiness, and operational readiness in preparation for designing a solution proposal
Gain an understanding of high-level business and technical requirements
第11题:
Proof of Concept
Site Readiness Assessment
Proposal Development
Operations Readiness Assessment
Account planning
第12题:
align business requirements with technical requirements
create a plan to recycle used equipment
evaluate the readiness of a customers current operations and network management infrastructure to support a new technology
install and test system components in a non-production environment
第13题:
第14题:
Which of the following statements that describe Diffie Hellman Key exchange are correct? ()
第15题:
Which design phase service component consists of developing a detailed, site-specific plan for implementing a new technology system or solution? Select exactly 1 answer(s) from the following:()。
第16题:
What is the key objective of the plan phase? Select exactly 1 answer(s) from the following:()。
第17题:
Which service component in the wireless operate phase helps isolate and resolve an incident?()
第18题:
A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()
第19题:
A desk, as it not rack mountable
Ethernet connections to the POWER5 systems
Serial connections to the POWER5 systems
USB connections for the keyboard and mouse
第20题:
A DH key exchange is an algorithm that utilizes asymmetric cryptographic keys.
The DH key exchange is used to establish a shared secret over an insecure medium during an IPSec phase 1 exchange.
The DH exchange is susceptible to man-in-the-middle attacks.
The DH exchange is used to authenticate the peer device duringan IPSec phase 1 exchange.
A DH exchange provides Perfect Forward Secrecy (PFS).
第21题:
Implement
Design
Prepare
Operate
第22题:
Assess the existing environments to determine if it can support the proposed system.
Identify the activities for installing and configuring the equipment at the customer sites.
Gather high-level solution requirements, and understand the customer business needs an the opportunity.
Prepare the activities for day-to-day support, management, and monitoring of the newly implemented system.
第23题:
Account Qualification and Planning
Detailed Design Development
Staff Training
Systems Acceptance Test Plan Development
Staging Plan Development
Site Readiness Assessment
第24题:
staging and system migration
post implementation support handoff meeting
detailed design development
staff training
migration plan development