单选题How should a router that is being used in a Frame Relay network be configured to avoid split horizon issues from preventing routing updates?()A Configure a separate sub-interface for each PVC with a unique DLCI and subnet assigned to the subinterface B

题目
单选题
How should a router that is being used in a Frame Relay network be configured to avoid split horizon issues from preventing routing updates?()
A

Configure a separate sub-interface for each PVC with a unique DLCI and subnet assigned to the subinterface B

B

Configure each Frame Relay circuit as a point-to-point line to support multicast and broadcast traffic

C

Configure many sub-interfaces on the same subnet

D

Configure a single sub-interface to establish multiple PVC connections to multiple remote router interfaces


相似考题
参考答案和解析
正确答案: D
解析: 暂无解析
更多“单选题How should a router that is being used in a Frame Relay network be configured to avoid split horizon issues from preventing routing updates?()A Configure a separate sub-interface for each PVC with a unique DLCI and subnet assigned to the subinterface B”相关问题
  • 第1题:

    How should arouter that is being used in a Frame Relay network be configured to avoid split horizon issues from preventing routing updates?()

    A.Configure a separate sub-interface for each PVC with a unique DLCI and subnet assigned to the sub-interface

    B.Configure each Frame Relay circuit as apoint-to-point line to support multicast and broadcast traffic

    C.Configure many sub-interfaces on the same subnet

    D.Configure a single sub-interface to establish multiple PVC connections to multiple remote router interfaces


    参考答案:A

  • 第2题:

    How should a router that is being used in a Frame Relay network be configured to avoid split horizon issues from preventing routing updates?()

    A.Configure a separate sub-interface for each PVC with a unique DLCI and subnet assigned to the sub-interface

    B.Configure each Frame Relay circuit as a point-to-point line to support multicast and broadcast traffic

    C.Configure many sub-interfaces on the same subnet

    D.Configure a single sub-interface to establish multiple PVC connections to multiple remote router interfaces


    参考答案:A

  • 第3题:

    Which two statements are correct about configuring AutoQoS on a Cisco router? ()

    • A、 AutoOoS can be implemented on only one side of a link.
    • B、The interface does not have to have an IP address associated with it.
    • C、The AutoOoS feature cannot be configured on a Frame Relay DLCI if a map class is attached to the DLCI.
    • D、In a Frame Relay network, AutoOoS cannot be configured if a DLCI is already assigned to the Frame Relay subinterface

    正确答案:C,D

  • 第4题:

    Which statement is true about the configuration of AutoQoS on a Frame Relay interface?()

    • A、AutoQoS can be configured from a different subinterface if the DLCI is already assigned to one subinterface 
    • B、Multilink PPP (MLP) over Frame Relay must be manually configured on low speed DLCIs 
    • C、for low-speed Frame Relay DLCIs with Frame Relay-to ATM interworking, the AutoQoS cannot be configured if a virtual template is already configured for the DLCI 
    • D、AutoQoS can be configured on a Frame Relay DLCI only if a map class is attached to the DLCI 

    正确答案:C

  • 第5题:

    It has become necessary to configure an existing serial interface to accept a second Frame Relay virtualcircuit.Which of the following processes are required to accomplish this task?()

    • A、configure static frame relay map entries for each subinterface network.
    • B、remove the ip address from the physical interface
    • C、create the virtual interfaces with the interface command
    • D、configure each subinterface with its own IP address
    • E、disable split horizon to prevent routing loops between the subinterface networks
    • F、encapsulate the physical interface with multipoint PPP

    正确答案:B,C,D

  • 第6题:

    It has become necessary to configure an existing serial interface to accept a second Frame Relay virtual circuit.Which of the following processes are required to accomplish this task?()

    • A、configure static frame relay map entries for each subinterface network.
    • B、remove the ip address from the physical interface
    • C、create the virtual interfaces with the interface command
    • D、configure each subinterface with its own IP address
    • E、disable splithorizon to prevent routing loops between the subinterface networks
    • F、encapsulate the physical interface with multipoint PPP

    正确答案:B,C,D

  • 第7题:

    单选题
    You are implementing a new frame relay network to provide connectivity between you offices. To do this, you set up the frame relay network using point-to-point subinterfaces.Which of the following does NOT need to be configured?()
    A

    The Frame Relay encapsulation on the physical interface.

    B

    The local DLCI on each subinterface.

    C

    An IP address on the physical interface.

    D

    The subinterface type as point-to-point.


    正确答案: B
    解析: 暂无解析

  • 第8题:

    多选题
    It has become necessary to configure an existing serial interface to accept a second Frame Relay virtual circuit.Which of the following processes are required to accomplish this task?()
    A

    configure static frame relay map entries for each subinterface network.

    B

    remove the ip address from the physical interface

    C

    create the virtual interfaces with the interface command

    D

    configure each subinterface with its own IP address

    E

    disable split horizon to prevent routing loops between the subinterface networks

    F

    encapsulate the physical interface with multipoint PPP


    正确答案: F,A
    解析: 暂无解析

  • 第9题:

    多选题
    It has become necessary to configure an existing serial interface to accept a second Frame Relay virtual circuit.Which of the following processes are required to accomplish this task?()
    A

    configure static frame relay map entries for each subinterface network.

    B

    remove the ip address from the physical interface

    C

    create the virtual interfaces with the interface command

    D

    configure each subinterface with its own IP address

    E

    disable splithorizon to prevent routing loops between the subinterface networks

    F

    encapsulate the physical interface with multipoint PPP


    正确答案: A,F
    解析: 暂无解析

  • 第10题:

    单选题
    How should a router that is being used in a Frame Relay network be configured to avoid split horizon issues from preventing routing updates?()
    A

    Configure a separate sub-interface for each PVC with a unique DLCI and subnet assigned to the sub-interface.

    B

    Configure each Frame Relay circuit as a point-to-point line to support multicast and broadcast traffic.

    C

    Configure many sub-interfaces on the same subnet.

    D

    Configure a single sub-interface to establish multiple PVC connections to multiple remote router interfaces.


    正确答案: A
    解析: 暂无解析

  • 第11题:

    多选题
    Which two statements are correct about configuring AutoQoS on a Cisco router? ()
    A

    AutoOoS can be implemented on only one side of a link.

    B

    The interface does not have to have an IP address associated with it.

    C

    The AutoOoS feature cannot be configured on a Frame Relay DLCI if a map class is attached to the DLCI.

    D

    In a Frame Relay network, AutoOoS cannot be configured if a DLCI is already assigned to the Frame Relay subinterface


    正确答案: D,A
    解析: 暂无解析

  • 第12题:

    单选题
    Which statement is true about the configuration of AutoQoS on a Frame Relay interface?()
    A

    AutoQoS can be configured from a different subinterface if the DLCI is already assigned to one subinterface 

    B

    Multilink PPP (MLP) over Frame Relay must be manually configured on low speed DLCIs 

    C

    for low-speed Frame Relay DLCIs with Frame Relay-to ATM interworking, the AutoQoS cannot be configured if a virtual template is already configured for the DLCI 

    D

    AutoQoS can be configured on a Frame Relay DLCI only if a map class is attached to the DLCI 


    正确答案: C
    解析: 暂无解析

  • 第13题:

    It has become necessary to configure an existing serial interface to accept a second Frame Relay virtual circuit.Which of the following processes are required to accomplish this task?()

    A. configure static frame relay map entries for each subinterface network.

    B. remove the ip address from the physical interface

    C. create the virtual interfaces with the interface command

    D. configure each subinterface with its own IP address

    E. disable split horizon to prevent routing loops between the subinterface networks

    F. encapsulate the physical interface with multipoint PPP


    参考答案:B, C, D

  • 第14题:

    The command frame-relay map ip 10.121.16.8 102 broadcast was entered on the router. Which of the following statements is true concerning this command()。

    A.This command should be executed from the global configuration mode

    B.The IP address 10.121.16.8 is the local router port used to forward data

    C.102 is the remote DLCI that will receive the information

    D.This command is required for all Frame Relay configurations

    E.The broadcast option allows packets, such as RIP updates, to be forwarded across the PVC


    参考答案:E

  • 第15题:

    How should a router that is being used in a Frame Relay network be configured to avoid split horizon issues from preventing routing updates?()

    • A、Configure a separate sub-interface for each PVC with a unique DLCI and subnet assigned to the subinterface B
    • B、Configure each Frame Relay circuit as a point-to-point line to support multicast and broadcast traffic
    • C、Configure many sub-interfaces on the same subnet
    • D、Configure a single sub-interface to establish multiple PVC connections to multiple remote router interfaces

    正确答案:A

  • 第16题:

    The command frame-relay map ip 10.121.16.8 102 broadcast was entered on the router. Which of the following statements is true concerning this command?()

    • A、This command should be executed from the global configuration mode.
    • B、The IP address 10.121.16.8 is the local router port used to forward data.
    • C、102 is the remote DLCI that will receive the information.
    • D、This command is required for all Frame Relay configurations.
    • E、The broadcast option allows packets, such as RIP updates, to be forwarded across the PVC

    正确答案:E

  • 第17题:

    How should a router that is being used in a Frame Relay network be configured to avoid split horizon issues from preventing routing updates?()

    • A、Configure a separate sub-interface for each PVC with a unique DLCI and subnet assigned to the sub-interface.
    • B、Configure each Frame Relay circuit as a point-to-point line to support multicast and broadcast traffic.
    • C、Configure many sub-interfaces on the same subnet.
    • D、Configure a single sub-interface to establish multiple PVC connections to multiple remote router interfaces.

    正确答案:A

  • 第18题:

    The command frame-relay map ip 10.121.16.8 102 broadcast was entered on the router. Which of the following statements is true concerning this command()。

    • A、This command should be executed from the global configuration mode
    • B、The IP address 10.121.16.8 is the local router port used to forward data
    • C、102 is the remote DLCI that will receive the information
    • D、This command is required for all Frame Relay configurations
    • E、The broadcast option allows packets, such as RIP updates, to be forwarded across the PVC

    正确答案:E

  • 第19题:

    多选题
    Which of the following statements correctly describes the characteristics of a Frame Relay point-to-point subinterface?()
    A

    Needs to use Inverse ARP.

    B

    Maps a single IP subnet per DLCI.

    C

    Maps a single IP subnet across multiple DLCIs.

    D

    Resolves NBMA (non broadcast multi access) split horizon issues.

    E

    Requires use of the frame-relay map command.

    F

    None of the above


    正确答案: B,F
    解析: 暂无解析

  • 第20题:

    单选题
    The command frame-relay map ip 10.121.16.8 102 broadcast was entered on the router. Which of the following statements is true concerning this command()。
    A

    This command should be executed from the global configuration mode

    B

    The IP address 10.121.16.8 is the local router port used to forward data

    C

    102 is the remote DLCI that will receive the information

    D

    This command is required for all Frame Relay configurations

    E

    The broadcast option allows packets, such as RIP updates, to be forwarded across the PVC


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    How should a router that is being used in a Frame Relay network be configured to avoid split horizon issues from preventing routing updates()。
    A

    Configure a separate sub-interface for each PVC with a unique DLCI and subnet assigned to the sub-interface

    B

    Configure each Frame Relay circuit as a point-to-point line to support multicast and broadcast traffic

    C

    Configure many sub-interfaces on the same subnet

    D

    Configure a single sub-interface to establish multiple PVC connections to multiple remote router interfaces


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    How should a router that is being used in a Frame Relay network be configured to avoid split horizon issues from preventing routing updates?()
    A

    Configure a separate sub-interface for each PVC with a unique DLCI and subnet assigned to the subinterface B

    B

    Configure each Frame Relay circuit as a point-to-point line to support multicast and broadcast traffic

    C

    Configure many sub-interfaces on the same subnet

    D

    Configure a single sub-interface to establish multiple PVC connections to multiple remote router interfaces


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    How should arouter that is being used in a Frame Relay network be configured to avoid split horizon issues from preventing routing updates?()
    A

    Configure a separate sub-interface for each PVC with a unique DLCI and subnet assigned to the sub-interface

    B

    Configure each Frame Relay circuit as apoint-to-point line to support multicast and broadcast traffic

    C

    Configure many sub-interfaces on the same subnet

    D

    Configure a single sub-interface to establish multiple PVC connections to multiple remote router interfaces


    正确答案: A
    解析: 暂无解析

  • 第24题:

    单选题
    The command frame-relay map ip 10.121.16.8 102 broadcast was entered on the router. Which of the following statements is true concerning this command?()
    A

    This command should be executed from the global configuration mode.

    B

    The IP address 10.121.16.8 is the local router port used to forward data.

    C

    102 is the remote DLCI that will receive the information.

    D

    This command is required for all Frame Relay configurations.

    E

    The broadcast option allows packets, such as RIP updates, to be forwarded across the PVC


    正确答案: E
    解析: 暂无解析