单选题New switches have been purchased for a network upgrade. The objective for the network design emphasizes efficient, error-free transport instead of fast transport.Which switching mode should be configured on the new switches to provide error-free transp

题目
单选题
New switches have been purchased for a network upgrade. The objective for the network design emphasizes efficient, error-free transport instead of fast transport.Which switching mode should be configured on the new switches to provide error-free transport to the network? ()
A

cut-through

B

fragment-free

C

frame-filtering

D

store-and-forward

E

802.1q forwarding

F

VTP transparent mode


相似考题
更多“New switches have been purchased for a network upgrade. The”相关问题
  • 第1题:

    When ordering switches for a new building, which of the following is the BEST way for the technician to determine the number of switches to put in each network closet?()

    A. Review the architectural plans to see how many drops go to each closet.

    B. Count the number of rooms near each closet and standardize eight drops per room.

    C. Wireless is the new standard and no network switches will be needed in the building,

    D. Count the number of phone ports and configure two network ports for each phone port.


    参考答案:A

  • 第2题:

    You have an Ethernet network. Which of the conditions below can lead to increased congestion on your network?()

    A. The use of Full-Duplex Mode.

    B. The Creation on New Collision Domains.

    C. The Creation on New Broadcast Domains.

    D. The Addition of Hubs to the Network.

    E. The use of switches in the Network.

    F. The Amount of ARP or IPX SAP Traffic.


    参考答案:D, F

  • 第3题:

    A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down.  What might explain what happened? ()

    • A、The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.
    • B、The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.
    • C、The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.
    • D、The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.

    正确答案:B

  • 第4题:

    You have an Ethernet network. Which of the conditions below can lead to increased congestion on your network?()

    • A、The use of Full-Duplex Mode.
    • B、The Creation on New Collision Domains.
    • C、The Creation on New Broadcast Domains.
    • D、The Addition of Hubs to the Network.
    • E、The use of switches in the Network.
    • F、The Amount of ARP or IPX SAP Traffic.

    正确答案:D,F

  • 第5题:

    We confirm ____ purchased 2,000 MP3 Players ____ you.

    • A、have, to    
    • B、having, from    
    • C、to have, from    
    • D、have been to

    正确答案:B

  • 第6题:

    A new switch is installed in the Testking network. This switch is to be configured sothat VLAN information will be automatically distributed to all the other Cisco Catalyst switches in the network. Which of the conditions below have to be met in order for this to occur?()

    • A、The switch that will share the VLAN information must be in the VTP Server mode.
    • B、The switches must be in the same VTP domain.
    • C、The switch that will share the VLAN information must be configured as the root bridge.
    • D、The switches must be configured to use the same VTP version.
    • E、The switches must be configured to use the same STP version.
    • F、The switches must be configured to use the same type of ID tagging.
    • G、The switches must be connected over VLAN trunks.

    正确答案:A,B,F

  • 第7题:

    An administrator is planning an upgrade of a major software package on an application server.The software has been identified, the project approved and the upgrade purchased. Which of the following steps should the administrator take NEXT?()

    • A、Create a test environment for the new version.
    • B、Determine system requirements for the upgrade.
    • C、Request bids from other competing vendors in the product space.
    • D、Document the upgrade.

    正确答案:A

  • 第8题:

    A customer purchased a new IBM xSeries x445.  They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server.  The rack houses an existing UPS unit for the entire rack.  Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()

    • A、Have optional Fibre Channel and Ethernet switches been installed in the server?
    • B、What is the available kVA value of the UPS?
    • C、Are there sufficient empty socket outlets in the UPS?
    • D、What is the impact on the power consumption of the data center cooling system?

    正确答案:B

  • 第9题:

    多选题
    You have an Ethernet network. Which of the conditions below can lead to increased congestion on your network?()
    A

    The use of Full-Duplex Mode.

    B

    The Creation on New Collision Domains.

    C

    The Creation on New Broadcast Domains.

    D

    The Addition of Hubs to the Network.

    E

    The use of switches in the Network.

    F

    The Amount of ARP or IPX SAP Traffic.


    正确答案: D,F
    解析: 暂无解析

  • 第10题:

    单选题
    When is a switched network that is running the Spanning Tree Protocol considered to be fully converged?()
    A

    when all switches have the same BID as the root switch

    B

    when all switches have received the MAC address of each neighboring switch

    C

    when every enabled switch port has been assigned a unique identifier

    D

    when every operating switch port is in either the blocking or forwarding state

    E

    when all switches are in either client, server, or transparent mode


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    You have just created a new VLAN on your network for inter-VLAN routing.  What is one step that you should include in your VLAN-based implementation and verification plan?()
    A

    Verify that different native VLANs exist between two switches for security purposes.

    B

    Verify that the switch is configured to allow for trunking on the switch ports.

    C

    Verify that each switch port has the proper IP address space assigned to it for the new VLAN. 

    D

    Verify that the VLAN virtual interface has been correctly created and enabled.


    正确答案: B
    解析: 暂无解析

  • 第12题:

    多选题
    You have just purchased a new Cisco 3560 switch running the enhanced IOS and need configure  it to be installed in a high availability network. On a 3560 EMI switch,  which three types of  interfaces can be used to configure HSRP?()
    A

    SVI interface

    B

    Access port

    C

    EtherChannel port channel

    D

    Loopback interface

    E

    Routed port

    F

    BVI interface


    正确答案: B,F
    解析: 暂无解析

  • 第13题:

    New switches have been purchased for a network upgrade. The objective for the network design emphasizes efficient, error-free transport instead of fast transport.Which switching mode should be configured on the new switches to provide error-free transport to the network? ()

    A. cut-through

    B. fragment-free

    C. frame-filtering

    D. store-and-forward

    E. 802.1q forwarding

    F. VTP transparent mode


    参考答案:D

  • 第14题:

    The revolution of machinery could __________without a new source of both movable and constant power in the new century.

    A. be born
    B. not have been born
    C. have been born
    D. have born

    答案:B
    解析:
    考查虚拟语气。当从句中出现without/ but for 等词时,主句要用虚拟语气,根据句意,如果没有新能源,机械改革不会诞生,再结合整句话的时态,应该用could not have been born。

  • 第15题:

    New switches have been purchased for a network upgrade. The objective for the network design emphasizes efficient, error-free transport instead of fast transport.Which switching mode should be configured on the new switches to provide error-free transport to the network? ()

    • A、cut-through
    • B、fragment-free
    • C、frame-filtering
    • D、store-and-forward
    • E、802.1q forwarding
    • F、VTP transparent mode

    正确答案:D

  • 第16题:

    You have just purchased a new Cisco 3560 switch running the enhanced IOS and need configure  it to be installed in a high availability network. On a 3560 EMI switch,  which three types of  interfaces can be used to configure HSRP?()

    • A、 SVI interface
    • B、 Access port
    • C、 EtherChannel port channel
    • D、 Loopback interface
    • E、 Routed port
    • F、 BVI interface

    正确答案:A,C,E

  • 第17题:

    Before inserting a new switch in the network,the network administrator checks that the VTP domain name is correct,the VTP mode is set to server, and revision is lower than the switches in the network. The administrator then configures interfaces and trunks,erases existing VLANs,and connects the switch to the network. Following that procedure,there is no connectivity in the network. What is a possible cause of this problem?()

    • A、Because the configuration revision of the new switches is lower than the rest of the network, it can change the VLAN database of the other switches.
    • B、As a VTP server, the new switch deleted all VLANs of the network.
    • C、Erasing VLANs increases the VTP configuration revision.
    • D、Since the configuration revision of the network is higher than the new switch, the VLAN database was automatically synchronized.

    正确答案:C

  • 第18题:

    A network administrator is explaining VTP configuration to a new technician. What should the network administrator tell the new technician about VTP configuration?()

    • A、A switch in the VTP client mode cannot update its local VLAN database.
    • B、A trunk link must be configured between the switches to forward VTP updates.
    • C、A switch in the VTP server mode can update a switch in the VTP transparent mode.
    • D、A switch in the VTP transparent mode will forward updates that it receives to other switches.
    • E、A switch in the VTP server mode only updates switches in the VTP client mode that have a higher VTP revision number.
    • F、A switch in the VTP server mode will update switches in the VTP client mode regardless of the configured VTP domain membership.

    正确答案:A,B,D

  • 第19题:

    When ordering switches for a new building, which of the following is the BEST way for the technician to determine the number of switches to put in each network closet?()

    • A、Review the architectural plans to see how many drops go to each closet.
    • B、Count the number of rooms near each closet and standardize eight drops per room.
    • C、Wireless is the new standard and no network switches will be needed in the building,
    • D、Count the number of phone ports and configure two network ports for each phone port.

    正确答案:A

  • 第20题:

    You are the network administrator setting up the IP network for a new branch office. You need at least 5 networks with 25 hosts each. You have been allocated a /24 network.Which prefix length will satisfy the given requirements?()

    • A、/24
    • B、/26
    • C、/27
    • D、/28

    正确答案:C

  • 第21题:

    单选题
    A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down.  What might explain what happened? ()
    A

    The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.

    B

    The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.

    C

    The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.

    D

    The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    A customer purchased a new IBM xSeries x445.  They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server.  The rack houses an existing UPS unit for the entire rack.  Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()
    A

    Have optional Fibre Channel and Ethernet switches been installed in the server?

    B

    What is the available kVA value of the UPS?

    C

    Are there sufficient empty socket outlets in the UPS?

    D

    What is the impact on the power consumption of the data center cooling system?


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    You have just created a new VLAN on your network.  What is one step that  you should include in your VLAN based implementation and verification plan? ()
    A

    Verify that different native VLANs exist between two switches for security purposes.

    B

    Verify that the VLAN was added on all switches with the use of the show vlan command. 

    C

    Verify that the switch is configured to allow for trunking on the switch ports.

    D

    Verify that each switch port has the correct IP address space assigned to it for the new VLAN.


    正确答案: D
    解析: 暂无解析