吊杆的安全工作负荷量是5吨
龙门吊的安全工作负荷量是5吨
起货机的安全工作负荷量是5吨
重吊杆的安全工作负荷量是5吨
第1题:
In relation to cargo gear, what does SWL mean ?______.
A.Safe working load
B.Ship’s working lift
C.Starboard wing lift
D.Stress, weight, load
第2题:
英文备注“the derrick safe working load 3t”的中文意思是:()
第3题:
The safe working load of the derrick is ().
第4题:
安全负荷量()
第5题:
“SWL” means ().
第6题:
The SWL of the derrick is five tons.
The SWL of the heavy derrick is six tons.
The SWL of the derrick is six tons.
The SWL of the crane is six tons.
第7题:
the characteristics,efficiency and limitation of the radar equipment
any constraints imposed by the radar range scale in use
the effect on radar detection of the sea state,weather and other sources of interference
the safe working load of the cranes both on board and ashore
第8题:
foreman
operator
opener
stevedore
第9题:
one-half the SWL of the main towing hawser
three-fourths the SWL of the main towing hawser
that of the main towing hawser
twice that of the main towing hawser
第10题:
4,based on the breaking strength
5,based on the maximum allowable stress
6,based on the maximum working load
8,based on the normal working load
第11题:
deck
head of the boom
heel of the boom
mast or king post
第12题:
year
two years
four years
five years
第13题:
The safe working load of the derrick is 5 tons.()
第14题:
The sailor on duty is ()the derrick now.
第15题:
这个吊杆的安全工作负荷是6吨。()
第16题:
Sailors should know the ()(安全工作负荷量)of derricks.
第17题:
A Windows XP system locks up after the GUI starts to load. The system will start in Safe Mode. TheEvent Viewer reports that a driver failed to load. Which of the following methods would help diagnose the problem? ()
第18题:
Safe working load
Ships working lift
Starboard wing lift
Stress , weight , load
第19题:
5 tons
5 metres
5 feet
5 years
第20题:
Manila line will usually last longer than nylon line
Nylon line is excellent for use in alongside towing
A normal safe working load will stretch nylon line 50%
Nylon stoppers should be used with nylon line
第21题:
after torque causes line pull to exceed the rated capacity of the winch
before the line pull reaches the rated capacity of the winch
when the line pull reaches the breaking strength of the fall
before the safe working load of the fall is reached
第22题:
safe working load
safe work load
safe worked load
safely working load
第23题:
single derrick
derrick
heavy derrick
deck