第1题:
Overcarriage is best prevented by ______.
A.assuring heavy cargo is stowed low in the vessel
B.checking the vessel's load line calculations carefully
C.inspection of the hold at completion of discharge
D.stowing the cargo which is to be discharged last on the bottom
第2题:
请打开货灯。()
第3题:
cargo runner()
第4题:
Renew a cargo runner, please. ()
第5题:
At each drill a different person should be in ()(负责)of an extinguisher.
第6题:
This cargo light is not ()enough. Please change it for a new one.
第7题:
Liquid cargo is loaded and discharged by pumps.
Liquid cargo is loaded and discharged by tubes.
Liquid bulk cargo is loaded and discharged by tubes.
Liquid bulk cargo is loaded and discharged by pumps.
第8题:
COW
LOT
CBT
coferdam
第9题:
Tallying
Examining
Weighing
Handling
第10题:
起货绞车
吊货钢丝
锚链舱
锚机
第11题:
assuring heavy cargo is stowed low in the vessel
checking the vessel's load line calculations carefully
inspection of the hold at completion of discharge
stowing the cargo which is to be discharged last on the bottom
第12题:
reducing the erosion of the cargo tanks
increasing the total quantity of oil to carry
reducing the quantity of water contained in oil
reducing cargo discharged time
第13题:
第14题:
A ()is at the end of the cargo runner for picking up the load.
第15题:
液体散货用泵装卸的。()
第16题:
Liquid bulk cargo is loaded and discharged by ()(泵).
第17题:
This cargo runner is too short. Please ()it for a long one.
第18题:
increases as the cargo closes the head while hoisting
increases if the cargo runner is doubled up
decreases as the boom is topped to a greater angle
is determined by the thrust stresses on the boom
第19题:
fall
stay
guy
sling
第20题:
pipes
tubes
buckets
pumps
第21题:
sling
hook
block
tackle
第22题:
non-packed cargo
packed cargo
cased cargo
inboard cargo
第23题:
charge
change
discharge
repair
第24题:
Look out
get
that
under repair