Add the virtual disks to IDE Controller 0.
Add the virtual disks to an existing SCSI controller.
Remove the virtual DVD drive, and add the virtual disks to IDE Controller1.
Add five SCSI controllers to the VM, and add one virtual disk to each SCSI controller.
第1题:
You are configuring a virtual machine (VM) that is running on a Windows Server 2008 R2 host server. The primary virtual disk is connected to IDE Controller 0. You need to add a virtual disk to the VM without shutting down the VM. What should you do?()
第2题:
You are configuring networking for a new Windows Server 2003 SP2 virtual machine(VM)in a Windows Server 2008 R2 Hyper-V environment.You need to configure the VM to achieve optimum network performance. Which two actions should you perform?()
第3题:
Your company has an Active Directory Domain Services (AD DS) domain that runs at the Windows Server 2008 functional level. All domain controllers run Windows Server 2008 R2 (Core Installation). You have a Remote Desktop Services infrastructure that includes a Remote Desktop Connection Broker (RD Connection Broker) server and aRemote Desktop Session Host (RD Session Host) server in redirection mode . You configure a virtual machine (VM) as a personal virtual desktop for an employee. The Personal Virtual Desktop tab is not visible when you display the properties of the employee is user account. You need to assign a personal virtual desktop to the user account. What should you do?()
第4题:
You are configuring a virtual machine (VM) that is hosted on a Windows Server 2008 R2 Hyper-V server. The VM is currently in the Running state. You need to export the VM without loss of data. What are two possible first steps that you could perform to achieve this goal?()
第5题:
Set the relative weight to 80.
Set the virtual machine limit to 80.
Set the virtual machine reserve to 80.
Set the number of logical processors to 2.
第6题:
Install the MS Loopback adapter on the virtual machine.
Enable the Multipath I/O feature on the host server.
Install Windows Server virtualization Guest Integration Components on the virtual machine.
Install the MS Loopback adapter on the host server.
None of the above
第7题:
Microsoft System Center Virtual Machine Manager (VMM) 2008 with a template
Microsoft Virtual Desktop Infrastructure (VDI)
Microsoft System Center Configuration Manager 2007 R2
Microsoft System Center Virtual Machine Manager (VMM) 2008 R2 with a template
第8题:
Move the VHD of one HAVM to a new iSCSI LUN.
Move the VHD of one HAVM to the system volume of a cluster node.
Configure Performance and Resource Optimization (PRO) on the Windows Server 2008 R2 cluster nodes.
Configure Windows System Resource Manager (WSRM) on the Windows Server 2008 R2 cluster nodes.
第9题:
On the host server, install the MS Loopback adapter.
On the host server, enable the Multipath I/O feature.
On the virtual machine, install the MS Loopback adapter.
On the virtual machine, install Windows Server virtualization Guest Integration Components.
第10题:
.Your companys virtual environment includes Windows Server 2008 R2 Hyper-V servers. You manage the environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You need to provide a user with the ability to perform only the Create, Delete, Start, Stop, Pause, Resume, and Shut Down virtual machine (VM) management tasks on your host servers . What should you do?()
第11题:
You have a server that runs Windows Server 2008. The server has the Windows Server virtualization role service installed and has one virtual machine. The virtual machine runs Windows Server 2008. You plan to install a new application on the virtual machine. You need to ensure that you can restore the virtual machine to its original state in the event the application installation fails. What should you do?()
第12题:
Your organization has an Active Directory Domain Services (AD DS) domain. All client computers run Windows 7. You create a Windows XP image. You need to deploy the image as a virtual machine (VM) to the cli ent computers so that the image can run in Windows Virtual PC. Which should you use?()
第13题:
You add a Windows Server 2008 R2 server with the Hyper-V role installed to an existing Hyper-V failover cluster. After you move a virtual machine (VM) to the new cluster node, Microsoft System Center Virtual Machine Manager (VMM) 2008 R2 reports the status of the VM as Unsupported Cluster Configuration. You need to be able to manage the VM by using VMM. What should you do?()
第14题:
C:///VM
C:///VM/Server1
C:///VM/Server1/Virtual Hard Disks
C:///VM/Server1/Virtual Machines
第15题:
Deploy the VMM Self Service Portal. Create VM templates. Create a self-service user role
Deploy the VMM Self-Service Portal. Add the users to the Power Users group. Deploy the VMM Administrator Console to the users
Deploy Windows Deployment Services (WDS). Create VM templates. Create a self-service user role
Deploy Windows Deployment Services (WDS). Add the users to the Power Users group. Deploy the VMM Administrator Console to the users
第16题:
Add the Storage Manager for SANs feature
Install a Virtual Disk Service (VDS) hardware provider
Use Cluster Shared Volumes (CSVs) to store the VM files
Install Microsoft System Center Virtual Machine Manager (VMM) 2008 R2
第17题:
Select the Copy the virtual machine option and the Duplicate all files check box.
Select the Copy the virtual machine option. Clear the Duplicate all files check box.
Select the Move or restore the virtual machine option and the Duplicate all files check box.
Select the Move or restore the virtual machine option. Clear the Duplicate all files check box.
第18题:
Install Microsoft System Center Virtual Machine Manager (VMM) 2008 R2
Install a Virtual Disk Service (VDS) hardware provider
Use Cluster Shared Volumes (CSVs) to store the VM files
Add the Storage Manager for SANs feature