第1题:
To “EASE” A LINE means to ___ .
A.cast off
B.double up so that one line does not take all the strain
C.pay out line to remove most of the tension
D.slack it off quickly
第2题:
If you are bunkering and you close off one tank in the line of tanks being filled,the rate of flow to other open tanks on the same line will ______.
A.increase
B.decrease
C.stop
D.remain constant
第3题:
A.line down;line protocol down
B.line down;line protocol
C.line up;line protocol down
D.line up;line protocol up
第4题:
以下哪些是informix数据库的工作模式:()。
第5题:
压气机离线清洗(off-line compressor washing)
第6题:
若DTR100前面板“AUDIO”口插入耳机话筒组,()面板喇叭被静音。
第7题:
the eye of the second line is dipped
the mooring lines are doubled
the bollard has two horns
one of the lines is a breast line
第8题:
Using a small scope ratio
Replacing that portion with a short length of chain
Using a hockle to keep that portion of the anchor line off the bottom
Using a synthetic line
第9题:
Secure all engine room doors,hatches,and vents
Close the fuel line valve
Check the spread of the fire with foam
Cast the barge off the wharf
第10题:
keep a line from fraying
join lines of unequal size
stop off a line
shorten a line
第11题:
离线(off-line)
同步(syc)
静模式(quiescent)
恢复(recovery)
关闭(shutdown)
在线(on-line)
只读(read-only)
第12题:
forward spring line and going slow ahead on the inboard engine
after spring line and going slow astern on the outboard engine
forward spring line and going slow ahead on both engines
forward spring line and going slow ahead on the outboard engine
第13题:
阅读以下程序 #includc<iostream.h> vold main() { Char line[10]; cin>>line; cout<<line<<endl; } 如运行时输入This is example.<CR>,则程序的输出结果是
A.This
B.This is
C.This is a
D.This is an example.
第14题:
You have completed a crude oil wash.What action should be taken with the oil in the lines running to the washing machines ________.
A.Open a COW nozzle forward and one aft and drain the line into the after tank by gravity
B.Blow the line out using compressed air
C.Pull a suction using the supply line pump
D.Close off all valves in the system and leave the oil in the line primed for the next crude oil wash
第15题:
简述ON LINE/OFF LINE的运行过程?
第16题:
While explaining to a customer the fault tolerant benefits of x445 they ask what happens if they implement memory mirroring and a DIMM fails in the SMP expansion module. Which of the following is the most appropriate response?()
第17题:
当用户端cisco路由器上用showinterface命令时line和lineprotocal可能出现的几种组合?()。
第18题:
DTR100的BB模块LED指示为黄色表示():
第19题:
be fitted with a positive fuel shut-off valve located at the tank
have a shut-off valve at the top of the tank
have a gate valve easily accessible in the space where the tank is located
have a drain cock at the lowest point in the fuel line
第20题:
increase
decrease
stop
remain constant
第21题:
cast
to cast of
cast off
to cast off
第22题:
Trip the generator off the switchboard
Turn off all electrical equipment
Remove the load from the off going generator
Increase the cycles of the generator staying on the line
第23题:
第24题:
overload condition of 5 % will trip the motor off the line immediately
overload condition will be indicated visually in the machinery space
motor running indicator will begin to flash on and off in response to the sustained overload condition
standby steering pump will start automatically and come on the line