Because the configuration revision of the new switches is lower than the rest of the network, it can change the VLAN database of the other switches.
As a VTP server, the new switch deleted all VLANs of the network.
Erasing VLANs increases the VTP configuration revision.
Since the configuration revision of the network is higher than the new switch, the VLAN database was automatically synchronized.
第1题:
A company is experiencing network delays. The network administrator discovers that a worker in a location far from the MDF has connected an old 10BASE-T switch with redundant links to the existing network.How could this action be responsible for the impaired network performance?()
A. Connecting a host to the old switch has created a broadcast storm.
B. The 10BASE-T switch forced the entire network to be reduced to 10 Mbps operation.
C. The old switch does not support VLANs, which has disabled the VLAN configuration of the entire the network.
D. The old switch does not support full-duplex operation, effectively forcing half-duplex operation throughout the network.
E. Spanning Tree Protocol has elected the old switch as the root bridge, creating inefficient data paths through the switched network.
第2题:
A network administrator needs to configure port security on a switch.which two statements are true?()
第3题:
The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch.What must be done to ensure that this new switch becomes the root bridge on the network?()
第4题:
The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch. What must be done to ensure that this new switch becomes the root bridge on the network?()
第5题:
You are configuring a new Catalyst switch that you want to manage remotely from workstations on other network segments within your enterprise.Which of the following are required to allow remote management of the switch over IP?()
第6题:
A user connecting a laptop to a wall jack is prompted for user credentials before being grantedaccess to the network. Which of the following is MOST likely implemented on the switch?()
第7题:
When installing a new PCIe network card, when should manufacturer software and drivers beinstalled?()
第8题:
Your network contains an internal network and a perimeter network. The internal network contains an Active Directory forest. The forest contains a single domain. You plan to deploy 10 Edge Transport servers on the perimeter network. You need to recommend a solution for the Edge Transport server deployment. The solution must meet the following requirements: .Allow administrators to apply a single security policy to all Edge Transport servers .Reduce the administrative overhead that is required to manage servers .Minimize the attack surface of the internal network What should you recommend?()
第9题:
The switch name must match the workgroup name of the local network.
The switch must be configured with an IP address and default gateway.
The remote workstations must have access to the management VLAN of the switch.
CDP must be enabled on the switch so that it can be located by other devices on the network.
第10题:
Install the exhaust fan on top of the IBM NetBAY 42 Enterprise rack for extra cooling
Ensure a 260V power source for the x445 and BladeCenter is available for fully redundant power
Ensure a 220v power source for the x445 is available for fully redundant power
Install the new 10GBit Ethernet network to take advantage of the new network switch in the x445.
Have their Network Operation Staff review and assist connecting the new server to their existing network.
第11题:
Before inserting the PCIe network card in the case
After inserting the new PCIe network card in the case
They will be automatically loaded after installation
Load them concurrently with the PCIe network card
第12题:
Lower the bridge priority number.
Change the MAC address of the switch.
Increase the VTP revision number for the domain.
Lower the root path cost on the switch ports.
Assign the switch an IP address with the lowest value.
第13题:
A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down. What might explain what happened? ()
第14题:
A network administrator needs to configure port security on a switch.which two statements are true?()
第15题:
A network administrator needs to force a high-performance switch that is located in the MDF to become the root bridge for a redundant path switched network. What can be done to ensure that this switch assumes the role as root bridge()。
第16题:
Before inserting a new switch in the network,the network administrator checks that the VTP domain name is correct,the VTP mode is set to server, and revision is lower than the switches in the network. The administrator then configures interfaces and trunks,erases existing VLANs,and connects the switch to the network. Following that procedure,there is no connectivity in the network. What is a possible cause of this problem?()
第17题:
A user is unable to connect to the network. A network technician is able to determine that there is a problem on the switch. All other users on that switch are able to connect successfully to the network. Which of the following is a probable cause?()
第18题:
A user has just moved a PC from one office to another. The patch cable and the NIC do notappear to be functioning in the new office but were working before the move. The patch cable is plugged in correctly to both the NIC and the wall jack. Which of the following actions should the technician take FIRST?()
第19题:
Your network contains a Hyper-V host named Hyperv1 that runs Windows Server 2012 R2. Hyperv1 has a virtual switch named Switch1. You replace all of the network adapters on Hyperv1 with new network adapters that support singleroot I/O virtualization (SR-IOV). You need to enable SR-IOV for all of the virtual machines on Hyperv1. Which two actions should you perform?()
第20题:
One router is running RIPv1.
RIP neighbor is 224.0.0.9.
The network contains a loop.
Network 10.10.1.0 is reachable.
第21题:
The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.
The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.
The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.
The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.
第22题:
Set the security type to the No authentication (Open) option.
Configure the wired and wireless network adapters as a network bridge.
Modify the wireless network profile type to the Use all-user profiles only (recommended) option.
On each wireless client, set the Service Set Identifier (SSID) for a new wireless network to the name of your wired network adapter.
第23题:
On each virtual machine, modify the Advanced Features settings of the network adapter
Modify the settings of the Switch1 virtual switch
Delete, and then recreate the Switch1 virtual switch
On each virtual machine, modify the BIOS settings
On each virtual machine, modify the Hardware Acceleration settings of the network adapter
第24题:
MAC filtering
IP address
PoE
Port speed