填空题Let f(x) be defined as the absolute value of the difference between the smallest and largest odd factors of x greater than 1. For example, f(42)=︱3-21︱=18. What is the value of f(90)?____

题目
填空题
Let f(x) be defined as the absolute value of the difference between the smallest and largest odd factors of x greater than 1. For example, f(42)=︱3-21︱=18. What is the value of f(90)?____

相似考题
更多“Let f(x) be defined as the absolute value of the difference”相关问题
  • 第1题:

    类MyClas的定义如下: class MyClas{ public: MyClas(){} MyClas(int a){ value=new.int(i); } int *value; }; 若要对类中的value赋值,则下面的语句中正确的是( )

    A.MyClas x;x.value=10;

    B.MyClas x; *x.value=10;

    C.MyClas x;x. *value=10;

    D.MyClas x(10);


    正确答案:D
    解析:选项A中,直接对地址赋值,因此选项A是错误的;c++中不能对未初始化的指针变量赋值,因此选项B是错误的;选项C有语法错误;选项D通过调用类的构造函数给value赋初值10。

  • 第2题:

    The indemnity for damage to cargo shall be determined on the basis of the {difference} between the value of the goods before and after the damage.

    A.profit

    B.surplus

    C.interest

    D.balance


    正确答案:D

  • 第3题:

    The difference value between Budgeted Cost for Work Performed and Actual Cost for Work Performed is ( ).

    A.Cost Variance
    B.Schedule Variance
    C.EarneD.Value
    D.Cost PerformeD.Index

    答案:A
    解析:
    BCWP与ACWP之间的差值是 。

    A.成本偏差 B.进度偏差 C.挣值 D. 成本绩效

  • 第4题:

    The total CIP value of your order comes()$960 instead of $690,the difference()$270.

    • A、to,be
    • B、at,being
    • C、to,being
    • D、at,tobe

    正确答案:C

  • 第5题:

    What does it mean for a variable in the Application Editor to be defined as a parameter?()

    • A、The variable can be used to pass data to and from subflows.  
    • B、The value for that variable can be supplied via Application Configuration in Application Administration.  
    • C、The value for that variable is defined by the calling application.  
    • D、The variable can be used in conditional steps.  
    • E、The variable can be used to pass data to and from VoiceXML applications.

    正确答案:B

  • 第6题:

    单选题
    The total CIP value of your order comes()$960 instead of $690,the difference()$270.
    A

    to,be

    B

    at,being

    C

    to,being

    D

    at,tobe


    正确答案: A
    解析: 暂无解析

  • 第7题:

    单选题
    For all real values of x and y, let x◆y be defined by the equation x◆y = 2 -xy. If -1 < a < 0 and 0 < b < 1, then which of the following must be true?
    A

    -2<a+b<-1

    B

    -l<a+b<0

    C

    0<a+b<l

    D

    l<a+b<2

    E

    2<a+b<3


    正确答案: B
    解析:
    根据题干,发现a= -1/2, b =1/2满足已知条件,a◆b=2-ab,将a= -1/2, b =1/2代入进去,则(-1/2) ◆(1/2) = 2 - (-1/2)(1/2) = 2 + 1/4 = 2.25,故选E。

  • 第8题:

    单选题
    The steady state difference between the control point and the value of the controlled variable, corresponding with the set point, is known as ()
    A

    dead band

    B

    control point

    C

    deviation

    D

    offset


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    The pressure difference of the gauge on the oily water separator increases greatly, the reason is()
    A

    the filter is clogged

    B

    bilge suction value is clogged

    C

    suction value and discharge value of the pump do not open fully

    D

    screw pump is worn seriously and volumetric efficiency is decreased


    正确答案: D
    解析: 暂无解析

  • 第10题:

    单选题
    What is the default value for the ENABLED attribute of a job or program when it is created?()
    A

     TRUE

    B

     FALSE

    C

     There is no default. It must be defined at creation time.

    D

     PENDING

    E

     NULL


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    public class SwitchTest {   public static void main (String args) {   System.out.PrintIn(“value =” +switchIt(4));   }   public static int switchIt(int x) {   int j = 1;   switch (x) {   case 1: j++;   case 2: j++;   case 3: j++;  case 4: j++;   case 5: j++;   default:j++;   }   return j + x;   }   }   What is the output from line 3? ()
    A

     Value = 3

    B

     Value = 4

    C

     Value = 5

    D

     Value = 6

    E

     Value = 7

    F

     Value = 8


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    Evaluate this SQL statement: What will happen if you remove all the parentheses from the calculation?()
    A

    The value displayed in the CALC_VALUE column will be lower.

    B

    The value displayed in the CALC_VALUE column will be higher.

    C

    There will be no difference in the value displayed in the CALC_VALUE column.

    D

    An error will be reported.


    正确答案: B
    解析: 暂无解析

  • 第13题:

    The difference value between Budgeted Cost for work Performed and Actual Cost for Work Performed is( ).

    A.Cost Variance B.Schedule Variance C.Earned Value D.Cost Performed Index


    正确答案:A

  • 第14题:

    Fog is likely to occur when there is little difference between the dew point and the ______.

    A.relative humidity

    B.air temperature

    C.barometric pressure

    D.absolute humidity


    正确答案:B
    当露点温度与空气温度有轻微的差异时,雾就很可能发生。

  • 第15题:

    public class SwitchTest {  public static void main(String[] args) {  System.out.println(“value = “ + switchIt(4));  }  public static int switchIt(int x) {  int j = 1;  switch (x) {  case 1: j++; case 2: j++;  case 3: j++;  case 4: j++;  case 5: j++;  default: j++;  }  return j + x; }  }  What is the result?()  

    • A、 value = 3
    • B、 value = 4
    • C、 value = 5
    • D、 value = 6
    • E、 value = 7
    • F、 value = 8

    正确答案:F

  • 第16题:

    Which two statements about sequences are true? ()

    • A、You use a NEXTVAL pseudo column to look at the next possible value that would be generated from a sequence, without actually retrieving the value.
    • B、You use a CURRVAL pseudo column to look at the current value just generated from a sequence, without affecting the further values to be generated from the sequence.
    • C、You use a NEXTVAL pseudo column to obtain the next possible value from a sequence by actually retrieving the value from the sequence.
    • D、You use a CURRVAL pseudo column to generate a value from a sequence that would be used for a specified database column.
    • E、If a sequence starting from a value 100 and incremented by 1 is used by more than one application, then all of these applications could have a value of 105 assigned to their column whose value is being generated by the sequence.
    • F、You use a REUSE clause when creating a sequence to restart the sequence once it generates the maximum value defined for the sequence.

    正确答案:B,C

  • 第17题:

    You need to design the restrictions on the Bank.Customers table. Which three actions should you perform?()

    • A、Design a trigger that verifies that the first names and surnames are not empty strings.
    • B、Design a check constraint that verifies that the first names and surnames are not empty strings.
    • C、Design a check constraint that uses a CLR user-defined function to verify that either the phone number is a null value or the format of the phone number is valid.
    • D、Design a trigger that uses a CLR user-defined function to verify that either the phone number is a null value or the format of the phone number is valid.
    • E、Design a check constraint that ensures that the phone number cannot be changed from a valid format to a null value or to an invalid format.
    • F、Design a trigger that ensures that the phone number cannot be changed from a valid format to a null value.

    正确答案:B,C,F

  • 第18题:

    填空题
    If the function f is defined by f(x)= (2x-4)/3 for what value of x does f(x) = 18?____

    正确答案: 29
    解析:
    因为f(x)= (2x-4)/ 3=18,2x - 4 = 54,x = 29。

  • 第19题:

    单选题
    Let Ω p be defined as p2/3-p for all positive integers, p. If Ωn = s, and s is a positive integer, which of the following is a possible value for s?
    A

    1

    B

    3

    C

    5

    D

    6

    E

    8


    正确答案: D
    解析:
    根据题干Ωn =n2 /3-n=s. n为正整数,且s为正整数;根据函数可知只有当n是3的倍数时,s才能为整数,否则如果n2 /3不是整数,s也不是整数。现在可以从符合条件的n的最小值3代入到函数中。当n=3时,n2 /3-n =32 /3-3 = 3-3 = 0 = s;当n=6时,n2 /3-n = 62 /3-6 = 12-6 = 6 = s。所以故选D。

  • 第20题:

    单选题
    A change of trim may be simply defined as().
    A

    the change in difference between the forward and aft drafts

    B

    the sum of free communication,free surface and pocketing

    C

    the moment of inertia of the ship's waterline plane about the athwartship axis

    D

    rolling and listing


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    The difference between measured and desired values is called ().
    A

    make-up

    B

    desired value

    C

    deviation

    D

    set value


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    What is the default value for the ENABLED attribute of a job or program when it is created? ()
    A

    TRUE

    B

    FALSE

    C

    There is no default. It must be defined at creation time.

    D

    PENDING

    E

    NULL


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    What does it mean for a variable in the Application Editor to be defined as a parameter?()
    A

    The variable can be used to pass data to and from subflows.  

    B

    The value for that variable can be supplied via Application Configuration in Application Administration.  

    C

    The value for that variable is defined by the calling application.  

    D

    The variable can be used in conditional steps.  

    E

    The variable can be used to pass data to and from VoiceXML applications.


    正确答案: C
    解析: 暂无解析