更多“A boom vang().”相关问题
  • 第1题:

    With a given load on the cargo hook,the thrust on a cargo boom ______.

    A.increases as the angle to the horizontal increases

    B.increases as the angle to the horizontal decreases

    C.is greatest at an angle of 45° and decreases as the boom is raised or lowered

    D.is least at an angle of 45° and increases as the boom is raised or lowered


    正确答案:A

  • 第2题:

    What is meant by the term“luffing the boom”of a crane ________.

    A.Stopping the boom

    B.Topping or lowering the boom

    C.Moving the boom left or right

    D.All of the above


    正确答案:B

  • 第3题:

    A boom vang ______.

    A.holds the boom down and flattens the main sail

    B.draws the head of the sail to windward

    C.tautens the standing rigging

    D.douses the gaff topsail


    正确答案:A
    吊杆张索把持吊杆向下和主帆变平。

  • 第4题:

    ASP(音频控制面板)的正常位置是()

    • A、MASK/BOOM开关在BOOM位;ALT/NORM开关在NORM位
    • B、MASK/BOOM开关在MASK位;ALT/NORM开关在NORM位
    • C、MASK/BOOM开关在MASK位;ALT/NORM开关在ALT位
    • D、MASK/BOOM开关在BOOM位;ALT/NORM开关在ALT位

    正确答案:A

  • 第5题:

    起重机()

    • A、derrick
    • B、heavy derrick
    • C、crane
    • D、boom

    正确答案:C

  • 第6题:

    单选题
    What is meant by the term TOPPING THE BOOM?()
    A

    Lowering the boom

    B

    Raising the boom

    C

    Spotting the boom over the deck

    D

    Swinging the boom athwartships


    正确答案: C
    解析: 暂无解析

  • 第7题:

    单选题
    What is meant by the term“luffing the boom”of a crane().
    A

    Stopping the boom

    B

    Topping or lowering the boom

    C

    Moving the boom left or right

    D

    All of the above


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    The boom stops are installed on an offshore crane to().
    A

    prevent the boom from being raised too high

    B

    prevent the boom from swinging

    C

    support the boom when not in use

    D

    prevent the boom from being lowered


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    The hinge fitting used to attach the boom to the mast is the().
    A

    gooseneck

    B

    step

    C

    swivel

    D

    pintle


    正确答案: D
    解析: 暂无解析

  • 第10题:

    单选题
    With a given load on the cargo hook,tension in a single span topping lift().
    A

    increases as the boom's angle to the horizontal increases

    B

    is at a maximum when the boom is at a 45° angle to the horizontal

    C

    increases as the boom's angle to the horizontal decreases

    D

    decreases as the boom's angle to the horizontal decreases


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    What does “evel-luffing” accomplish during crane operations().
    A

    It prevents the load from swinging when the boom level is adjusted

    B

    Less power is needed when topping the boom with a load on the hook

    C

    It maintains the height of the load above the deck

    D

    All of the above


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    The boom indicator on a crane will indicate the().
    A

    length of the boom

    B

    angle of the boom

    C

    lifting capacity of the boom

    D

    direction of the boom


    正确答案: B
    解析: 暂无解析

  • 第13题:

    The signal man assisting a crane operator has his arm extended with his fingers closed and thumb pointing upward.This is the signal to ______.

    A.raise the boom

    B.raise the hook

    C.raise the boom and hook

    D.check the boom stop


    正确答案:A

  • 第14题:

    When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.

    A.winch speed

    B.boom strength

    C.load radius

    D.cable strength


    正确答案:C

  • 第15题:

    I系列MSC中,VANG_A位于()单元。

    • A、M
    • B、CM
    • C、OMU
    • D、CCM

    正确答案:D

  • 第16题:

    There is no power for the ()(起货机).

    • A、winch
    • B、crane
    • C、derrick
    • D、boom

    正确答案:A

  • 第17题:

    单选题
    The signal man assisting a crane operator has his arm extended with his fingers closed and thumb pointing upward. This is the signal to().
    A

    raise the boom

    B

    raise the hook

    C

    raise the boom and hook

    D

    check the boom stop


    正确答案: B
    解析: 暂无解析

  • 第18题:

    单选题
    The boom stops on a pedestal crane prevent the boom from().
    A

    being raised too high

    B

    swinging at sea

    C

    overloading when not in use

    D

    being lowered too low


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    The process of lowering a boom to a horizontal position and onto its deck support is called().
    A

    spotting a boom

    B

    collaring a boom

    C

    cradling a boom

    D

    toppling a boom


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    For a given weight of cargo,the stress on the heel block of a cargo boom().
    A

    increases as the cargo closes the head while hoisting

    B

    increases if the cargo runner is doubled up

    C

    decreases as the boom is topped to a greater angle

    D

    is determined by the thrust stresses on the boom


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    With a given load on the cargo hook,the thrust on a cargo boom().
    A

    increases as the angle to the horizontal increases

    B

    increases as the angle to the horizontal decreases

    C

    is greatest at an angle of 45° and decreases as the boom is raised or lowered

    D

    is least at an angle of 45° and increases as the boom is raised or lowered


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    When viewed from above,the best position for the guy in relation to the boom is().
    A

    At a 45° angle

    B

    At right angles

    C

    4 feet aft of the heel of the boom

    D

    Parallel to the boom


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    0n a crane ,the boom indicator tells the operator what angle the boom angle is compared to the().
    A

    vertical position

    B

    horizontal position

    C

    boom stop angle

    D

    minimum radius angle


    正确答案: D
    解析: 暂无解析