IBM technical support services
IBM Global Financing
IBM Global Business Services
IBM Solutions Assurance Review
第1题:
Which of the following replication methods provides a disaster recovery system with minimal downtime to normal operations?()
第2题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()
第3题:
A customer has two sites located 500 kilometers apart. The customer has both a high-speedInternet link and dark fiber between the sites. The customer wants to utilize storage resources ateither site leveraging replication for disaster recovery implementations. The customer wants to linkthese two sites together. Which option provides the highest performance and is most reliable?()
第4题:
A customer has a requirement for Disaster Recovery for compliance within their industry. Theyhave an RPO of 4 hours and an RTO of 24 hours. Cost is a consideration. What is the most costeffective DR implementation?()
第5题:
An architectural design company with 45 employees has their office located within 5 kilometers oftheir disaster recovery center. They have an IBM System Storage N6040 installed at bothlocations. In this customer environment what protocol would be used for disaster recovery?()
第6题:
A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup. Which factor is a primary consideration when proposing a solution for this customer()
第7题:
A customer wants to deploy a centralized storage system to support a new database. Which of the following factors should the storage specialist consider first?()
第8题:
A customer is considering a second p690 at a second site for Disaster Recovery purposes. Which of the following On Demand offerings is most applicable in this environment?()
第9题:
You create a Web site for a customer. You need to deploy the Web site to the customers server without any of the source files for the Web site. You do not want the customer to be able to update any of the static pages on the Web site. Which tool should you use? ()
第10题:
Hot site
Cold site
Warm site
Failover site
第11题:
aspnet_compiler.exe
InstallUtil.exe
CSC.exe
aspnet_wp.exe
第12题:
Global Mirror for zSeries
Metro Mirror
Global Copy
Metro/Global Mirror
第13题:
A customer plans to deploy Open Fabric Manager (OFM). Which vendors would you recommend?()
第14题:
A customer plans to deploy Open Fabric Manager (OFM). Which vendors meet this need of the following?()
第15题:
Which of the following can be used to re-deploy a system configuration in a disaster recovery scenario?()
第16题:
A global customer’s IT strategy is based upon two DS8000 systems and an N series gateway. They want to protect their business by implementing a disaster recovery solution. The storage specialist has recommended cascaded mirroring. Which of the following is the business benefit of cascaded replication()
第17题:
A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site. Which IBM System Storage DS8000 solution should the storage specialist propose to the client()
第18题:
A customer has a large amount of data stored on three database servers and is concerned that at present there is no disaster recovery plan in place. They have an existing tape backup solution that meets their backup window. In order to analyze potential disaster recovery plans, which of the following questions is the most important?()
第19题:
A customer plans to deploy a disaster recovery site and requires a complete mirror of their production and test environments. They have an excellent relationship with the business partner who helped them with their initial deployment. Which of the following will help with a successful implementation?()
第20题:
A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products best accomplishes this task?()
第21题:
a disk-to-disk backup solution keeping all storage in the data center
a backup solution that includes magnetic tape that is shipped to an off-site storage facility
a less powerful copy environment at a hot site with asynchronous mirroring and cluster technology
an exact copy of the primary environment at a hot site with remote mirroring and cluster technology
第22题:
On/Off CoD
Reserve CoD
Permanent CUoD
Capacity Backup
第23题:
compatibility of copy functions
difference in capacities in the two systems
cache size discrepancies between the two systems
the necessity of using two storage management products
第24题:
Cold site
Warm site
GFS
Hot site