You deploy two different applications to the WebLogic container. One application use Xerces parser version A and the other application uses Xerces parser version B. Both these versions are different from the parser version that the WebLogic server uses internally. You want to use the Filtering Classloader feature to solve this problem. What action would you take to generate proper filtering Classloader entries?()
第1题:
Your company has a main office and a branch office. The offices connect by using WAN links. The network consists of a single Active Directory domain. An Active Directory site exists for each office. Servers in both offices run Windows Server 2008 R2 Enterprise. You plan to deploy a failover cluster solution to service users in both offices. You need to plan a failover cluster to meet the following requirements: èMaintain the availability of services if a single server fails èMinimize the number of servers required What should you include in your plan?()
第2题:
Your network consists of a single Active Directory domain. The network contains a file server that runs Windows Server 2008 R2. All servers use internal storage only. You plan to deploy a client/server application. You need to deploy the application so that it is available if a single server fails. You must achieve this goal while minimizing costs. What should you do?()
第3题:
Your company has an Active Directory forest. The forest contains two sites named Site1 and Site2. You plan to deploy Exchange Server 2010 servers in both sites. You need to plan a high-availability solution for the Mailbox servers that meets the following requirements:.Users must be able to access their mailboxes if a single server fails .Users must be able to access their mailboxes remotely if a single site becomes unavailable What should you do?()
第4题:
You deploy mobile devices that run Microsoft Windows Mobile 5.0. Company security policy requires an authentication process that is stronger than a user name and password combination. You need to ensure that Microsoft ActiveSync sessions use an authentication process that meets the company security policy. What should you do?()
第5题:
You are planning to deploy Windows 7 Enterprise to all of your company’s client computers. You have the following requirements: Create two custom partitions on each client computer’s hard disk, one for the operating system and the other for data. Automatically create the partitions during Windows Setup. You need to design an image that meets the requirements. What should you do?()
第6题:
Your network contains two data centers named Datacenter1 and Datacenter2. An Active Directory site exists for each data center. The data centers connect to the Internet by using a direct link. The data centers connect to each other by using a high-speed WAN link. You plan to deploy Exchange Server 2010 Mailbox servers in both data centers. You need to plan message routing to meet the following requirements:.Ensure outbound delivery of e-mail messages if a single server fails .Automatically load balance the Hub Transport server in each site .Deploy the minimum number of servers What should you include in the plan?()
第7题:
You need to recommend an RD Gateway configuration that meets the company’s technical requirements. What should you recommend?()
第8题:
Deploy a failover cluster that contains one node in each office.
Deploy a failover cluster that contains two nodes in each office.
In the main office, deploy a failover cluster that contains one node. In the branch office, deploy a failover cluster that contains one node.
In the main office, deploy a failover cluster that contains two nodes. In the branch office, deploy a failover cluster that contains two nodes.
第9题:
Use Windows PE to create the partitions. Install Windows 7 on the first partition.
Use Windows System Image Manager (Windows SIM) to specify the partition configuration.
Use Disk Management to create the two partitions on the hard disk.
Use SysPrep to create the two partitions during Windows Setup.
第10题:
reduced backup
increased security
greater storage demand
improved availability
第11题:
Deploy the application tier and the business tier to one role with two Medium instances.
Deploy the application tier and the business tier to one role with two Large instances.
Deploy the application tier role to a Medium instance. Deploy the business tier role to a medium instance.
Deploy the application tier role to a Large instance. Deploy the business tier role to a Large instance.
第12题:
In each data center, deploy one Hub Transport server. Create and configure one Send connector.
In each data center, deploy two Hub Transport servers. Create and configure one Send connector.
In each data center, deploy one Edge Transport server. Create and configure two Send connectors.
In each data center, deploy two Edge Transport servers. Create and configure two Send connectors.
第13题:
You need to recommend a solution for the new VMs that supports the company's planned changes What should you recommend doing before the new VMs are deployed?()
第14题:
Your network contains an internal network and a perimeter network. The internal network contains a single Active Directory site. The perimeter network contains two Exchange Server 2010 Edge Transport servers. You plan to deploy an Exchange Server 2010 organization on the internal network. You need to plan the deployment of Hub Transport server roles to meet the following requirements:.If a single Hub Transport server fails, e-mail messages from the Internet must be delivered to the Mailboxservers. .If a single Hub Transport server fails, users must be able to send e-mail messages to other users thathave mailboxes on the same Mailbox server. What should you include in the plan?()
第15题:
Your Exchange Server 2010 organization contains two Hub Transport servers in a single site. The organization receives all e-mail sent to a SMTP domain named contoso.com. Your company purchases another company that uses a SMTP domain named fabrikam.com. You plan to manage message hygiene for both SMTP domains. You need to recommend changes to the organization to support the planned deployment. The solution must prevent e-mail sent to fabrikam.com from being delivered to your internal organization. What should you recommend?()
第16题:
Your network consists of a single Active Directory site. You plan to deploy Exchange Server 2010. You need to plan the deployment of Exchange Server 2010 servers to meet the following requirements:.All Mailbox servers must belong to a database availability group (DAG) .MAPI connections from Outlook clients must be load balanced by using a hardware load balancer .If a single server fails, users must continue to send and receive e-mail .The plan must minimize the number of servers deployed What should you include in the plan?()
第17题:
You have a Microsoft Internet Security and Accelerator (ISA) 2006 server that provides all Internet accessfor your company. You have two Mailbox servers configured in a database availability group (DAG), two Client Accessservers, and two Hub Transport servers. You need to recommend changes to the environment to ensure that users can access Outlook Web App(OWA) from the Internet if any single server fails. What should you recommend?()
第18题:
Your network contains two Active Directory sites. The sites connect to each other by using a WAN link. You plan to deploy two Exchange Server 2010 Mailbox servers and two Client Access servers in eachsite. Each site will contain a Client Access array. You need to recommend a solution to deploy Hub Transport servers. The solution must meet the following requirements:.Continue to deliver e-mail messages to users in other sites if a single Hub Transport server fails .Support the planned Client Access array deployment.Minimize the number of Exchange servers What are two possible ways to achieve this goal?()
第19题:
Dynamic Tunnel Endpoints (DTEs)
Corporate Portal Site
Corporate Resources
PortalName
第20题:
Deploy two servers. On the two servers,deploy the Mailbox server role,the Client Access server role,and the HubTransport server role. Configure a Client Access server array.
Deploy two servers. On the two servers, deploy the Mailbox server role,the Client Access Server role,and the HubTransport server role. Enable Outlook Anywhere on both Client Access servers.
Deploy four servers. On two of the servers,deploy the Mailbox server role and the Hub Transport server role. On the other two servers,deploy the Client Access server role. Configure a Client Access server array.
Deploy four servers. On two of the servers,deploy the Mailbox server role. On the other two servers,deploy the Client Access server role and the Hub Transport server role. Enable Outlook Anywhere on both Client Access servers.
第21题:
secedit
gpupdate
netdom
scwcmd
第22题:
In each perimeter network, deploy one Edge Transport server. Implement failover clustering.
In each perimeter network, deploy two Edge Transport servers. Implement failover clustering.
In each perimeter network, deploy one Edge Transport server. Configure a mail exchange (MX) record for each server.
In each perimeter network, deploy two Edge Transport servers. Configure a mail exchange (MX) record for each server.
第23题:
At deploy time, Java EE containers add a directory called META-INF directly into the MyApp directory.
At deploy time, Java EE containers add a file called MANIFEST.MF directly into the MyApp directory.
It can instruct your Java EE container to verify, at deploy time, whether you have properly configured your application’s classes.
At deploy time, Java EE containers add a directory call META-WAR directly into the MyApp directory.
第24题:
Create an Active Directory site for each office. Deploy two global catalog servers in each site.
Create an Active Directory site for each office. Deploy a single domain controller in each site,and then enable site link bridging.
Create an Active Directory site for all of the offices. Deploy a global catalog server and a read-only domain controller in each site.
Create an Active Directory site for all of the offices. Deploy a global catalog server and two read- only global catalog servers in each Active Directory site.