The engineer hasn’t got time to track down the problem.‘To track down’ means to find out.
第1题:
I don't understand what the engineer means, but I’ve got rough idea of
Project plan.
A. the; a B. 不填; theC. the;不填 D. a ; the
第2题:
—How about your journey to Mount Emei ?
—Everything was wonderful except that our car _________ twice on the way .
A. slowed down B. broke down C. got downD. put down
第3题:
We were able to () the error and have credited your account.
A、track out
B、track down
C、track over
D、track up
第4题:
A. ICMP
B. SNMP
C. TCP
D. HTTPS
第5题:
Will you please turn down the TV?()
AI‘ll turn it down next time.
BNever mind if you turn it down.
CIt sounds reasonable.
DSorry. I haven‘t realized you‘re sleeping.
第6题:
Will you please turn down the TV?()
第7题:
A system must be upgraded from AIX 5.1 to 5.2. Which of the following scheduling processes should be performed? ()
第8题:
Which two statements about the track configuration option are correct?()
第9题:
rolling period
amplitude moment
inclining moment
pitching period
第10题:
jumping
five track and field events
throwing
ten track and field events
第11题:
I’m sorry, I didn’t realize it was that loud
Please forgive me
I’ll keep it down next time
第12题:
对
错
第13题:
_________
[A] given up [B] got over [C] carried on [D] put down
本题考查固定搭配。get down to的意思是归因于,符合句意。而give up to的意思是让给,get over to的意思是让某人明白某事,carry on的意思是继续开展,坚持,均不合题意。故答案为D。
第14题:
The words "chop down" in the second paragraph means______
A. clear
B. make room for
C. destroy
D. cut down
此题为词汇题。第二段中的词汇chop down意思是“砍伐”。
第15题:
A. The track option monitors interfaces as defined by the user.
B. The track option monitors all interfaces participating in VRRP.
C. The track option allows for a reduction of the priority value if the monitored interface goes down.
D. The track option causes syslog entries to be written in the messages log file, if the monitored interface goes down.
第16题:
The engineer hasn’t got time to track down the problem.‘To track down’ means to find out.
A对
B错
第17题:
-Can you turn down the radio, please? -()
第18题:
You are asked to configure real-time performance monitoring (RPM) between two Junos devices to track traffic in your network. Which two application traffic types can you track?()
第19题:
A system administrator needs to upgrade the Oracle database from Version 7 to Version 8. Which of the following scheduling concerns should be considered?()
第20题:
The track option monitors interfaces as defined by the user.
The track option monitors all interfaces participating in VRRP.
The track option allows for a reduction of the priority value if the monitored interface goes down.
The track option causes syslog entries to be written in the messages log file, if the monitored interface goes down.
第21题:
detract
extract
pump up
pump down
第22题:
Any time. It’s far from here, isn’t it?
Do you want me to go with you?
No problem. What can I do for you?
Of course. Go down this street and turn right.
第23题:
By backing down the track and cutting out ice on either bow
By approaching from the stern and crossing ahead at an angle of 20° to 30° to the beset ship's course
By overtaking the beset ship,running ahead and then backing down the track to the beset vessel
By approaching the vessel from astern and towing the beset vessel stern first