A company plans to upgrade a network server. Before proceeding with the upgrade, the HCL (Hardware Compatibility List) and hardware is checked and necessary backups and documentation are made. The existing 512 MB of SDRAM is replaced with 1024 MB. The 10 Mbps network card is replaced with a 10/100 PCI network card. When the server restarts, beeps sound and the server does not pass the POST. Which of the following is the MOST likely cause of the problem?()
第1题:
A technician is attempting to configure Windows XP Media Center on a desktop from a CD. The message that comes up on the screen says ‘Missing NTLDR press any key to reboot’. Which of the following should the technician do NEXT?()
第2题:
You want to upgrade your MS Windows 98 computer to Windows 2000 professional. Before the actual installation, you want to know whether your system’s hardware or software is compatible with Windows 2000 professional or not. What you will do. ()
第3题:
You are the network administrator for Company.com. Your computer has a CD-ROM drive attached to a SCSI adapter. You plan to upgrade your computer from Windows NT Workstation 4.0 to Windows 2000 Professional. You determine that the SCSI adapter is not included on the current Hardware Compatibility List (HCL) and that the original SCSI drivers that you used for Windows NT are not compatible with Windows 2000 Professional. You want to upgrade your computer to Windows 2000 Professional. What should you do?()
第4题:
In what way does Cisco SMARTnet help customers protect their network investments?()
第5题:
Which of the following is a best practice that can be used to ensure consistency when building systems?()
第6题:
Which of the following tools can be used prior to installing Windows Vista to find hardware compatibility issues?()
第7题:
The latest SCSI adaptor card is purchased from a vendor. Drivers for the operating system cannot be obtained. The SCSI adapter card is added to an existing server. Upon booting, the operating system does not detect the card. Which of the following is the MOST likely cause of the problem?()
第8题:
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()
第9题:
Your computer runs Microsoft Windows XP Professional. The computer has the following hardware configuration: 512 MB of RAM 1-GHz processor 60-GB hard disk 15 GB of free space 64-MB video adapter. You perform a clean install of Microsoft Windows Vista. You need to ensure that Microsoft Windows Aero Experience is supported. What should you do?()
第10题:
Your computer runs Microsoft Windows XP Professional. The computer also runs 20 third-party applications. You plan to upgrade your computer to Microsoft Windows Vista. The functionality of the existing 20 applications must be maintained even after you upgrade your computer. You need to ascertain whether the hardware and software on the Windows XP Professional computer will support the upgrade. What should you do?()
第11题:
It lets the administrator know which hardware will work with a particular OS.
It sets the bare minimum hardware requirements for specified software.
It allows the administrator to verify software compatibility amongst various vendors.
It verifies that hardware is fit for certain overclocking performance metrics.
第12题:
The memory is not seated correctly.
The network card is not configured correctly.
The server does not support 1024 MB of memory.
Master SDRAM ECC needs to be enabled in the CMOS.
第13题:
A retail customer has just install an IBM option into their server, but the option is not working properly. Which the following should be checked to determine if the devices is supported in the server?()
第14题:
You plan to upgrade a computer that runs Windows 2000 to Windows XP Professional. You need to verify that the applications currently installed on the computer will run after the upgrade. What should you do before you start the Windows XP Professional installation?()
第15题:
If XYZ LTD has a problem with the hardware, which two options does the Cisco SMRTnet Contract Offer?()
第16题:
n what way does Cisco SMARTnet help customers protect their network investments?()
第17题:
A Windows XP Professional PC needs to be checked for compatibility before being upgraded toWindows Vista Business. Which of the following would be the BEST action to take before theupgrade?()
第18题:
After installing a new optical drive into a workstation, which of the following will ask for anacknowledgement?()
第19题:
A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()
第20题:
A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS. Which of the following must be completed prior to this migration ()
第21题:
As the administrator of your company’s network you are asked to upgrade several Windows NT 4.0 computers to Windows 2000 Professional. All user settings and application settings must be preserved. Most applications currently running are compatible with Windows 2000 and all the Windows NT 4.0 computers meet the minimum hardware requirements. After you upgrade several computers to Windows 2000 Professional, you find that some applications did not upgrade properly. What utilities and/or applications should be disabled (or removed) before upgrading?()
第22题:
The SCSI card is not seated correctly.
The termination is incorrectly set on the SCSI card.
The SCSI card is not listed on the operating system HCL (Hardware Compatibility List).
Operating system patches were not updated before installing the card.
第23题:
Cisco IOS upgrade, including the most recent patches and bug fixes
OnSite Support
Advanced Hardware Replacement
No Hardware Replacement