A server has a processor that allows it to calculate two applications at the same time. Which of the following describes this capability of the processor?()
第1题:
Companycom is converting an application over to a p5 595 server with LPARs and has underestimated the processor requirements. The system has COD processors, but the customer does not know how to size the workload. What course of action would help identify the processor requirement?()
第2题:
A company would like to upgrade an old server to a multi-processor box. The server currently has asingle 3.0GHz 1Mb cache processor in it with a single empty socket. The only processor that is available from a manufacturer is a 3.0GHz 2Mb cache model. Which of the following is the BEST reason why this upgrade will not work?()
第3题:
An administrator has shut down a server to install additional memory. When the administrator restarts the server after the upgrade, it times out. Which of the following could be the cause of the problem?()
第4题:
A customer has 15 IBM x365 servers in a rack environment and is using IBM Director for systems management. They require the ability to restart any server independent of the operating system. Which of the following is the most cost-effective solution?()
第5题:
You are speaking to an IT manager with 350 small servers. The IT manager is looking to reduce and consolidate systems. What strategy would you follow?()
第6题:
Companycom is using shared processor LPARs exclusively, including the Virtual IO Server. The users are complaining about response time. The application LPARs can be heavy processor users. The Virtual IO Server has been measured to be processor constrained. How should the Virtual IO Server's shared processor LPAR be configured?()
第7题:
You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). Server1 runs a custom application. Users report that the performance of Server1 has decreased significantly during the last 30 minutes. You need to identify the current processor and memory usage for each process running on Server1. Which tool should you use? ()
第8题:
8-way logical CPU partition, where each logical CPU has the power of 25% of a logical processor
4-way logical CPU partition, where each logical CPU has the power of 50% of a physical processor
8-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor
16-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor
第9题:
Create capped partitions for the database servers.
Create workload partitions for the database servers.
Create a separate shared processor pool for the database servers.
Create virtual processors equal to the entitlement for database servers.
第10题:
The socket size does not match
The cache is from a different manufacturer
The processors do not match
Processors cannot be upgraded after server has been deployed
第11题:
Order a POWER5 HMC
Connect to the existing HMC
Install an 8-port asynchronous card in the managed server to connect to the existing HMC
Install an additional network card to the existing HMC and connect to the POWER5 service processor
第12题:
Dual processing
Multi-processing
Multi-tasking
Multi-threading
第13题:
A technician is building a Windows 2008 server and has installed a motherboard, processor, and power supply. Which of the following optical drives should the technician install?()
第14题:
An SNMP alert has been generated by a server in the main data center.The alert stated that the internal temperature of the server has exceeded the threshold.No other servers in the rack have experienced problems,and no other alerts have come from that server about any other events.Which of the following is the cause of this issue?()
第15题:
Companycom has purchased a p5 590 with 16 CPUs. To run Simultaneous Multi-Threading (SMT) with a 4-way virtual processor partition with 2.0 processing units of entitlement, how many logical CPUs will be allocated?()
第16题:
Company.com has purchased a 2-way p5-520 and would like to create three Micro-Partitions on the server. Which feature of Advanced POWER Virtualization would allow them to create the desired number of partitions?()
第17题:
ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical specialist perform to set the service processor network address for a static IP?()
第18题:
A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window. Which solution addresses this problem without requiring additional hardware?()
第19题:
You manage a member server that runs Windows Server 2008. The server has the Terminal Services role installed. Microsoft Windows System Resource Manager (WSRM) is installed on the server. Users report performance degradation on the Terminal Server. You monitor the server and notice that one user is consuming 100 percent of the processor time. You create a resource-allocation policy named Policy1 that limits each user to 30 percent of the total processor time. You observe no performance improvement. You need to configure WSRM to enforce Policy1. What should you do?()
第20题:
Dual processing
Multi-processing
Multi-tasking
Multi-threading
第21题:
Rack cooling equipment failure
Dust collection in the server
Server processor failure
Server power supply failure
第22题:
The processor is hitting 100% utilization.
The server is having memory errors.
The server fans have failed.
The processors are of two different stepping levels.
There is no thermal protection between the processor and the heat sink.
第23题:
Flash Drive
DVD-RW
CD-ROM
SSD