A technician needs to install an additional PCI NIC without powering down the server. Which of the following BEST describes the technology the board must support?()
第1题:
A customer is evaluating PowerVM capabilities for dynamically allocating resources without rebooting LPARs. Which features of PowerVM support the customer requirement?()
第2题:
A technician has installed an additional NIC on a server. Which of the following can now be set up?()
第3题:
A technician needs to find an end of a network cable drop. Which of the following tools would the technician use?()
第4题:
Which of the following will allow devices to be added without turning the server off?()
第5题:
A technician temporarily needs an additional network connection in their office to test a newworkstation. Which of the following is the BEST solution to add a temporary network connection?()
第6题:
Which of the following commands can be used to prepare a system to physically insert a PCI hot plug adapter()
第7题:
Which of the following commands can be used to identify all PCI hot plug slots on a server and their characteristics?()
第8题:
A server has two PCI-X buses with four Active PCI-X slots. Slots 1 and 2 are on the first PCI-X bus (100MHz) and slots 3 and 4 are on the second PCI-X bus (133MHz). The customer requires you to install adapter A and adapter B on day one. After the server has been installed and configured, the server must be running 24 by 7 with no downtime. Three months later, adapter C needs to be hot added. All the adapters are 64-bit and capable of speeds up to 133MHz. The customer’s priority is to have no downtime, and performance is secondary. Based on the information provided, into which slots should adapters A and B be installed in and later into which slot would adapter C be hot-added?()
第9题:
CoD and PCI hot-plug
DLPAR and Active Memory Sharing
Hot node add and hot node repair
D.ynamic processor failure and processor instruction retry
第10题:
drslot
Isslot
Isattr
prtconf
第11题:
Hot install
Hot add
Plug and play
Hot plug
第12题:
USB
AGP
PCI
IDE
PS2
第13题:
After a server inspection, an administrator notices a single drive failure on a server configured with RAID 5. Which of the following is the NEXT step to start rebuilding the array?()
第14题:
Which of the following is a reason why Bob, a technician, should install case fans in the front of acomputer case?()
第15题:
An administrator needs to add fault tolerance capabilities to a server. Which of the following is the BEST solution to accomplish this?()
第16题:
Which of the following ports supports hot plug devices? ()
第17题:
Which of the following command can be used to identify all PCI hot plug slots on a server and their characteristics()
第18题:
One of your best customers has limited funding and is interested in the ability to increase a system’s computing power as needed. Which of the following System x server attributes should the Sales Specialist promote?()
第19题:
Which of the following commands can be used to get the system ready to physically insert a PCI hot plug adaptor?()
第20题:
The technician plugged a USB 2.0 device into a USB 1.1 port.
The technician needs to reboot the computer for the device to work.
The technician plugged a USB 1.1 device into a USB 2.0 port.
The front panel connectors are not plugged into the motherboard.
第21题:
Check the backplane cabling.
Check the server BIOS.
Update the RAID controller firmware.
Install the latest hard drive firmware
第22题:
Deallocate rootvg mirror
Use hot replace manager
Break rootvg mirror
Deallocate LPs from failed disk
第23题:
Plug and Play
Warm site
Hot plug
Hot site