更多“Which of the following must be configured on printers so that the server can properly monitor details on page counts?()A、WMIB、DHCPC、SNMPD、MIB”相关问题
  • 第1题:

    After a server has been installed into a rack, an administrator must ensure which of the following?()

    A. Warm air flow is permitted through the front bezel

    B. The system is labeled so that it can be identified

    C. Verify the change control process can be implemented

    D. Determine the correct power requirements


    参考答案:B

  • 第2题:

    Which of the following is TRUE about a caching name server?()

    • A、They must have a trusted SSL certificate
    • B、They can be authoritative
    • C、They cannot be load-balanced
    • D、They can be recursive
    • E、They require DHCP

    正确答案:B,D

  • 第3题:

    Which of the following must be configured on printers so that the server can properly monitor detailson page counts?()

    • A、 WMI
    • B、 DHCP
    • C、 SNMP
    • D、 MIB

    正确答案:C

  • 第4题:

    Which of the following protocols can be found at the application layer?()

    • A、Telnet
    • B、TCP
    • C、SNMP
    • D、UDP

    正确答案:A

  • 第5题:

    After a server has been installed into a rack, an administrator must ensure which of the following?()

    • A、Warm air flow is permitted through the front bezel
    • B、The system is labeled so that it can be identified
    • C、Verify the change control process can be implemented
    • D、Determine the correct power requirements

    正确答案:B

  • 第6题:

    Which of the following server types performs the same function as the HOSTS file?()

    • A、 FTP
    • B、 DHCP
    • C、 DNS
    • D、 WINS

    正确答案:C

  • 第7题:

    Which of the following tools can an administrator use to get a server baseline?()

    • A、System Resource Monitor
    • B、Microsoft Baseline Security Analyzer (MBSA)
    • C、Replication Monitor
    • D、Performance Monitor

    正确答案:D

  • 第8题:

    Prior to implementing an LPAR system, which of the following needs to be done?()

    • A、A graphics monitor must be attached to the server
    • B、Cluster System Management (CSM) software must be installed
    • C、The LPAR system must have an Hardware Management Console (HMC) connected
    • D、Each LPAR must be configured with a CDROM for operating system installation

    正确答案:C

  • 第9题:

    You are the network administrator for your company. The network contains 12 Windows Server 2003 computers and 300 Windows XP Professional computers. Three servers named Server4, Server5, and Server6 run a critical business application. When performing performance baselining on these three servers, you notice that Server6 has a larger number of concurrently connected users at any given moment than Server4 or Server5. The additional workload is causing performance problems on Server6. You need to identify which client computers are connecting to Server6.You plan to run Network Monitor on Server6 to capture all packets sent to Server6. The capture task must be configured to meet the following requirements.To reduce the size of the captured data, you want to capture only the packet headers.If a large number of packets are captured, the packets must be retained on the server. Captured packets must not overwrite previously captured packets.   Which two tasks should you perform to configure Network Monitor?()

    • A、Configure the Network Monitor display filters.
    • B、Configure the Network Monitor capture filters.
    • C、Increase the Network Monitor buffer size setting.
    • D、Decrease the Network Monitor buffer size setting.
    • E、Increase the Network Monitor frame size setting.
    • F、Decrease the Network Monitor frame size setting.

    正确答案:C,F

  • 第10题:

    单选题
    Which of the following must be configured on printers so that the server can properly monitor details on page counts?()
    A

    WMI

    B

    DHCP

    C

    SNMP

    D

    MIB


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    After a server has been installed into a rack, an administrator must ensure which of the following?()
    A

    Warm air flow is permitted through the front bezel

    B

    The system is labeled so that it can be identified

    C

    Verify the change control process can be implemented

    D

    Determine the correct power requirements


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    An administrator has purchased monitoring software that can be configured to send alerts when hardware and applications are having issues.  Which of the following must be installed on the monitoring server so that it can properly monitor details on vendor specific devices?()
    A

     MIBs

    B

     SMTP

    C

     WMI

    D

     DHCP


    正确答案: C
    解析: 暂无解析

  • 第13题:

    Which of the following is not an essential prerequisite for AutoQoS to be correctly applied to aninterface? (Choose all that apply.)()

    • A、The interface must be configured as a Multilink PPP interface
    • B、The correct bandwidth should be configured on the interface
    • C、A QoS policy must not be currently attached to the interface
    • D、CEF must be enabled
    • E、AutoQoS must be enabled globally before it can be enabled on the interface
    • F、An IP address must be configured on the interface if its speed is equal to or less than 768 kbps

    正确答案:A,E

  • 第14题:

    Which of the following must be done to properly conduct testing of the data backup portion of a disaster recovery plan?()

    • A、 Perform an integrity test of backup media.
    • B、 Verify data on backup media can be read.
    • C、 Verify that backups have occurred and were successful via the logs.
    • D、 Restore backed up data to a test server.

    正确答案:D

  • 第15题:

    Your company wants Server 1/eth0 (vNIC 1) configured so that it always uses Fabric Interconnect A Port Channel 1 (Po1) when it communicates with anything outside of the Cisco UCS domain. However, if vNIC 1 fails over to Fabric Interconnect B using fabric failover, then vNIC 1 can any uplink port on Fabric Interconnect B. Which statements are true? ()

    • A、 The fabric interconnects must be in end-host mode.
    • B、 A pin group must be configured on the server tab in Cisco UCS Manager.
    • C、 In the service profile for Server 1, vNIC 1 must be explicitly assigned to a pin group.
    • D、 Server 1 cannot be configured to meet the requirement. A server can only be manually pinned to a single physical interface and not a port channel because of the LACP load-balancing algorithm.
    • E、 Server 1 cannot be configured to meet the requirement. A server is either manually pinned to an uplink on both fabric interconnects or the server is automatically pinned, but not both.

    正确答案:A,C

  • 第16题:

    An administrator is configuring one server to monitor hardware level information on a second Windows server.Which of the following should be setup on the Windows server to allow the monitoring server to access this information?()

    • A、WMI
    • B、RIS
    • C、DNS
    • D、SNMP
    • E、SMTP

    正确答案:A,D

  • 第17题:

    An administrator has purchased monitoring software that can be configured to send alerts when hardware and applications are having issues.  Which of the following must be installed on the monitoring server so that it can properly monitor details on vendor specific devices?()

    • A、 MIBs
    • B、 SMTP
    • C、 WMI
    • D、 DHCP

    正确答案:A

  • 第18题:

    必须在打印机上进行以下哪项配置,以便服务器正确监控页面计数详情?()

    • A、WMI
    • B、DHCP
    • C、SNMP
    • D、MIB

    正确答案:C

  • 第19题:

    Which of the following server types will assign a unique address to the client’s machines?()

    • A、WINS
    • B、DHCP
    • C、NTP
    • D、DNS

    正确答案:B

  • 第20题:

    The WebSphere Application Server provides a Dynamic Cache Monitor.  Which of the following can be monitored using this tool?()

    • A、Servlet Response Times
    • B、Cache Statistics
    • C、Database Connection Pool Statistics
    • D、Disk Statistics

    正确答案:B,D

  • 第21题:

    单选题
    Prior to implementing an LPAR system, which of the following needs to be done?()
    A

    A graphics monitor must be attached to the server

    B

    Cluster System Management (CSM) software must be installed

    C

    The LPAR system must have an Hardware Management Console (HMC) connected

    D

    Each LPAR must be configured with a CDROM for operating system installation


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    Which of the following must be configured on printers so that the server can properly monitor detailson page counts?()
    A

     WMI

    B

     DHCP

    C

     SNMP

    D

     MIB


    正确答案: C
    解析: 暂无解析

  • 第23题:

    多选题
    Which of the following is not an essential prerequisite for AutoQoS to be correctly applied to aninterface? (Choose all that apply.)()
    A

    The interface must be configured as a Multilink PPP interface

    B

    The correct bandwidth should be configured on the interface

    C

    A QoS policy must not be currently attached to the interface

    D

    CEF must be enabled

    E

    AutoQoS must be enabled globally before it can be enabled on the interface

    F

    An IP address must be configured on the interface if its speed is equal to or less than 768 kbps


    正确答案: A,E
    解析: 暂无解析