An AIX LPAR has been reconfigured to use direct-attached disks. What is the best way to fully remove and delete the Virtual IO volumes?()A、On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi#B、On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_nameC、On

题目

An AIX LPAR has been reconfigured to use direct-attached disks. What is the best way to fully remove and delete the Virtual IO volumes?()

  • A、On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi#
  • B、On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_name
  • C、On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi# On the VIO Server: rmdev -dev  rootvg_disk, rmlv rootlv_name
  • D、On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_name On the AIX LPAR: rmdev -dl  hdisk#, rmdev -dl vscsi#

相似考题
更多“An AIX LPAR ha”相关问题
  • 第1题:

    Which of the following versions of AIX provide both multi-path I/O and dynamic LPAR?()

    • A、AIX V5.2
    • B、AIX V4.2
    • C、AIX V4.3
    • D、AIX V5.1

    正确答案:A

  • 第2题:

    A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()

    • A、Dual power supplies.
    • B、Twice the amount of disk.
    • C、Two dual-port LHEA adapters.
    • D、Two dual-port fibre channel adapters.

    正确答案:A

  • 第3题:

    A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()

    • A、A CD or DVD with installation media
    • B、An internal SCSI adapter in the target LPAR
    • C、An Ethernet adapter for access to an FTP server
    • D、Advanced Power Virtualization feature of the p5 590

    正确答案:A

  • 第4题:

    Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()

    • A、VIO Server
    • B、AIX 5.2 ML4
    • C、Shared Ethernet Adapter
    • D、AIX 5.3 with Advanced Power Virtualization

    正确答案:D

  • 第5题:

    A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS.  Which of the following must be completed prior to this migration ()

    • A、Upgrade system firmware to latest level
    • B、Upgrade to AIX 5.3
    • C、Upgrade HMC to version 6.1
    • D、Convert rootvg filesystems to JFS2

    正确答案:B

  • 第6题:

    Company.com has a 2 processor license for SLES 9 and a 2 processor license for AIX V5.3. Which of the following LPAR configurations is valid on a 4-way p5-550?()

    • A、SLES9:2 dedicated processors AIX: 2.0 processing units,4 virtual processors,uncapped
    • B、SLES9:2.0 processing units,2 virtual processors,uncapped AIX:2.0 processing units,4 virtual processors,capped
    • C、SLES9:2.0 processing units,3 virtual processors,uncapped AIX:2 dedicated processors SLES9:2.5 processing units,3 virtual processors,capped
    • D、AIX:1.5 processing units,2 virtual processors,capped

    正确答案:B

  • 第7题:

    单选题
    Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()
    A

    Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS

    B

    Use DLPAR to move resources from the test LPAR to training when training is active

    C

    Install Partition Load Manager to share resources between the test and training environments

    D

    Install Advanced Power Virtualization and then use micro-partitioning for both the test and  training LPARs


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    Companycom has the following: 8 x 1.65GHz CPUs 16GB Memory 4 LPARs LPAR 1: Test/Dev 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 2: QA 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 3: Prod 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 4: Web App 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, SUSE Linux Utilization over a 30 day period LPAR 1: Average utilization was 15%, Peak utilization was 100% LPAR 2: Average utilization was 25%, Peak utilization was 100% LPAR 3: Average utilization was 50%, Peak utilization was 90% LPAR 4: Average utilization was 35%, Peak utilization was 100% If the customer has a requirement for all four LPARs moved to a p5 590 and to have dedicated CPU resources. Which of the following would best describe the profile requirements?()
    A

    LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0 

    B

    LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 2.0, max CPU 3.0, desired CPU 3.0 

    C

    LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 3.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0 

    D

    LPARs 1 and 2, SMT off, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT off, min CPU 1.0, max CPU 3.0, desired CPU 3.0


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX 6.1?()
    A

    128M

    B

    256M

    C

    512M

    D

    1024M


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX6.1()?
    A

    128 MB

    B

    256 MB

    C

    512 MB

    D

    1024 MB


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    Which of the following versions of AIX provide both multi-path I/O and dynamic LPAR?()
    A

    AIX V5.2

    B

    AIX V4.2

    C

    AIX V4.3

    D

    AIX V5.1


    正确答案: A
    解析: 暂无解析

  • 第12题:

    A hospital customer with an experienced AIX and Microsoft Windows staff wants to consolidate all of their file/print services onto fewer systems.  They currently use multiple Microsoft Windows-based Intelsystems that are experiencing reliability problems.  They also have POWER4+ systems that are running multiple AIX LPARs that have experienced no reliability issues. They need at least 99.99% uptime. Which solution will meet their uptime needs at the lowest cost?()

    • A、Combine the file/print servers onto a larger Intel-based machine (x445).
    • B、Bring up a Linux LPAR on the pSeries and run Samba to provide file/print services.
    • C、Bring up another AIX LPAR on the pSeries and run Samba to provide file/print services.
    • D、Bring up another AIX LPAR on the pSeries and run Connect Direct to provide file/print services.

    正确答案:C

  • 第13题:

    Company.com would like to configure a virtual Ethernet between an AIX V5.3 LPAR and an AIX V5.2 LPAR. Which of the following options is necessary to complete this task?()

    • A、Remove the physical Ethernet adapters from the LPARs
    • B、Activate Advanced POWER Virtualization
    • C、Update microcode for the virtual adapters
    • D、Upgrade AIX V5.2 LPAR to AIX V5.3

    正确答案:D

  • 第14题:

    Companycom has a Linux LPAR on a p5 570 server. The 3rd party storage subsystem devices are not supported by Linux. How would access be provided to the storage subsystem devices for this Linux LPAR?()

    • A、Daisy chain the unsupported 3rd party storage subsystem devices with the local SCSI disk drive 
    • B、Assuming the 3rd party storage subsystem has AIX support, enable access through a Virtual IO Server 
    • C、Assuming the 3rd party storage subsystem has AIX support, implement the Linux partition within an AIX partition 
    • D、3rd party storage is not an option for p5 570 servers and therefore only IBM disk subsystems can be considered as a solution

    正确答案:B

  • 第15题:

    A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()

    • A、In the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.
    • B、In the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.
    • C、In the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.
    • D、In the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.

    正确答案:C

  • 第16题:

    Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()

    • A、Assign the adapter to an IO Hosting partition
    • B、Use AIX 5L affinity to move the application from SUSE to AIX
    • C、Use AIX 5.3 drivers to install the adapter in the Linux LPAR
    • D、Assign the adapter to an AIX 5.3 partition running Linux Affinity

    正确答案:A

  • 第17题:

    单选题
    A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()
    A

    A CD or DVD with installation media

    B

    An internal SCSI adapter in the target LPAR

    C

    An Ethernet adapter for access to an FTP server

    D

    Advanced Power Virtualization feature of the p5 590


    正确答案: B
    解析: 暂无解析

  • 第18题:

    单选题
    A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()
    A

    In the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.

    B

    In the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.

    C

    In the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.

    D

    In the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.


    正确答案: C
    解析: 暂无解析

  • 第19题:

    单选题
    What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX6.1?()
    A

    128MB

    B

    256MB

    C

    512MB

    D

    1024MB


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()
    A

    One single port Ethernet adapter

    B

    Four dual port Ethernet adapters

    C

    Two single port Ethernet adapters

    D

    Eight single port Ethernet adapters


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    An AIX LPAR has been reconfigured to use direct-attached disks. What is the best way to fully remove and delete the Virtual IO volumes?()
    A

    On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi#

    B

    On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_name

    C

    On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi# On the VIO Server: rmdev -dev  rootvg_disk, rmlv rootlv_name

    D

    On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_name On the AIX LPAR: rmdev -dl  hdisk#, rmdev -dl vscsi#


    正确答案: A
    解析: 暂无解析