A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A、 vmstat and iostat data from the older ma

题目

A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()

  • A、 vmstat and iostat data from the older machines 
  • B、 The number of CPUs that were installed in the original machines 
  • C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) 
  • D、 Performance data that is collected from the new system after it has been put into production

相似考题
更多“A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A、 vmstat and iostat data from the older ma”相关问题
  • 第1题:

    The term computer describes a device made up of a combination of electronic components.By itself, a computer has no ( 1) and is referred to as hardware, which means simply the physical equipment. The hardware can't be used until it is connected to other elements, all of which constitute the six parts of a computer-based information system,hardware,software,data/information, people, procedures and communications.
    A system is defined as a collection of related components that ( 72) to perform a task in order to accomplish a goal. Any organization that uses information technology will have a computer-based information system to provide managers (and various categories of employees with the appropriate kind of information to help them make decisions.
    Systems analysis and design is to ascertain how a system works and then take steps to make it (73 ) Often, a system approach is used to define, describe, and solve a problem or to meet a(an)( 74)
    From time to time, organizations need to (75 ) their information systems, in, response to new marketing' opportunities, modified government regulations, the introduction .of new technology, merger with another company, or other developments. When change is needed, the time is ripe for applying the principles of systems analysis and design.

    (1)应选( )。




    A. information
    B. software
    C. intelligence
    D. Data

    答案:C
    解析:
    翻译:

    计算机这个术语描述由电子的和机电的部件组合而成的一种设备。计算机本身没有只能,因此称为硬件,仅仅是物理设备。硬件只有和其他要素连接才能使用,所有这些要素即为构成基于计算机信息系统的六要素:硬件、软件、数据/信息、人、操作程序和通信。
    系统定义为一组相关组件的集合,这些组件相互交互以完成一个任务,以实现一个目标。任何使用信息技术的组织会拥有一个基于计算机的信息系统,给管理人员(和各类员工)提供适当类型的信息以帮助他们做出决策。

    系统分析和设计是确定系统如何工作然后经过一系列步骤以使其更好。通常,采用系统方法来定义、描述和解决一个问题或满足一个目标。

    随着时间推移,新的市场机会、政府规定的变化、新技术的出现、公司兼并以及其他方面的发展等,使得组织需要改变其信息系统。当需要改变时,应用系统分析与设计的时机已经成熟。

  • 第2题:

    A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()

    • A、 PowerVM Lx86
    • B、 PowerVM Express Edition
    • C、 PowerVM Standard Edition
    • D、 PowerVM Enterprise Edition

    正确答案:C

  • 第3题:

    A customer has ten RS/6000 Model M80, two pSeries 690 Model 681, five POWER5 510 and two POWER6 560 machines installed and running commercial applications. They want to do a server consolidation study in order to replace the existing systems with POWER7 systems. What performance metric is recommended when evaluating the replacement system?()

    • A、IBM CPW
    • B、IBM rPerf
    • C、SPECint_rate2006
    • D、IDEAS International RPE2

    正确答案:B

  • 第4题:

    A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()

    • A、e-Config
    • B、System Planning Tool (SPT)
    • C、IBM Workload Estimator (WLE)
    • D、IBM Performance Monitor (PM)

    正确答案:B

  • 第5题:

    A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()

    • A、Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAs
    • B、Move the existing physical network and storage adapters to the new system and virtualize the I/O using a  single VIO Server.
    • C、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC  connectors and dual HBAs.
    • D、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC  connectors and the other with dual HBAs.

    正确答案:C

  • 第6题:

    A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()

    • A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later
    • B、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC
    • C、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one
    • D、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

    正确答案:A

  • 第7题:

    A customer has a new Power 720 with PowerVM Standard Edition.  They plan to migrate their single-partition POWER5 550 to the new Power 720.   How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()

    • A、Perform Live Partition Mobility between the two systems.
    • B、Move the boot disks from the old system to the new system.
    • C、Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.
    • D、Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.

    正确答案:D

  • 第8题:

    A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system.  How might the pSeries technical specialist aid the customer in addressing their concern?()

    • A、Direct the customer to the Installation Guide for each system to identify the power requirements.
    • B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.
    • C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.
    • D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.

    正确答案:C

  • 第9题:

    A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()

    • A、A desk, as it not rack mountable
    • B、Ethernet connections to the POWER5 systems
    • C、Serial connections to the POWER5 systems
    • D、USB connections for the keyboard and mouse

    正确答案:B

  • 第10题:

    单选题
    A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()
    A

    e-Config

    B

    System Planning Tool (SPT)

    C

    IBM Workload Estimator (WLE)

    D

    IBM Performance Monitor (PM)


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()
    A

     PowerVM Lx86

    B

     PowerVM Express Edition

    C

     PowerVM Standard Edition

    D

     PowerVM Enterprise Edition


    正确答案: B
    解析: 暂无解析

  • 第12题:

    Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations. Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()

    • A、IBMeConfig
    • B、IBM Performance Monitor
    • C、IBM Workload Estimator (WLE)
    • D、IBM System Planning Tool (SPT)

    正确答案:D

  • 第13题:

    The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1.  They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server.   How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?()

    • A、Run amepat now on all of the existing LPARs.
    • B、Run amepat after consolidation on all LPARs.
    • C、Run amepat now on all existing LPARs running on the POWER6 servers.
    • D、Run amepat now on all existing LPARs running database applications.

    正确答案:A

  • 第14题:

    A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory.  The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2.  They will have a short outage window to perform the data migration.  What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()

    • A、Use rsync to synchronize the data across servers.
    • B、Use exportvg and importvg to move the data to the target system.
    • C、Use NFS to copy the data from the source system to the target system.
    • D、Backup the data from the source system and restore to the target system.

    正确答案:B

  • 第15题:

    Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()

    • A、POWER5 runs in an SMP mode as default
    • B、POWER5 can run in a full system mode the same as the p690
    • C、POWER5 can run in full system mode with the purchase of PLM
    • D、POWER5 can run in a full system mode, but it is in LPAR mode

    正确答案:D

  • 第16题:

    Companycom is considering a large partitioned p5 590 to consolidate several smaller systems in their data center. Due to the complexity of the consolidation, the customer is asking the technical support specialist to give them a report which shows pre order PCI adapter placement and validates them against IBM's recommendations. The concern is that the factory will not install the adapters in the appropriate slots as the customer pre-selected. What IBM tool is available to provide this?()

    • A、LPAR Validation Tool (LVT)
    • B、Personal Systems Configurator (PSC)
    • C、IBM Configuration for eBusiness (eConfig)
    • D、Advanced System Management Interface (ASMI)

    正确答案:A

  • 第17题:

    A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility.  Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()

    • A、 PowerVM Standard Edition on POWER6 hardware
    • B、 PowerVM Standard Edition with POWER5 hardware 
    • C、 PowerVM Enterprise Edition with POWER6 hardware
    • D、 PowerVM Enterprise Edition with POWER5 hardware

    正确答案:C

  • 第18题:

    A customer is getting ready to install a new pSeries system into their data center.  They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance.  What reference material should the pSeries technical specialist provide to the customer?()

    • A、Sales Manual
    • B、Announcement Letter
    • C、Site and Hardware Planning Information
    • D、Adapter, Devices, and Cable Information for Multiple Bus Systems

    正确答案:C

  • 第19题:

    The customer has an older storage array and is looking to migrate data that currently exists onover 100 73 GB FC drives to a new IBM System Storage DS5020. The customer states that theyhave only 3 TB of data and wants to consolidate on to fewer higher capacity drives. There are sixapplication servers running multiple applications and operating systems utilizing the storagesystem. What would be the next step to accurately identify the new storage configuration?()

    • A、initiate a Disk Magic study
    • B、initiate a Capacity Magic study
    • C、runiometer on the current environment
    • D、utilize the IBM Disk capacity planner toolkit

    正确答案:A

  • 第20题:

    A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()

    • A、Explain to the customer that they need an additional HMC for the POWER5 system.
    • B、Obtain a PO from the customer to purchase additional serial connections to the HMC.
    • C、Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.
    • D、Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

    正确答案:A

  • 第21题:

    单选题
    A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
    A

     vmstat and iostat data from the older machines 

    B

     The number of CPUs that were installed in the original machines 

    C

     Data from Workload Estimator (WLE) and IBM Performance Management (PM) 

    D

     Performance data that is collected from the new system after it has been put into production


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()
    A

    A desk, as it not rack mountable

    B

    Ethernet connections to the POWER5 systems

    C

    Serial connections to the POWER5 systems

    D

    USB connections for the keyboard and mouse


    正确答案: A
    解析: 暂无解析