A customer requests a solution that will enhance the availability of their servers and ensure that the time needed to recover from an Operating System fault is at a minimum. What solution do you recommend? ()
第1题:
A frustrated and angry customer calls in with a system that does not work. Which of the following is the FIRST course of action for a technician to take?()
第2题:
A customer is interested in obtaining an AIX solution from IBM. They have two primary global requirements: ? Availability (although HACMP is not required) ? Low cost Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()
第3题:
You work as the exchange administrator at TestKing.com. The TestKing.com network contains an Exchange Server 2010 Organization. TestKing.com makes use of Microsoft Exchange Server messagingsolution. During the course of day you receive an instruction from the CIO to deploy two mailbox servers that willbe members of the database availability group (DAG). You are instructed to recommend a hard disk configuration for the deployed servers. However, you need to ensure that write performance is reduces aswell as stopping a switchover in the event of a single disk failure. What should you do?()
第4题:
You deploy a mobile messaging solution with Microsoft Exchange Server 2003 Service Pack 2. When the application is running, it must not be able to access protected registry keys. You need to ensure that the application meets the outlined requirement. What are two possible ways to achieve this goal?()
第5题:
You have an Exchange Server 2010 organization. The network contains two Mailbox servers that are configured in a database availability group (DAG). You plan to implement a disaster recovery solution. You need to recommend a solution that ensures that the active mailbox database copy is unaffected bythe backup process. You want to achieve this goal while minimizing costs. What should you recommend?()
第6题:
You need to recommend a solution for starting the servers in the San Francisco office from Windows Recovery Environment (Windows RE). The solution must meet the company’s security requirements. What should you include in the recommendation?()
第7题:
You work as the exchange administrator at TestKing.com. The TestKing.com network contains an Exchange Server 2010 Organization. The organization consists of 40 servers is configured to run Exchange Server 2010. A new TestKing.com security policy requires that approved server patches of Exchange and Windows aswell as security updates be applied to servers within seven days of it being released. During the course of day you receive an instruction from management to: * Ensure that only approved patches and security updates are installed. * Ensure that only administrators are allowed to approve patches and security updates manually. * Ensure that the deployment casts is reduced. * Ensure that the administrative effort of deploying patched is reduced. You are instructed to recommend a solution that will comply with the set criteria. What should you do?()
第8题:
You have a computer that runs Windows 7. You add a new hard disk drive to the computer and create anew NTFS partition. You need to ensure that you can use the Previous Versions feature on the new drive. What should you do?()
第9题:
a standalone Distributed File System (DFS) namespace and DFS Replication
a domain-based Distributed File System (DFS) namespace and DFS Replication
Failover Clustering and Clustered Shared Volumes
Network Load Balancing (NLB) and Storage Manager
第10题:
Request an extension because 48 hours will not be enough time to propose an appropriate solution.
Ask the customer for a call to learn more about their needs and respond to their request with a complete solution.
Use the configuration guide or spreadsheet configurator to assemble server configurations that meet the specification, and then look for the lowest price.
Contact the IBM Client Representative for this account and ask for assistance in setting up a meeting with the technical decision maker of the prospective customer.
第11题:
Design the least-cost solution to prevent the competition from winning the business.
Design a disaster recovery (DR) solution and convince the customer why DR is important to their business.
Use the HACMP specialist to design the solution and include HA SmoothStart services as part of the proposal.
Design a solution with redundant parts and explain to the customer the incremental cost associated with the redundancy.
第12题:
You should recommend that Microsoft System Center Configuration Manager be included in your solution.
You should recommend that Windows Update be included in your solution.
You should recommend that Windows Server Update Services be included in your solution.
You should recommend that Microsoft Update be included in your solution.
第13题:
A customer had been given a proposal for a p5-570 6-way 32GB system running in Full Partition mode. After review, the customer asked that the configuration be modified to enhance the reliability and availability of the solution. However, the customer does not want to pay for HACMP or additional machines. What change would be most likely to improve the reliability of the solution?()
第14题:
Your BladeCenter customer operates multiple geographically dispersed datacenters and needs resilient remote access to servers. What is the most cost-effective solution listed below?()
第15题:
You need to recommend a solution for monitoring the servers. The solution must meet the company’s technical requirements What should you include in the recommendation?()
第16题:
You need to design security changes that provide maximum protection for customer data and courier assignments.What should you do?()
第17题:
You need to design a remote administration solution for servers on the internal network. Your solution must meet business and security requirements. What should you do?()
第18题:
You have an Exchange Server 2010 Mailbox server.The server is a member of a database availability group (DAG).The server fails.You install the operating system on a new server and use the same computer name.You join the server to the domain.You need to reinstall Exchange Server 2010 on the server.The solution must ensure that previous Exchange server configurations are applied to the new server.What should you do?()
第19题:
You work as the exchange administrator at TestKing.com. The TestKing.com network contains anExchange Server 2010 Organization. The Active Directory Rights Management Services (AD RMS) isinstalled within the organization. You receive an instruction from the CIO to recommend a messaging security solution that will make surethat a disclaimer is applied to all e-mail messages and that all e-mail messages from the Financedepartment is unable to be printed. What should you do?()
第20题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第21题:
Create snapshots of the VMs from Hyper-V Manager
Create full backups of the Hyper-V host by using Windows Server Backup
Create full backups of the VMs by using Windows Server Backup from within the VMs
Create full backups of the Hyper-V host by using Microsoft System Center Data Protection manager
第22题:
Use RAID protection and add more memory
Install Operating System in RAID 0 (Parity) Disk Configuration
Install Operating System in RAID 5 Disk Configuration
Use RAID protection and ensure systems are backed-up daily
第23题:
You should recommend that Secure/Multipurpose Internet Mail Extensions (S/MIME) be included in the system.
You should recommend that Transport Protection Rules be included in the system.
You should recommend that Retention policies be included in the system.
You should recommend that Journal Report Decryption be included in the system.