A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()
第1题:
Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined. The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()
第2题:
A customer has requested a proposal for a p5-520 with AIX 5.2 and Sysback. There are no plans to run LPARs or Micro-Partitions on the p5-520 in the near future. The customer has asked the pSeries technical specialist to recommend anything else that may be needed. Which of the following should be recommended in this situation?()
第3题:
A financial industry customer will consolidate their Intel-based servers to a p5-550 running AIX, and needs experienced technical services. What information should the account executive provide to the customer to assure them that the technical specialist has the required experience?()
第4题:
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()
第5题:
A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()
第6题:
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()
第7题:
A pSeries technical specialist has completed a server consolidation study of a customer’s environment. An LPAR worksheet was produced, which details the resource (CPU, memory, disk, adapters) requirements for each OS image (partition) based on workload. What is the most appropriate next step?()
第8题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第9题:
The technical support specialist has completed a UNIX course at college.
The technical specialist has supported several similar projects and has earned an IBM AIX certification.
The technical support specialist’s company sells $3M of UNIX computer systems every year.
The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
第10题:
The technical specialist has supported multiple Cluster 1350 environments. References will be provided.
The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.
The technical specialist has worked on multiple UNIX consolidation projects. References will be provided.
The technical specialist has worked on Linux consolidation efforts. References will be provided.
第11题:
ATScon Monitor
Technical and Delivery Assessment
System Storage Interoperations Center
Standalone Solutions Configuration Tool
第12题:
A solution sizing questionnaire
Verify the customer has the proper racks
A Technical Delivery Assessment
Verify the customer has enough cooling in the computer room
第13题:
A university researcher needs a large server with high numeric computing capacity to do computational fluid dynamics calculations. The pSeries technical specialist has a recent pSeries and RS/6000 Performance Report. Which of the following tables should be consulted to advise the customer concerning relative performance of various models?()
第14题:
A frustrated and angry customer calls in with a system that does not work. Which of the following is the FIRST course of action for a technician to take?()
第15题:
A customer has requested the most cost-effective p5 solution allowing for growth. Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()
第16题:
A customer has two locations that host their pSeries servers. Traffic is being routed through the public Internet. The customer needs to exchange confidential financial data between the servers. Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()
第17题:
A customer is ready to order a pSeries solution. However, the pSeries technical specialist is unsure whether the customer preferred the fibre channel or the external SCSI disk attachment option. What is the most appropriate action for the specialist to take next?()
第18题:
The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed. The specialist discovers that the customer has never updated their VPD. Which of the following HMC applications is used to gather the current VPD information?()
第19题:
The sales team has brought in the pSeries technical specialist to recommend the best solution to win the business. The customer wants the lowest purchase cost four-disk solution using an external I/O solution. Which of the following offerings provides the required base function at the lowest cost?()
第20题:
2104
ESS800
FAStT600
SSA 7133
第21题:
A
B
C
D
第22题:
A DCE domain
A Kerberos domain
A PPP tunnel between the servers
An IPSEC tunnel between the servers
第23题:
The customer used their IBM Customer Number
The customer has activated their base warranty
The customer purchased Remote Technical Support Servicepac
The customer escalated the issue to the Duty Manager