During a review of environmental requirements before ordering an IBM System z9 server and IBM System Storage DS8700, the customer states that the available power is 220 volts AC. Which feature should be included with the DS8700 order()
第1题:
111 The review for the specification completeness is performed during which of the following cycles. A. Award cycles
B. requirements cycle
C. requisition cycle
D. solicitation cycle
E. contractual cycle
第2题:
The most basic reason why dialects should be preserved is that language helps to ______ a culture
A) retain B) relate C) remark D) review
答案:A
参考译文:方言之所以应该被保留的最根本原因是语言有助于留住文化。
题目分析:本题题干的结构比较复杂,含有两个从句,其中why dialects should be preserved 为定语从句,其先行词为reason,that language helps to retain a culture为宾语从句.注意向本题题干中的这种先行词为reason,由why引导的定语从句翻译的时候需要翻译为...之所以...的原因是...
考点解析:本题四个选项都是由re开头的,主要是考察形式相近的词语意思的辨析.这道题其实很简单,从题干可以看出dialects和language是同义词,那么需要填入的词一定也是 preserve 的同义词,也就不难选出 retain 了.这是这也是标志词法的一个应用.
第3题:
A customer would like to convert their existing IBM System Storage DS8100 to a DS8700 to gain more capacity. During the TDA review the impact on the running production environment during conversion is discussed. Which of the following must be considered?()
A. DS8000 model conversions are generally non-disruptive
B. a model conversion from DS8100 to DS8700 is disruptive
C. the DS8100 base frame needs to be sent back to the factory for upgrade
D. during model conversion the logical configuration can be kept, but the system must be rebooted
第4题:
《比较教育评论》(Comparative Education Review)
美国国际与比较教育学会会刊,1956年创刊,主要刊载国际与比较教育研究领域的研究成果。
略
第5题:
以下哪几个选项属于OpenStack社区代码Review的步骤?()
第6题:
What is the main reason for doing a Solutions Assurance Review with the customer? ()
第7题:
hans is designing the reviews application. the application will include two forms :review and response, in the view ,the response documents do not appear under the review documents from which they were created, what could be causing this to happen .()
第8题:
A company has acquired another company and is consolidating data centers. During the consolidation, half of the users of a business critical application lost access. The users who maintained access experienced slow performance. What is the first action the SAN/storage administrator should take to determine the source of the problem()
第9题:
You have an Exchange Server 2010 organization.You need to determine why a remote SMTP server rejects e-mail sent from your organization.What should you do?()
第10题:
Restart the server by using the Safe Mode option. Review the contents of the ntbtlog.txt file.
Restart the server by using the Last Known Good Configuration option. Review the spupdsvc.log file.
Restart the server by using the Directory Services Restore Mode option. Review the contents of the ntdtcsetup.log file.
Restart the server by using the Safe Mode with Networking option. Review the contents of the WindowsUpdate.log file.
第11题:
From Reliability Monitor, review the informational events.
From System Information, review the Software Environment.
From Performance Monitor, review the System Diagnostics Report.
From Performance Monitor, run the System Performance Data Collector Set.
第12题:
Use eConfig to configure and validate each pSeries and p5 system.
Engage Advanced Technical Support to review any outstanding technical issues.
Confirm with the customer that the solution design meets their requirements.
Perform a Pre-Install Solution Assurance Review to validate required power requirements.
第13题:
163 During a project review meeting, you discover that your $250,000 project has a negative schedule variance of $20,000 which equates to 12% of the work scheduled to this point of time. You can therefore conclude that:
A. The project will be completed late.
B. The critical path has been lengthened.
C. the costs are being overrun.
D. Overtime will be required to maintain the original critical path.
E. None of the above.
第14题:
( )is not the advantage of GERT(graphical evaluation and review techniques) as compared with PERT(project evaluation and review techniques)
A.allowing looping
B.allowing for dummy tasks
C.allowing branching
D.allowing multiple project end results
第15题:
第16题:
检索式“review in PT”的含义是:()
第17题:
( )is not the advantage of GERT (Graphical evaluation and review techniques)as compared with PERT (project evaluation and review techniques).
第18题:
A company has acquired another company and is consolidating data centers. During the consolidation, half of the users of a business-critical application lost access. The users who maintained access experienced slow performance. What is the first action the SAN/storage administrator should take to determine the source of the problem()
第19题:
Which tasks are necessary to perform a data migration using DFSMS?()
第20题:
Your network consists of a single Active Directory domain.? All domain controllers run Windows Server 2008. You need to identify the Lightweight Directory Access Protocol (LDAP) clients that are using the largest amount of available CPU resources on a domain controller. What should you do()
第21题:
DS8000 model conversions are generally non-disruptive
a model conversion from DS8100 to DS8700 is disruptive
the DS8100 base frame needs to be sent back to the factory for upgrade
during model conversion the logical configuration can be kept, but the system must be rebooted
第22题:
检出所有综述文献
检出所有题目中出现review的文献
检出所有刊名中出现review的文献
检出所有主题词字段中出现review的文献
第23题:
To revalidate the total solution
To overcome objections to the solution
To review the pricing with the customer
To ensure the customer has the correct applications