An administrator needs to recover an HMC due to a failed disk. The disk has been replaced, allowing the administrator to reinstall the HMC back to the required release of software. Backups of both the HMC Console Data and Upgrade Data are available. Afte

题目

An administrator needs to recover an HMC due to a failed disk. The disk has been replaced, allowing the administrator to reinstall the HMC back to the required release of software. Backups of both the HMC Console Data and Upgrade Data are available. After reloading the HMC with the Recovery DVDs, what are the next steps to restore the HMC configuration?()

  • A、Use the 'HMC Management > Restore HMC Data' option to first restore just the HMC Data..
  • B、Use the 'HMC Management > Restore Upgrade Data' option to first restore just the Upgrade Data.
  • C、Use the 'HMC Management > Restore HMC Data' option to first restore the HMC Data and then the Upgrade Data.
  • D、Use the 'HMC Management > Restore Upgrade Data' option to first restore the Upgrade Data, and then the HMC Data.

相似考题
更多“An administrator needs to recover an HMC due to a failed disk. The disk has been replaced, allowing the administrator to reinstall the HMC back to the required release of software. Backups of both the HMC Console Data and Upgrade Data are available. After”相关问题
  • 第1题:

    An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()

    • A、An additional switch for the new HMC
    • B、Asynchronous adapters on the new HMC
    • C、The two 570 servers are directly connected to the new HMC
    • D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

    正确答案:A

  • 第2题:

    Which of the following could BEST be used to recover a failed RAID 1 disk after it has been replaced?()

    • A、 Tape restore utilities
    • B、 Imaging utilities
    • C、 Partitioning utilities
    • D、 Array management utilities

    正确答案:D

  • 第3题:

    The IP address of POWER6 595 is showing up in the HMC instead of the server name.Next to the IP address is the status,which shows Failed Authentication.The system administrator needs to enter a password.  Which password is needed to restore connection for the POWER6 595 to the HMC?()

    • A、The hscroot user password.
    • B、The CE password.
    • C、The HMC password.
    • D、The ASM admin password.

    正确答案:C

  • 第4题:

    Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()

    • A、Free up one HMC and update the software for use with the p5 570
    • B、Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMC
    • C、Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570
    • D、Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software

    正确答案:A

  • 第5题:

    An administrator has mirrored the root volume group to a second disk, but ’bootlist’ is failing to correctly add the second disk.  What is the likely cause of the problem?()  

    • A、The administrator has failed to run ’bosboot -ad <2nd disk>’ prior to the bootlist command.
    • B、The administrator has failed to run ’bootinfo -B <2nd disk>’ prior to the bootlist command.
    • C、The administrator has failed to run ’mirrorvg -m rootvg <2nd disk>’ prior to the bootlist command.
    • D、The administrator has failed to run ’bosboot -ad /dev/ipldevice <2nd disk>’ prior to the bootlist command.

    正确答案:A

  • 第6题:

    An administrator is applying a corrective service to their HMC. The corrective service has been shipped on 3 DVDs. Which action will ensure the corrective service is correctly installed?()

    • A、Select the option to automatically reboot the HMC
    • B、Select the option to automatically reboot the HMC after each disk
    • C、Shutdown all managed LPARs prior to beginning the install process
    • D、Copy all disks into the "SERVICE" directory and select concurrent install

    正确答案:A

  • 第7题:

    An administrator is applying a corrective service to their HMC .The corrective service has been shipped on 3 DVDs. Which action will ensure the corrective service is correctly installed?()

    • A、Select the option to automatically reboot the HMC .
    • B、Select the option to automatically reboot the HMC after each disk.
    • C、Shutdown all managed LPARs prior to beginning the install process.
    • D、Copy all disks into the ""SERVICE"" directory and select concurrent install.

    正确答案:A

  • 第8题:

    The System Administrator wants to do a backup of the HMC and notices that there are two options on the HMC menu: Backup Critical Console data and Save Upgrade Data. Which of the following best describes the differences between the two options?()

    • A、Both options back up user and partition profile data. Only the Backup Critical Console Data backs up TCP/IP settings or preferences
    • B、Both options back up partition profile information. Only the Backup Critical Console Data backs up service function settings, such as Inventory Scout, Service Agent, and Service Focal Point
    • C、The Backup Critical Console Data should be performed just before the HMC software update operation. The Save Upgrade Data should be performed each time configuration changes are made to the system or the HMC
    • D、The Save Upgrade Data should be performed just before the HMC software update operation. The Backup Critical Console Data should be performed each time configuration changes are made to the system or the HMC

    正确答案:D

  • 第9题:

    单选题
    A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy.  Which of the following statements correctlydescribes the dual HMC environment? ()
    A

     To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.

    B

     Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.

    C

     Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on the

    D

     Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    The HMC software has just been upgraded remotely via the WebSM client. It now needs to be rebooted to make the update active. How can this be accomplished?()
    A

    Use ssh to connect to the HMC and reboot

    B

    The upgrade will display complete and ask you to reboot

    C

    Select shutdown in the Management section of the WebSM client

    D

    Once logged out of the WebSM client it will ask to logoff, shutdown or reboot. Select reboot.


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    A system administrator had a disk failure on an HMC. The disk was replaced and the HMC was loaded from the Product Recovery CD. The system administrator had performed a backup to DVD of the HMC data before the system failed. After restoring the backup files, it was noticed that no profile files were restored. What is the most likely cause of this problem?()
    A

    The profile data was not initialized after restoring the backup CD

    B

    The profile data was not backed up before doing the Critical Console Data backup

    C

    A Critical Console Data backup was performed which backs up user data, but not profile data

    D

    A Save Upgrade data was done instead of a backup Critical Console Data and the profile files were not included


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
    A

    An additional switch for the new HMc  

    B

    Asynchronous adapters on the new HMc

    C

    The two 570 servers are directly connected to the new HMc  

    D

    One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc


    正确答案: C
    解析: 暂无解析

  • 第13题:

    A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy.  Which of the following statements correctlydescribes the dual HMC environment? ()

    • A、 To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.
    • B、 Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.
    • C、 Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on the
    • D、 Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from

    正确答案:C

  • 第14题:

    The HMC software has just been upgraded remotely via the WebSM client. It now needs to be rebooted to make the update active. How can this be accomplished?()

    • A、Use ssh to connect to the HMC and reboot
    • B、The upgrade will display complete and ask you to reboot
    • C、Select shutdown in the Management section of the WebSM client
    • D、Once logged out of the WebSM client it will ask to logoff, shutdown or reboot. Select reboot.

    正确答案:A

  • 第15题:

    A system administrator had a disk failure on an HMC. The disk was replaced and the HMC was loaded from the Product Recovery CD. The system administrator had performed a backup to DVD of the HMC data before the system failed. After restoring the backup files, it was noticed that no profile files were restored. What is the most likely cause of this problem?()

    • A、The profile data was not initialized after restoring the backup CD
    • B、The profile data was not backed up before doing the Critical Console Data backup
    • C、A Critical Console Data backup was performed which backs up user data, but not profile data
    • D、A Save Upgrade data was done instead of a backup Critical Console Data and the profile files were not included

    正确答案:B

  • 第16题:

    Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()

    • A、Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. 
    • B、The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed. 
    • C、If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run. 
    • D、The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot. 

    正确答案:B

  • 第17题:

    Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()

    • A、Include a new HMC in the order to connect to the p5 595
    • B、Include a pair of new HMCs in the order to connect to the p5 595
    • C、Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities
    • D、Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to  POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities

    正确答案:B

  • 第18题:

    A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()

    • A、Order a new HMC to support the p5 system.
    • B、Attach the new p5 system to the existing HMC.
    • C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
    • D、Do nothing.  This system does not require an HMC.

    正确答案:A

  • 第19题:

    There is a problem with one of the disks used for your database and your system administrator informs you that the disk needs to be replaced. The replacement disk will not be available until tomorrow.  There was only one data file on this disk; it belongs to the USERS tablespace in your PROD database. Your PROD database runs in ARCHIVELOG mode and nightly online backups are taken. The users need to be able to access the data in the USERS tablespace before the replacement disk arrives. You have already taken the USERS tablespace offline and have restored the data file from last night’s backup to a new disk. Which additional steps are required in order to make the USERS tablespace available?()

    • A、Only bring the tablespace back online.
    • B、Only recover the tablespace and then bring the tablespace back online.
    • C、Shut down the database, recover the data file and then start up the database.
    • D、Issue the ALTER DATABASE RENAME FILE command, recover the tablespace, and then bring the tablespace online.
    • E、Recover the tablespace, issue the ALTER DATABASE RENAME FILE command, and then bring the tablespace online.

    正确答案:D

  • 第20题:

    单选题
    The IP address of POWER6 595 is showing up in the HMC instead of the server name.Next to the IP address is the status,which shows Failed Authentication.The system administrator needs to enter a password.  Which password is needed to restore connection for the POWER6 595 to the HMC?()
    A

    The hscroot user password.

    B

    The CE password.

    C

    The HMC password.

    D

    The ASM admin password.


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    The System Administrator wants to do a backup of the HMC and notices that there are two options on the HMC menu: Backup Critical Console data and Save Upgrade Data. Which of the following best describes the differences between the two options?()
    A

    Both options back up user and partition profile data. Only the Backup Critical Console Data backs up TCP/IP settings or preferences

    B

    Both options back up partition profile information. Only the Backup Critical Console Data backs up service function settings, such as Inventory Scout, Service Agent, and Service Focal Point

    C

    The Backup Critical Console Data should be performed just before the HMC software update operation. The Save Upgrade Data should be performed each time configuration changes are made to the system or the HMC

    D

    The Save Upgrade Data should be performed just before the HMC software update operation. The Backup Critical Console Data should be performed each time configuration changes are made to the system or the HMC


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    An administrator has mirrored the root volume group to a second disk, but ’bootlist’ is failing to correctly add the second disk.  What is the likely cause of the problem?()
    A

    The administrator has failed to run ’bosboot -ad <2nd disk>’ prior to the bootlist command.

    B

    The administrator has failed to run ’bootinfo -B <2nd disk>’ prior to the bootlist command.

    C

    The administrator has failed to run ’mirrorvg -m rootvg <2nd disk>’ prior to the bootlist command.

    D

    The administrator has failed to run ’bosboot -ad /dev/ipldevice <2nd disk>’ prior to the bootlist command.


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    There is a problem with one of the disks used for your database and your system administrator informs you that the disk needs to be replaced. The replacement disk will not be available until tomorrow.  There was only one data file on this disk; it belongs to the USERS tablespace in your PROD database. Your PROD database runs in ARCHIVELOG mode and nightly online backups are taken. The users need to be able to access the data in the USERS tablespace before the replacement disk arrives. You have already taken the USERS tablespace offline and have restored the data file from last night’s backup to a new disk. Which additional steps are required in order to make the USERS tablespace available?()
    A

    Only bring the tablespace back online.

    B

    Only recover the tablespace and then bring the tablespace back online.

    C

    Shut down the database, recover the data file and then start up the database.

    D

    Issue the ALTER DATABASE RENAME FILE command, recover the tablespace, and then bring the tablespace online.

    E

    Recover the tablespace, issue the ALTER DATABASE RENAME FILE command, and then bring the tablespace online.


    正确答案: B
    解析: 暂无解析