What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()
第1题:
A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimum configuration which will support this?()
第2题:
A customer wants to migrate their existing cluster onto new POWER6 hardware, and in addition requires thecluster to be migrated from PowerHA version 5.3 to 5.5. Given that AIX 6.1 and PowerHA 5.5 filesets arealready installed in the new hardware, which of the following methods would allow the customer to maintaintheir current cluster configuration?()
第3题:
When installing a new PCIe network card, when should manufacturer software and drivers beinstalled?()
第4题:
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
第5题:
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
第6题:
A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()
第7题:
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()
第8题:
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()
第9题:
logical configuration
all configuration
full state
system configuration
第10题:
The monitor cannot display the increased resolution that is a feature of the new graphics card.
The power supply does not provide enough wattage to power the new graphics card.
The new graphics card is incompatible with the existing processor.
The computer does not have enough RAM to support the new graphics card.
第11题:
vmstat and iostat data from the older machines
The number of CPUs that were installed in the original machines
Data from Workload Estimator (WLE) and IBM Performance Management (PM)
Performance data that is collected from the new system after it has been put into production
第12题:
Power 710
Power 720
Power 730
Power 740
第13题:
An HP customer would like to discuss IBM system advantages. Their current system platform is a partitioned HP rp8400. Which of the following pSeries systems and advantages should be discussed?()
第14题:
Which of the following is MOST critical when installing a new processor in an existing system?()
第15题:
A technician has just installed an upgraded graphics card. The computers power turns off before itfinishes booting. Which of the following is the cause of the problem? ()
第16题:
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()
第17题:
A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()
第18题:
A customer requires an infrastructure to support disaster recovery of critical applications between two remote data centers. One data center is in Tokyo and one is in Beijing. The customer’s Recovery Point Objective (RPO) requires a six-hour window for a bandwidth of 100 MB/s and a new storage system for a total of 4 TB of data. They estimate 100 MB of new data produced hourly. What data synchronization method would be recommended to meet the requirements()
第19题:
A system administrator is deploying a new POWER5 server. The application requires AIX 5L V5.2. Which of the following virtualization technologies can be used?()
第20题:
Company.com is adding a new I/O drawer to an existing p5-570 with four LPARs and wants to re-balance the network cards in the I/O drawers. What is the best way to accomplish this?()
第21题:
e-Config
System Planning Tool (SPT)
IBM Workload Estimator (WLE)
IBM Performance Monitor (PM)
第22题:
The new system requires 1 installed processor card for the GX++ bus adapter
The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter
The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter
The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter
第23题:
Before inserting the PCIe network card in the case
After inserting the new PCIe network card in the case
They will be automatically loaded after installation
Load them concurrently with the PCIe network card