A customer has an existing SP system and needs to add cards to some of the nodes. Which of the following applications must be used to configure the upgrade?()
第1题:
A customer has security concerns about classified local data being compromised if the laptop isstolen. The customers laptop has Windows 2000 utilizing the FAT16 file system. Which of the following actions should be taken?()
第2题:
A customer needs both a database and application server to communicate over a network. The new systems will be connected to the same network as the current IBM equipment with known IBM serial numbers. How could a pSeries technical specialist best determine which type of network card is appropriate, without making an additional call to the customer?()
第3题:
A customer has installed an IBM System Storage DS8700 with 20 TB of storage, two-way processor version, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues. To address this performance consideration with minimal cost to the customer, which of the following should be the FIRST step to resolve the problem()
第4题:
A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for z/OS, and FlashCopy. 120 TB physical capacity is required per site. Only Fibre Channel drives can be used. Which solution best meets the specified requirements()
第5题:
A customer has an IBM System Storage DS5000 and needs to add more disk drives to the unit.There is no record of the configuration for this machine. How can the configuration be retrieved soan upgrade can be configured?()
第6题:
Which of the following customer environments is addressed by IBM System Storage N series gateways?()
第7题:
A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()
第8题:
A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS. Which of the following must be completed prior to this migration ()
第9题:
Configure a 2 node x3950 X5
Customer needs a System p server to support Oracle applications
Download the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing
Configure a system that meets the minimum requirements
第10题:
MRPDPlus tool
Inventory Services
PCRS6000 Portable Configurator
eConfig - IBM Configurator for e-Business
第11题:
a customer with CIFS, NFS and GPFS requirements
a customer wanting to natively implement Easy Tier
a customer who has large block sequential write requirements
a customer who needs to consolidate multiple storage controllers under one managementinterface
第12题:
the space for the upgrade to a DS8700
the space on the left of the DS8000 for an expansion frame
the space on the right of the DS8000 for an expansion frame
the space to install additional DDMs in the base frame
第13题:
An existing IBM customer has some iSeries servers in their environment. The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications. The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms. Which of the following will accomplish this?()
第14题:
A customer wants to upgrade an existing pSeries system. In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()
第15题:
A customer has an IBM System Storage DS8100 with 128 DDMs and needs to add additional capacity. What must be verified by the Business Partner during the visit to the computer room()
第16题:
While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()
第17题:
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()
第18题:
A network administrator wants to analyze the historical performance of the servers in the organization and forecast the system performance needs into the future. Which add-on component of IBM Director would be used to assist with this task?()
第19题:
The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed. The specialist discovers that the customer has never updated their VPD. Which of the following HMC applications is used to gather the current VPD information?()
第20题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()
第21题:
Service Processor
Service Director
Inventory Scout Services
Service Focal Point
第22题:
IBM DS5000 Cabling Tool
IBM e-Configurator Tool
IBM Pre-Installation TDA Checklist
IBM Standalone Solutions Configuration Tool
第23题:
The customer used their IBM Customer Number
The customer has activated their base warranty
The customer purchased Remote Technical Support Servicepac
The customer escalated the issue to the Duty Manager