When planning an SVC environment with the customer, the storage specialist finds that they wishto include iSCSI storage into the cluster. In this situation what is needed to place the storage intoproduction?()
第1题:
We should keep in mind()the feedback is very helpful for planning future meetings and events.
A. what
B. that
C. when
第2题:
第3题:
ANQ型发动机配气机构凸轮轴采用正时传动带和链条驱动方式。
第4题:
When planning for VoWLAN capacity during a site survey, how many simultaneous calls can beestimated per 5 GHz channel?()
第5题:
Which of the following is the MOST important consideration when looking at distance requirements when planning a hot site?()
第6题:
Which of the following people does IBM recommend be involved with a Pre-Sales Solutions Assurance Review?()
第7题:
The customer executive who is funding the project
IBM Global Financing when they are financing the purchase
Subject matter experts representing each component of the solution
Hardware installation planning representative responsible for the installation
第8题:
对
错
第9题:
NQ01
RB02
QE03
MF04
第10题:
RAID controllers
Multiple UPSs
Redundant cooling
Dual NICs
Redundant power supplies
第11题:
linkage
variety
flexibility
learnability
第12题:
work staff attributes, such as skills and communication
redundancy, to prevent single points of failure
processes, such as documentation, change control, and labs
appropriate technology, such as hardware and software
tools, such as those for monitoring and reporting
第13题:
The most crucial time for project risk assessment is (75) .
A.when a problem surfaces
B.during the planning phase
C.during the close-out phase
D.after the project schedule has been published
第14题:
改正下面拼写错误的音节:anqüan(安全)
anquan(安全)
略
第15题:
ANQ发动机冷却系统的小循环为常开的。
第16题:
When planning high availability, which two components are important to minimize the effect of outages?()
第17题:
When planning for redundant power sources in a server deployment, which of the following should be purchased?()
第18题:
When does the Online Planning Worksheet tool run a validation?()
第19题:
Use the Workload Estimator capacity planning tool.
Use prtconf output from legacy systems.
Use the LPAR Validation Tool.
Use Performance Management Services.
第20题:
第21题:
Frequent stability calculations required
Thorough pre-planning required
Limiting depths alongside berths restrict barge drafts
Minimum trim and 0°list are required for optimum operations
第22题:
7
14
20
30
第23题:
第24题:
linkage
variety
flexibility
learnability