During a resource group takeover operation, the resource group was found to go into error state. A tail of thehacmp.out file released the following message: Aug 3 12:57:20 EVENT FAILED:// -1: event_error 1 TE_RG_MOVE -1 WARNING:// Cluster PowerHA has beenrunning recovery program ’/usr/es/sbin/cluster/events/rg_move.rp’ for 360 seconds. Please check clusterstatus. What command can the administrator issue to cause the cluster to continue processing?()
第1题:
An administrator has a 2 node cluster running PowerHA version 5.5. They remove a resource group from theactive cluster configuration. When performing a verify and synchronize of the cluster, the administrator getsthe following error: "migcheck[471]: cl_connect() error, nodename=Node1, rc=-1 cldare: A communication error prevents obtaining the VRMF from remote nodes. A DARE event cannot be run until this is corrected. Please ensureclcomd is running." What is the most likely cause of this error?()
第2题:
An administrator is notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 has been powered off. Upon restarting Node1 the administrator checks the AIXerror log and the cluster.log Which of the following is the most likely cause of the failure of Node1?()
第3题:
An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()
第4题:
You updated the resource plan directive for the resource consumer group, DSS_USERS. The resource plan directive is assigned to the DSS_PLAN by using the following statement: SQL>EXEC DBMS_RESOURCE_MANAGER.UPDATE_PLAN_DIRECTIVE (PLAN => ’DSS_PLAN’, GROUP_OR_SUBPLAN => ’DSS_USERS’, NEW_CPU_P1 => 80, NEW_SWITCH_GROUP => ’CANCEL_SQL’, NEW_SWITCH_ESTIMATE => TRUE, NEW_SWITCH_TIME => 600); A user connects to the database and starts an operation. What is the outcome if Oracle estimates that the execution time for this operation will exceed 600 seconds?()
第5题:
You have a server that runs Windows Server 2008 Enterprise Edition. The server has the FailoverClustering feature installed. The server has three nodes named NODE1, NODE2, and NODE3. The Microsoft Distributed Transaction Coordinator (MSDTC) resource is installed on the cluster. The cluster hasa dedicated cluster group named Group1 that includes the MSDTC resource. You discover that Group1 isunable to failover to NODE3 from NODE1 or NODE2. The failover from NODE1 to NODE2 functionswithout errors. You need to configure Group1 to support the failover between all cluster nodes. What should you do?()
第6题:
An administrator was notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 had been powered off. Upon restarting Node1 the administrator checked the AIXerror log and the cluster.log Which of the following is most likely the cause of the failover?()
第7题:
Nothing,HACMP does not require them automatically.
Force the remaining nodes down,then reintegrate them all.
Select reacquire resources after forced down on start menu.
Create a setting timer to bring the resource group online.
第8题:
The operating system crashed
A disk failure forced a volume group off line
The System Resource Controller executed a system halt
The topology services daemon has crashed due to an ODM mismatch
第9题:
Change the cluster to a rotating design.
Change the Cascading without Fallback flag to true.
Change the Inactive Takeover field to false in the cluster configuration.
Nothing should be done. This is the default behavior for cascading resource groups,and node ’A’ should have been started first.
第10题:
included in the resource group.
currently managing the resource group.
not part of an application resource group.
included in a cluster_admin resource group.
第11题:
1
2
3
4
第12题:
rg1 is configured with a delayed fallback timer
Settling time policy has not been configured for rg1
Node1 does not have sufficient resources to support rg1
Node2 is the first in the ’Default Node Priority’ list for resource group rg1
第13题:
A new administrator is performing fallover testing on a two-node cluster and is concerned that the cascading resource group belonging to Node ’A’ did not reintegrate properly after the cluster was restarted on Node ’A’. A stable cluster is reported by clstat,and clRGinfo reports the resource group online on Node ’B’. What type of configuration would cause this type of behavior?()
第14题:
An architect is configuring a PowerHA cluster in the following way:The cluster will consist of two nodes. Each node will have two boot interfaces configured as a single PowerHA network. The cluster is to have asingle resource group with a single service address.Heartbeating over aliased is not to be used. What is the minimum number of subnets required to implement this cluster?()
第15题:
Following an unsuccessful cluster fallover test, it is determined that the nfsrg1 resource group was the problem causing the cluster to run the config_too_long evetn. The nfsrg1 resource group contains 10 nfs filesystems that are cross-mounted to the other cluster node. Without modify8ing the time until warning parameters,what can be done to enhance NFS fallover performance?()
第16题:
You want to create a consumer group, GROUP1, and you execute the following command in the command-line interface: SQL> EXEC DBMS_RESOURCE_MANAGER.CREATE_CONSUMER_GROUP (CONSUMER_GROUP =>’group1’, COMMENT => ’New Group’); This command errorsout displaying the following message: ERROR at line 1: ORA-01031: insufficient privileges ORA-06512: at "SYS.DBMS_RMIN", line 115 ORA-06512: at SYS.DBMS_RESOURCE_MANAGER", line 108 ORA-06512: at line 1 What action would you take to overcome this error?()
第17题:
You have a server that runs Windows Server 2008 Enterprise Edition. The server has the Failover Clustering feature installed. The server has three nodes named NODE1, NODE2, and NODE3. The Microsoft Distributed Transaction Coordinator (MSDTC) resource is installed on the cluster. The cluster has a dedicated cluster group named Group1 that includes the MSDTC resource. You discover that Group1 is unable to failover to NODE3 from NODE1 or NODE2. The failover from NODE1 to NODE2 functions without errors. You need to configure Group1 to support the failover between all cluster nodes. What should you do?()
第18题:
Company.com has a two-node HACMP cluster with a single cascading resource group. Node ’A’ is the normal production node, and Node ’B’ is the standby node. One of the first steps in the HACMP test plan is to start the cluster and to verify that al elements for the resource group have been acquired. The administrator who is conducting the HACMP test starts the HACMP daemons on Node ’B’ with the ’smitty clstart" command. The administrator notices that Node ’B’ acquires the elements of the resource group, including a service IP labels,a shared volume group, and an application server that has been started. The expectation was that Node ’B’ would enter the cluster in a standby status, rather than acquiring production resources. What should the administrator do to correct this problem?()
第19题:
AIX was shut down
A fatal corruption occurred in the gsclvmd daemon
The topsvcs daemon was stopped by the system resource controller
The grpsvcs process was stopped by the system resource controller
第20题:
The resource group DNP has been configured.
The resource group option CWOF has been enabled.
The resource group option Inactive Takeover is set.
A resource group fallback timer has been configured.
第21题:
Change the cluster resource group definitions from cascading to rotating,synchronize the cluster,and restart HACMP
Edit the /urs/es/sbin/utilities/clhosts file to reflect he desired node-to-resource group relationships and restart HACMP
Use the clRGMove utility move rg2 o Node ’B’ and rg3 to Node ’C’,then start the cluster manager on Nodes ’B’ and ’C’ with the clstart utility
Disable Inactive Node Takeover,check the node priority list in the resource groups definitions,synchronize the cluster,and start HACMP on Nodes ’B’ and ’C’
第22题:
grant SYSDBA to the user
grant SYSOPER to the user
grant the RESOURCE role to the user
use the GRANT command to grant the ADMINISTER_RESOURCE_MANAGER privilege to the user
grant the ADMINISTER_RESOURCE_MANAGER privilege to the user by using the DBMS_RESOURCE_MANAGER_PRIVS package
第23题:
There is a DARE lock in place
A PowerHA migration is in progress
Cluster services is not active on the other node
The other cluster node is running a different version of RSCT