A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()
第1题:
A customer has two Power 770 systems with 4 enclosures each. Thirty two cores and 1TB of memory are activated on each system. Each system has 3 database partitions and each partition has 10 cores and 300GB of memory. Which solution will provide automated recovery of unplanned outages at least cost?()
第2题:
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()
第3题:
Companycom has several AS/400 servers in their IT infrastructure running V5R2 that they wish to consolidate. The customer wants to simplify their environment and install i5/OS on a p5 590 with 16 1.65GHz processors and 20 i5/OS partitions. The customer plans to use the Advanced Power Virtualization to share their storage, processors, and memory. What considerations and limitations should be reviewed with the customer before the purchase?()
第4题:
A customer wants to run DB2 on a Power 780 with uncapped partitions. They have licensed DB2 for 32 of the 64 active cores, and will use it in multiple partitions. How can the customer ensure that the number of licenses purchased for DB2 is not exceeded?()
第5题:
A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in thefollowing configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host1 hosted IBM i partition; 2 hosted Linux partitions. Which configuration will provide boot disk capability to all partitions?()
第6题:
A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in the following configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host; 1 hosted IBM i partition; 2 hosted Linux partitions. Which configuration will provide boot disk capability to all partitions?()
第7题:
A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()
第8题:
A minimum of two HBAs; the customer will need to download SDD
A minimum of four HBAs; the customer will need to download SDD
A minimum of two HBAs; the customer will need to configure MPIO
A minimum of four HBAs; the customer will need to configure MPIO
第9题:
Use dual-split backplane in both enclosures for the three AIX partitions and the IBMi partition.
Put each partition on a dedicated controller using the triple-split backplane option in both enclosures.
Use the triple-split backplane option in one enclosure for the AIX partitions, and the default dual-split backplane for the IBMi partition in the second enclosure.
Use the triple-split backplane option in one enclosure for the AIX partitions, and the non-split backplane mode in the second enclosure for the IBMi hosting partition.
第10题:
The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.
The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.
The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.
The POWER5 system supports more partitions and has the lowest partitioning overhead.
第11题:
AIX Basic Edition
AIX Express Edition
AIX Standard Edition
AIX Enterprise Edition
第12题:
Use alt_disk_install to install AIX on all logical partitions.
Configure the DVD as a desired resource on all partitions.
Configure all resources as shared resources between all partitions.
Create a separate NIM server to manage the installation of all partitions.
第13题:
A customer has a requirement to eliminate single points of failure for an application. They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()
第14题:
A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility. Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()
第15题:
A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance. Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()
第16题:
A customer has systems with AIX 6.1 and 5.3 distributed across two data centers located 8km apart. They want to implement high availability with automated application restart and synchronous data replication between the IBM Systems Storage DS8700 systems which are installed in each datacenter. Which solution addresses the customer requirements?()
第17题:
A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()
第18题:
A customer is interested in PS700 Blade with 32GB of memory. The Blade will have 4 partitions sharing resources equally. They want the least expensive operating system that supports Live Partition Mobility. Which of the following AIX Editions address their requirement?()
第19题:
An IT director needs to deploy 3 partitions, each using dedicated internal boot disk. Which system will support the customer requirement using the least amount of rack space?()
第20题:
Build the logical partition infrastructure based on 6 or more VLANs.
Build the logical partition infrastructure based on two or more IVEs.
Build the logical partition infrastructure based on Partition Mobility.
Build the logical partition infrastructure based on redundant VIO Servers.
第21题:
Build the logical partition infrastructure based on 6 or more VLANs.
Build the logical partition infrastructure based on two or more IVEs.
Build the logical partition infrastructure based on Partition Mobility.
Build the logical partition infrastructure based on redundant VIO Servers.
第22题:
PowerVM Lx86
PowerVM Express Edition
PowerVM Standard Edition
PowerVM Enterprise Edition
第23题:
Power 770 servers
Power 750 servers
Power 755 servers
Power 720 servers