A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700. How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()
第1题:
A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()
第2题:
A customer wants to boot from an iSCSI SAN with their IBM BladeCenter infrastructure running Microsoft Windows Server 2000. What is required for the customer to be able to perform this?()
第3题:
A customer has four 2-way 2U front-end web servers that are currently running at 15% CPU utilization. These servers provide points of access for users worldwide, and volume is expected to triple in the next six months and aggressively grow thereafter. They want to upgrade these systems to newer technology and stay within the 8U of rack space that they are replacing. Which solution would fit the customer’s requirements?()
第4题:
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()
第5题:
A customer wants to implement a clustered database solution on their existing x445 servers. A minimum of four nodes must participate in the cluster, and the customer wishes to use open standards. Which of the following best satisfies their requirements?()
第6题:
A financial customer has three data centers that are four kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds. Which solution satisfies the customer’s recovery time objective()
第7题:
You plan to implement a WSUS server in a branch office.You need to recommend a solution for deploying the WSUS server that meets the company's technicalequirements. What should you include in the recommendation?()
第8题:
an autonomous WSUS server that is configured to download updates from Microsoft Update
an autonomous WSUS server that is configured to download updates from the WSUS server in the main office
a WSUS server running in replica mode that is configured to download updates from Microsoft Update
a WSUS server running in replica mode that is configured to download updates from the WSUS server in the main office
第9题:
A minimum of two HBAs; the customer will need to download SDD
A minimum of four HBAs; the customer will need to download SDD
A minimum of two HBAs; the customer will need to configure MPIO
A minimum of four HBAs; the customer will need to configure MPIO
第10题:
Software Rejuvenation
Capacity Manager
Capacity Workload Manager
Aurema Application Workload Manager
第11题:
8 drive sets of 300 GB drives
4 drive sets of 300 GB drives
14 drive sets of 146 GB drives
18 drive sets of 146 GB drives
第12题:
Three x366 4-ways running VMWare ESX Server.
An x445 8-way Xeon MP attached to a DS4300 and running VMWare ESX Server.
An x445 16-way Xeon MP attached to an EXP400 and running VMWare ESX Server.
Four x346 2-ways running VMWare ESX Server.
第13题:
A customer needs a new Microsoft Windows 2003 Server. They are running an application that requires substantial memory. They would like a rack mountable system, which will support four Xeon processors with 2MB of L3 cache. Which of the following is the minimum configuration to satisfy the customer’s requirements?()
第14题:
A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()
第15题:
A customer is in the initial stages of implementing a server consolidation project. The Information Technology staff has identified several Microsoft Windows servers that are running single applications on older hardware and averaging under 20% utilization. Part of their server consolidation goal is to lower the number of servers, decrease the operating system license cost, and increase utilization per server. Which of the following IBM Director extensions could be used to satisfy all of these requirements?()
第16题:
A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()
第17题:
A customer needs to deploy a SAN and connect nine servers running a mix of Windows and Linux. They currently need 12TB, but their growth requirements will be tripled in the near future. They will also consolidate 18 legacy Windows servers onto one system using virtualization software and connect that server to the storage solution. A DS4000 series backup solution needs to be included in the design. Which of the following solutions will satisfy these requirements?()
第18题:
A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites. Which of the following solutions satisfies the customer's recovery time objective?()
第19题:
Database
Network Infrastructure
Systems Management
第20题:
A p650 running AIX v5.3
A p5-550 running AIX v5.3
A p5-570 running Advanced POWER Virtualization
Multiple rack-mounted p615s running dynamic LPAR
第21题:
NTFS
Windows Defender for Vista
BitLocker drive encryption
EFS
第22题:
You should consider running Exchange Best Practices Analyzer.
You should consider running Microsoft Baseline Security Analyzer (MBSA).
You should consider running the Get-ExchangeServer cmdlet.
You should consider running the Get-EventLogLevel cmdlet.
第23题:
an autonomous WSUS server that is configured to download updates from Microsoft Update
an autonomous WSUS server that is configured to download updates from the WSUS server in the main office
a WSUS server running in replica mode that is configured to download updates from Microsoft Update