You are designing a site topology to meet the business and technical requirements. What should you do?()A、Increase the replication interval between sites.B、Use SMTP as the transport protocol for replication.C、Create site links to represent the physical to

题目

You are designing a site topology to meet the business and technical requirements. What should you do?()

  • A、Increase the replication interval between sites.
  • B、Use SMTP as the transport protocol for replication.
  • C、Create site links to represent the physical topology.  
  • D、Disable the Knowledge Consistency Checker (KCC) and manually configure site replication.

相似考题
参考答案和解析
正确答案:C
更多“You are designing a site topology to meet the business and technical requirements. What should you do?()A、Increase the replication interval between sites.B、Use SMTP as the transport protocol for replication.C、Create site links to represent the physical to”相关问题
  • 第1题:

    You have an existing Active Directory site named Site1. You create a new Active Directory site and name it Site2. You need to configure Active Directory replication between Site1 and Site2. You install a new domain controller. You create the site link between Site1 and Site2. What should you do next?()

    • A、Use the Active Directory Sites and Services console to configure a new site link bridge object
    • B、Use the Active Directory Sites and Services console to decrease the site link cost between Site1 and Site2.
    • C、Use the Active Directory Sites and Services console to assign a new IP subnet to Site2. Move the new domain controller object to Site2
    • D、Use the Active Directory Sites and Services console to configure the new domain controller as a preferred bridgehead server for Site1.

    正确答案:C

  • 第2题:

    You are designing an Active Directory site infrastructure to meet the bussiness and technical requirements. What should you do?()

    • A、Create one site for each office and each local bank.
    • B、Create one site for all offices. Create one site for all local banks.
    • C、Create one site for Amsterdam. Create one site for all branch office and all local banks.
    • D、Create one site for Amsterdam. Create one site for the Utercht brach office. Create one site for that Hague branch office. Place half the local banks in the utercht site and half the local banks in the Hague site.
    • E、Create one site for Amsterdam. Create one site for the Utercht brach office. Create one site for each local bank that has more than 50 users. Place all the other local banks in the Amsterdam Site.

    正确答案:E

  • 第3题:

    You are designing a forest structure to meet the business and technical requirements. How many forests should you create?()

    • A、One
    • B、Two
    • C、Three
    • D、Four

    正确答案:B

  • 第4题:

    You have a main office and five branch offices. The offices connect to each other by using a WAN link. An Active Directory site exists for each office. Each site has a separate IP site link to all other sites. The main office site is configured as a hub site. You have an Exchange Server 2010 organization. You discover that messages sent between offices are not routed through the Hub Transport servers in themain office. You need to ensure that all messages sent between offices are routed through the Hub Transport serversin the main office. What should you do?()

    • A、Change all IP site links to SMTP site links.
    • B、Modify the Exchange-specific cost for each site link.
    • C、From the Hub Transport servers in each site, create a journal rule.
    • D、From the Hub Transport servers in each site, create a transport rule.

    正确答案:B

  • 第5题:

    You are designing a top-level OU structure to meet the business and technical requirements.  Which top-evel OU or OUs should you use? ()

    • A、 ATC 
    • B、 Paris
    • C、 Berlin
    • D、 Sydney
    • E、 Manifast
    • F、 Human Resources

    正确答案:A,B

  • 第6题:

    单选题
    You are designing a WAN implementation strategy to meet the business and technical requirements. What should you do?()
    A

    Configure a demand-dial router.

    B

    Create multiple Active Directory site links.

    C

    Configure a VPN connection between each branch office.

    D

    Install an Internet Authentication Service (IAS) server in each branch office.


    正确答案: B
    解析: 暂无解析

  • 第7题:

    单选题
    You have a single Active Directory directory service domain. You have three Active Directorysites. Site replication is scheduled to occur during business hours only. You plan to make a schema change after business hours. You need to ensure that replication occurs for all sites during the schema change.   What should you do?()
    A

     Set the Ignore schedules setting for the IP transport.

    B

     Clear the Ignore schedules setting for the IP transport.

    C

     Enable the KCC for all site objects.

    D

     Disable the KCC for all site objects.


    正确答案: D
    解析: 暂无解析

  • 第8题:

    多选题
    You are designing the site topology for the internal domain. Which action or actions should you perform?()
    A

    Create a Single Site.

    B

    Create a site for each physical location.

    C

    Set the replication interval on the default IP site link to 60 Minutes.

    D

    Configure the schedule of the default IP site link to only allow replication between the hours of 9:00  PM and 5:00 AM.

    E

    Configure the schedule of the default IP site link to only allow replication between the hours of 3:00  AM and 11:00 AM.


    正确答案: C,B
    解析: 暂无解析

  • 第9题:

    单选题
    You are designing an Active Directory forest structure to meet the business and technical requirements. What should you do?()
    A

    Create a single forest that has one domain. Use OUs to separate the departments.

    B

    Create a single forest that has multiple domains to represent every department.

    C

    Create a single forest that has three domains: one for finance, one for HR, and one for the remaining departments.

    D

    Create multiple forests that have a single domain in each forest to represent the departments.


    正确答案: D
    解析: 暂无解析

  • 第10题:

    单选题
    You are designing a site topology to meet the business and technical requirements.  What should you do?()
    A

     Increase the replication interval between sites,

    B

     Use SMTP as the transport protocol for replication.

    C

     Create site links to represent the physical topology.

    D

     Disable the Knowledge Consistency Checker (KCC) and manually configure site replication.


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    You are designing a forest structure to meet the business and technical requirements.  How many forests should you create?()
    A

     One

    B

     Two

    C

     Three

    D

     Four


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    You are designing an Active Directory site infrastructure to meet the bussiness and technical requirements.  What should you do? ()
    A

     Create one site for each office and each local bank.

    B

     Create one site for all offices. Create one site for all local banks.

    C

     Create one site for Amsterdam. Create one site for all branch office and all local banks.

    D

     Create one site for Amsterdam. Create one site for the Utercht brach office. Create one site for that Hague branch office. Place half the local banks in the utercht site and half the local banks in the Hague site.

    E

     Create one site for Amsterdam. Create one site for the Utercht brach office. Create one site for each local bank that has more than 50 users. Place all the other local banks in the Amsterdam Site.


    正确答案: D
    解析: 暂无解析

  • 第13题:

    You are designing an Active Directory forest structure to meet the business and technical requirements. What should you do?()

    • A、Create a single forest that has one domain. Use OUs to separate the departments.
    • B、Create a single forest that has multiple domains to represent every department.
    • C、Create a single forest that has three domains: one for finance, one for HR, and one for the remaining departments.
    • D、Create multiple forests that have a single domain in each forest to represent the departments.

    正确答案:C

  • 第14题:

    You have an existing Active Directory site named Site1. You create a new Active Directory site  and name it Site2.     You need to configure Active Directory replication between Site1 and Site2. You install a new  domain controller. You create the site link between Site1 and Site2.     What should you do next()

    • A、Use the Active Directory Sites and Services console to configure a new site link bridge object.
    • B、Use the Active Directory Sites and Services console to decrease the site link cost between Site1 and Site2.
    • C、Use the Active Directory Sites and Services console to assign a new IP subnet to Site2. Move the new domain cont
    • D、Use the Active Directory Sites and Services console to configure the new domain controller as a preferred bridgehe

    正确答案:C

  • 第15题:

    You are designing a site topology to meet the business and technical requirements.  What should you do?()

    • A、 Increase the replication interval between sites,
    • B、 Use SMTP as the transport protocol for replication.
    • C、 Create site links to represent the physical topology.
    • D、 Disable the Knowledge Consistency Checker (KCC) and manually configure site replication.

    正确答案:C

  • 第16题:

    You have a single Active Directory directory service domain. You have three Active Directorysites. Site replication is scheduled to occur during business hours only. You plan to make a schema change after business hours. You need to ensure that replication occurs for all sites during the schema change.   What should you do?()

    • A、 Set the Ignore schedules setting for the IP transport.
    • B、 Clear the Ignore schedules setting for the IP transport.
    • C、 Enable the KCC for all site objects.
    • D、 Disable the KCC for all site objects.

    正确答案:A

  • 第17题:

    You are designing a top-level OU structure to meet the business and technical requirements. Which top-evel OU or OUs should you use?()

    • A、ATC
    • B、Paris
    • C、Berlin
    • D、Sydney
    • E、Manifast
    • F、Human Resources

    正确答案:A,B

  • 第18题:

    单选题
    You are designing an Active Directory site infrastructure to meet the bussiness and technical requirements. What should you do?()
    A

    Create one site for each office and each local bank.

    B

    Create one site for all offices. Create one site for all local banks.

    C

    Create one site for Amsterdam. Create one site for all branch office and all local banks.

    D

    Create one site for Amsterdam. Create one site for the Utercht brach office. Create one site for that Hague branch office. Place half the local banks in the utercht site and half the local banks in the Hague site.

    E

    Create one site for Amsterdam. Create one site for the Utercht brach office. Create one site for each local bank that has more than 50 users. Place all the other local banks in the Amsterdam Site.


    正确答案: C
    解析: 暂无解析

  • 第19题:

    多选题
    You are designing a top-level OU structure to meet the business and technical requirements. Which top-evel OU or OUs should you use?()
    A

    ATC

    B

    Paris

    C

    Berlin

    D

    Sydney

    E

    Manifast

    F

    Human Resources


    正确答案: B,C
    解析: 暂无解析

  • 第20题:

    单选题
    You are designing a WAN implementation strategy to meet the business and technical requirements.  What should you do? ()
    A

     Configure a demand-dial router.

    B

     Create multiple Active Directory site links.

    C

     Configure a VPN connection between each branch office.

    D

     Install an Internet Authentication Service (IAS) server in each branch office.


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    You are designing an Active Directory forest structure to meet the business and technical requirements.  What should you do?()
    A

     Create a single forest that has one domain. Use OUs to separate the departments.

    B

     Create a single forest that has multiple domains to represent every department.

    C

     Create a single forest that has three domains: one for finance, one for HR, and one for the remaining departments.

    D

     Create multiple forests that have a single domain in each forest to represent the departments.


    正确答案: D
    解析: 暂无解析

  • 第22题:

    多选题
    You are designing the Active Directory site topology to meet the business and technical requirements.  Which site or sites will require universal group membership caching?()
    A

    New York

    B

    Montreal

    C

    Quebec

    D

    San Francisco

    E

    Seattle

    F

    Vancouver


    正确答案: C,E
    解析: 暂无解析

  • 第23题:

    单选题
    You are designing a site topology to meet the business and technical requirements. What should you do?()
    A

    Increase the replication interval between sites.

    B

    Use SMTP as the transport protocol for replication.

    C

    Create site links to represent the physical topology.  

    D

    Disable the Knowledge Consistency Checker (KCC) and manually configure site replication.


    正确答案: A