What is a site survey best practice for location-based services?()A、20 percent cell overlapB、four access points detecting a client at -76 dBm or betterC、10 percent cell overlapD、three access points detecting a client at -75 dBm or better

题目

What is a site survey best practice for location-based services?()

  • A、20 percent cell overlap
  • B、four access points detecting a client at -76 dBm or better
  • C、10 percent cell overlap
  • D、three access points detecting a client at -75 dBm or better

相似考题
更多“What is a site”相关问题
  • 第1题:

    You have a single Active Directory directory service domain with three sites named Site1,Site2,and  Site3. There are site links between all three sites,and replication between sites occurs every 30 minutes. You need to ensure that all replication traffic is routed through Site2.  What should you do?()  

    • A、 Define a preferred bridgehead server for Site2.
    • B、 Reduce the interval between replications between Site1 and Site2 and between Site2 and Site3.
    • C、 Decrease the cost of the site link between Site1 and Site3.
    • D、 Increase the cost of the site link between Site1 and Site3.

    正确答案:D

  • 第2题:

    In order to use the item records at the site level, to what must the item be added? ()

    • A、 Asset
    • B、 Location
    • C、 Storeroom
    • D、 Rotating Asset

    正确答案:C

  • 第3题:

    A customer requires off-site storage for 500 GB per night in backup tapes. The backup site is 560kilometers (350 miles) away. The customer does not require the backup site to run the applicationin the event of failure at the main site. What is the least expensive strategy for the data center toimplement?()

    • A、make online image backups
    • B、install Global Mirror at the backup site
    • C、ship nightly backup tapes to the remote site
    • D、install Tivoli Storage Manager (TSM) and a tape drive at the backup site

    正确答案:C

  • 第4题:

    You are designing an Active Directory site infrastructure to meet the bussiness and technical requirements. What should you do?()

    • A、Create one site for each office and each local bank.
    • B、Create one site for all offices. Create one site for all local banks.
    • C、Create one site for Amsterdam. Create one site for all branch office and all local banks.
    • D、Create one site for Amsterdam. Create one site for the Utercht brach office. Create one site for that Hague branch office. Place half the local banks in the utercht site and half the local banks in the Hague site.
    • E、Create one site for Amsterdam. Create one site for the Utercht brach office. Create one site for each local bank that has more than 50 users. Place all the other local banks in the Amsterdam Site.

    正确答案:E

  • 第5题:

    You are designing a site topology to meet the business and technical requirements. What should you do?()

    • A、Increase the replication interval between sites.
    • B、Use SMTP as the transport protocol for replication.
    • C、Create site links to represent the physical topology.  
    • D、Disable the Knowledge Consistency Checker (KCC) and manually configure site replication.

    正确答案:C

  • 第6题:

    You have a main office and five branch offices. The offices connect to each other by using a WAN link. An Active Directory site exists for each office. Each site has a separate IP site link to all other sites. The main office site is configured as a hub site. You have an Exchange Server 2010 organization. You discover that messages sent between offices are not routed through the Hub Transport servers in themain office. You need to ensure that all messages sent between offices are routed through the Hub Transport serversin the main office. What should you do?()

    • A、Change all IP site links to SMTP site links.
    • B、Modify the Exchange-specific cost for each site link.
    • C、From the Hub Transport servers in each site, create a journal rule.
    • D、From the Hub Transport servers in each site, create a transport rule.

    正确答案:B

  • 第7题:

    You are designing a site topology for the new Active Directory environment. What should you do?()

    • A、Create one site for all offices. Place the subnets for the four branch offices and the Sydney main office in this site.  
    • B、Create two sites: one site for the four branch offices and one site for the Sydney main office. Place the subnets for the branch offices in one site. Place the subnet for the Sydney main office in the other site.  
    • C、Create three sites: one site for the four branch offices, one site for the Sydney main office, and one site for the Sydney satellite offices.  
    • D、Create four sites: one for the Melbourne and Perth branch offices, one site for the Berlin and Paris branch offices, one site for the Sydney main office, and one site for the Sydney satellite offices.  
    • E、Create five sites; one site for the Melbourne branch office, one site for the Perth branch office, one site for the Berlin branch office, one site for the Paris branch office, and one site for the Sydney main office. Place the subnets for each branch office and the Sydney main office in their respective sites.

    正确答案:E

  • 第8题:

    多选题
    You are the network administrator for your company. The network consists of a single Active Directory domain with three sites named Site1, Site2, and Site3. The sites and site links are configured to use Site2 to connect Site1 and Site3. Each site contains three Windows Server 2003 domain controllers. A domaincontroller in each site is configured as a preferred bridgehead server. All user and group accounts are created in Site1. Several new users start work in Site2. When they attempt to log on to the network, the logon fails. You confirm that the user accounts are created and are visible in Site1 and Site2. You discover that the preferred IP bridgehead server in Site2 failed. You repair the server and confirm that replication is successful to Site2. You need to ensure that the failure of a single domain controller in any site will not interfere with Active Directory replication between sites.  What are two possible ways to achieve this goal?()
    A

    Configure an IP site link between Site1 and Site3.

    B

    Configure two domain controllers in each site as preferred IP bridgehead servers.

    C

    Configure two domain controllers in each site as preferred SMTP bridgehead servers.

    D

    Configure each site to have no preferred bridgehead servers.

    E

    Configure an SMTP site link between each of the sites. Assign a cost of 200 to the SMTP site link.


    正确答案: D,E
    解析: 暂无解析

  • 第9题:

    单选题
    You download a file from an FTP site on the Internet. What is the highest layer in the OSI model used in this FTP operation?()
    A

    Application

    B

    Presentation

    C

    Session

    D

    Transport

    E

    Internet

    F

    Data Link

    G

    Physical


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    You are designing an Active Directory site infrastructure to meet the bussiness and technical requirements.  What should you do? ()
    A

     Create one site for each office and each local bank.

    B

     Create one site for all offices. Create one site for all local banks.

    C

     Create one site for Amsterdam. Create one site for all branch office and all local banks.

    D

     Create one site for Amsterdam. Create one site for the Utercht brach office. Create one site for that Hague branch office. Place half the local banks in the utercht site and half the local banks in the Hague site.

    E

     Create one site for Amsterdam. Create one site for the Utercht brach office. Create one site for each local bank that has more than 50 users. Place all the other local banks in the Amsterdam Site.


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    In order to use the item records at the site level, to what must the item be added? ()
    A

     Asset

    B

     Location

    C

     Storeroom

    D

     Rotating Asset


    正确答案: A
    解析: 暂无解析

  • 第12题:

    What does the appearance of the ACL tag BLOCK_WBRS in the access log mean?() 

    • A、 the proxy blocked an outbound request because the client is infected with malware
    • B、 the proxy blocked access to a site with a low reputation score
    • C、 the proxy blocked access to a site because of a suspicious server response
    • D、 your appliance or the WBRS key is out of support

    正确答案:B

  • 第13题:

    A HACMP/XD://HAGeo cluster has been installed with four nodes, two nodes at each site. The cluster is protected from site isolation by the DBFS facility in HACMP/XD://HAGeo.  In the event of a site failure,what happens?()  

    • A、 The dominate site will always assume the non-dominate site has failed and continue processing.
    • B、 The dominate site initiates a call to the non-dominate site to verify if any of the nodes are functional.
    • C、 The non-dominate site initiates a call to the dominate site to verify if any of the nodes are functional.
    • D、 The nodes are completely independent and can call each other if they detect a total failure of the ZGeo_Primary network.

    正确答案:C

  • 第14题:

    You copy a Web site from a development site to a staging site. You do not have the Web site in a source control application. Another developer begins to fix bugs on the staging site while the development team adds features on the development site. You need to synchronize the development site and the staging site and copy the latest version of each file to both locations. What should you do? ()

    • A、Use the Copy Web tool.
    • B、Create a Web Setup project.
    • C、Use the Publish Web tool.
    • D、Use the command line to XCOPY the files.

    正确答案:A

  • 第15题:

    You have an existing Active Directory site named Site1. You create a new Active Directory site  and name it Site2.     You need to configure Active Directory replication between Site1 and Site2. You install a new  domain controller. You create the site link between Site1 and Site2.     What should you do next()

    • A、Use the Active Directory Sites and Services console to configure a new site link bridge object.
    • B、Use the Active Directory Sites and Services console to decrease the site link cost between Site1 and Site2.
    • C、Use the Active Directory Sites and Services console to assign a new IP subnet to Site2. Move the new domain cont
    • D、Use the Active Directory Sites and Services console to configure the new domain controller as a preferred bridgehe

    正确答案:C

  • 第16题:

    Your company has a main office and 20 branch offices.Each office contains an Exchange Server 2010 Mailbox server and an Exchange Server 2010 Hub Transport server. Each office is configured as a separate Active Directory site.Each branch office site has one IP site link that connects to the main office site.You need to ensure that e-mail sent between offices is routed through the Hub Transport servers in the main office. What should you do?()

    • A、From the Exchange Management Shell, modify the Exchange-specific site link costs.
    • B、From the Exchange Management Shell, configure the main office site as a hub site.
    • C、From Active Directory Sites and Services, modify the site link costs.
    • D、From Active Directory Sites and Services, remove all IP site links and then create new SMTP site links.

    正确答案:B

  • 第17题:

    You have an existing Active Directory site named Site1. You create a new Actrve Directory site and name it Site2.You need to configure Active Directory replication between Site1 and Site2. You install a new domain controller. You create the site link between Site1 and Site2. What should you do next()

    • A、Use the Active Directory Sites and Services console to configure a new site link bridge object.
    • B、Use the Active Directory Sites and Services console to decrease the site link cost between Site1 and Site2.
    • C、Use the Active Directory Sites and Services console to assign a new IP subnet to Site2. Move the new domain controller object to Site2.
    • D、Use the Active Directory Sites and Services console to configure the new domain controller as a preferred bridgehead server for Site1.

    正确答案:C

  • 第18题:

    单选题
    Your network has two main offices.Each office is configured as a separate Active Directory site named Site1 and Site2.Each site contains an Exchange Server 2010 Hub Transport server.You need to prevent a user from Site1 from sending an e-mail message that contains the word budget to a user from Sit.What should you do?()
    A

    From a Hub Transport server in Site1, create a transport rule.

    B

    From a Hub Transport server in Site1, configure the sender filtering feature.

    C

    From a Hub Transport server in Site2, configure the content filtering feature.

    D

    From a Hub Transport server in Site2, modify the properties of the Client Receive connector.


    正确答案: B
    解析: 暂无解析

  • 第19题:

    单选题
    A HACMP/XD://HAGeo cluster has been installed with four nodes, two nodes at each site. The cluster is protected from site isolation by the DBFS facility in HACMP/XD://HAGeo.  In the event of a site failure,what happens?()
    A

     The dominate site will always assume the non-dominate site has failed and continue processing.

    B

     The dominate site initiates a call to the non-dominate site to verify if any of the nodes are functional.

    C

     The non-dominate site initiates a call to the dominate site to verify if any of the nodes are functional.

    D

     The nodes are completely independent and can call each other if they detect a total failure of the ZGeo_Primary network.


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    A customer is currently using EMC’s Mirrorview/A. Their primary site is 400 kilometers away fromthe secondary site, and they have an RPO of 4 hours. What is the IBM equivalent product?()
    A

    Global Copy

    B

    Sync Mirror

    C

    Metro Mirror

    D

    TPC for Replication


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    You are designing a site topology to meet the business and technical requirements.  What should you do?()
    A

     Increase the replication interval between sites,

    B

     Use SMTP as the transport protocol for replication.

    C

     Create site links to represent the physical topology.

    D

     Disable the Knowledge Consistency Checker (KCC) and manually configure site replication.


    正确答案: A
    解析: 暂无解析