What is a site survey best practice for location-based services?()
第1题:
You have a single Active Directory directory service domain with three sites named Site1,Site2,and Site3. There are site links between all three sites,and replication between sites occurs every 30 minutes. You need to ensure that all replication traffic is routed through Site2. What should you do?()
第2题:
In order to use the item records at the site level, to what must the item be added? ()
第3题:
A customer requires off-site storage for 500 GB per night in backup tapes. The backup site is 560kilometers (350 miles) away. The customer does not require the backup site to run the applicationin the event of failure at the main site. What is the least expensive strategy for the data center toimplement?()
第4题:
You are designing an Active Directory site infrastructure to meet the bussiness and technical requirements. What should you do?()
第5题:
You are designing a site topology to meet the business and technical requirements. What should you do?()
第6题:
You have a main office and five branch offices. The offices connect to each other by using a WAN link. An Active Directory site exists for each office. Each site has a separate IP site link to all other sites. The main office site is configured as a hub site. You have an Exchange Server 2010 organization. You discover that messages sent between offices are not routed through the Hub Transport servers in themain office. You need to ensure that all messages sent between offices are routed through the Hub Transport serversin the main office. What should you do?()
第7题:
You are designing a site topology for the new Active Directory environment. What should you do?()
第8题:
Configure an IP site link between Site1 and Site3.
Configure two domain controllers in each site as preferred IP bridgehead servers.
Configure two domain controllers in each site as preferred SMTP bridgehead servers.
Configure each site to have no preferred bridgehead servers.
Configure an SMTP site link between each of the sites. Assign a cost of 200 to the SMTP site link.
第9题:
Application
Presentation
Session
Transport
Internet
Data Link
Physical
第10题:
Create one site for each office and each local bank.
Create one site for all offices. Create one site for all local banks.
Create one site for Amsterdam. Create one site for all branch office and all local banks.
Create one site for Amsterdam. Create one site for the Utercht brach office. Create one site for that Hague branch office. Place half the local banks in the utercht site and half the local banks in the Hague site.
Create one site for Amsterdam. Create one site for the Utercht brach office. Create one site for each local bank that has more than 50 users. Place all the other local banks in the Amsterdam Site.
第11题:
Asset
Location
Storeroom
Rotating Asset
第12题:
What does the appearance of the ACL tag BLOCK_WBRS in the access log mean?()
第13题:
A HACMP/XD://HAGeo cluster has been installed with four nodes, two nodes at each site. The cluster is protected from site isolation by the DBFS facility in HACMP/XD://HAGeo. In the event of a site failure,what happens?()
第14题:
You copy a Web site from a development site to a staging site. You do not have the Web site in a source control application. Another developer begins to fix bugs on the staging site while the development team adds features on the development site. You need to synchronize the development site and the staging site and copy the latest version of each file to both locations. What should you do? ()
第15题:
You have an existing Active Directory site named Site1. You create a new Active Directory site and name it Site2. You need to configure Active Directory replication between Site1 and Site2. You install a new domain controller. You create the site link between Site1 and Site2. What should you do next()
第16题:
Your company has a main office and 20 branch offices.Each office contains an Exchange Server 2010 Mailbox server and an Exchange Server 2010 Hub Transport server. Each office is configured as a separate Active Directory site.Each branch office site has one IP site link that connects to the main office site.You need to ensure that e-mail sent between offices is routed through the Hub Transport servers in the main office. What should you do?()
第17题:
You have an existing Active Directory site named Site1. You create a new Actrve Directory site and name it Site2.You need to configure Active Directory replication between Site1 and Site2. You install a new domain controller. You create the site link between Site1 and Site2. What should you do next()
第18题:
From a Hub Transport server in Site1, create a transport rule.
From a Hub Transport server in Site1, configure the sender filtering feature.
From a Hub Transport server in Site2, configure the content filtering feature.
From a Hub Transport server in Site2, modify the properties of the Client Receive connector.
第19题:
The dominate site will always assume the non-dominate site has failed and continue processing.
The dominate site initiates a call to the non-dominate site to verify if any of the nodes are functional.
The non-dominate site initiates a call to the dominate site to verify if any of the nodes are functional.
The nodes are completely independent and can call each other if they detect a total failure of the ZGeo_Primary network.
第20题:
Global Copy
Sync Mirror
Metro Mirror
TPC for Replication
第21题:
Increase the replication interval between sites,
Use SMTP as the transport protocol for replication.
Create site links to represent the physical topology.
Disable the Knowledge Consistency Checker (KCC) and manually configure site replication.