For which quality of service parameter should the WLAN for VoWLAN clients be configured?()A、PlatinumB、GoldC、SilverD、Bronze

题目

For which quality of service parameter should the WLAN for VoWLAN clients be configured?()

  • A、Platinum
  • B、Gold
  • C、Silver
  • D、Bronze

相似考题
更多“For which quality”相关问题
  • 第1题:

    VThe Pareto Principle is a technique used to determine which quality control problems in a particular process should be corrected. Which of the following statements best represents the philosophy employed by this principle?

    A . In order to minimize financial losses from quality control problems, all problems which have a measureable cost should be corrected

    B . the majority of defects are caused by a small percentage of the identifiable problems. Improvement efforts should be reserved for these vital problems.

    C . in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.

    D . generally, 80% of the quality control problems are justifiable for correction via cost-benefit analysis. The remaining 20% are not financially worthy of improvement efforts.

    E . A and D


    正确答案:B

  • 第2题:

    Which of the following is not an input to quality planning?

    A . scope statement.

    B . regulations.

    C . work results.

    D . standards.

    E . quality policy.


    正确答案:C

  • 第3题:

    16 Which of the following statements about the cost of quality are true?

    A. the cost of quality is the expense of nonconformance to requirements and specifications.

    B. the cost of quality are mostly the direct responsibility of workers who are manufacturing the product. C. quality control programs should be implemented when the cost of quality are deemed affordable by management.

    D. A and B.

    E. A and C


    正确答案:A

  • 第4题:

    42 Which of the following is not an input to quality planning?

    A. scope statement.

    B. regulations.

    C. work results.

    D. standards.

    E. quality policy.


    正确答案:C

  • 第5题:

    Quality planning tools are often used to help plan effective quality management activities . ()is one of such tools, which involves company actual or planned project practices to those or other projects to generate ideas for improvement and to provide a basis by which to measure performance.

    A.Benchmarking

    B.Quality metric

    C.Quality checklist

    D.Brainstornung


    参考答案:A

  • 第6题:

    (c) Assess the likely criteria which would need to be satisfied for software to be regarded as ‘quality software’.

    (4 marks)


    正确答案:
    (c) The following are important considerations regarding the quality of the business software:
    – The software is error-free as this will improve its reliability. Whilst in practice this might not always be achievable the
    directors of SSH must recognise the dangers involved in supplying bespoke software which may prove damaging to their
    clients’ businesses with the resulting loss of client goodwill.
    – The software should meet quality control standards such as those specified by the ISO (International Standards
    Organisation).
    – The software must be delivered on time. Late delivery of business software will prove problematic since clients may rely
    on updated software to meet new customer needs or to fulfil revised business objectives.
    – The software must meet the initial specification of the customer. In meeting the specification SSH will be demonstrating
    that the software has been produced correctly with an appropriate focus on the requirements of end users.
    – The software must be usable i.e. as well as being able to do what it is supposed to do it is important that it is easy to
    use.
    – The software should be capable of being updated in the light of future changes that occur in the clients’ requirements.

  • 第7题:

    Bar-coding technology which identifies the () and the (), can help companies identify the source of defective parts and improve quality control.

    A、product

    B、logistics

    C、manufacturer

    D、quality


    正确答案:A,C

  • 第8题:

    Which of the following is not part of a modem quality management concept?(74)

    A.Performance standard is zero defects

    B.Quality must be inspected in

    C.85% of failures occur because of the process, not the worker

    D.Quality is a 4 cycle process plan/do/check/act


    正确答案:B
    解析:A、C、D是经典质量理论,只有B不是。

  • 第9题:

    ● Which of the following is not part of a modern quality management concept?(74)

    (74)

    A.Performance standard is zero defects

    B.Quality must be inspected in

    C.85% of failures occur because of the process, not the worker

    D.Quality is a 4 cycle process – plan/do/check/act


    正确答案:B

  • 第10题:

    Quality planning tools are often used to help plan effective quality management activities . ()is one of such tools, which involves company actual or planned project practices to those or other projects to generate ideas for improvement and to provide a basis by which to measure performance.

    • A、Benchmarking
    • B、Quality metric
    • C、Quality checklist
    • D、Brainstornung

    正确答案:A

  • 第11题:

    单选题
    A user reports poor picture quality with a laptop connected to an LCD. Which of the followingshould the technician check FIRST for optimal picture quality?()
    A

    Native resolution

    B

    Color depth

    C

    Minimum brightness

    D

    Maximum brightness


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    Quality planning tools are often used to help plan effective quality management activities . ()is one of such tools, which involves company actual or planned project practices to those or other projects to generate ideas for improvement and to provide a basis by which to measure performance.
    A

    Benchmarking

    B

    Quality metric

    C

    Quality checklist

    D

    Brainstornung


    正确答案: C
    解析: 暂无解析

  • 第13题:

    Which of the following statements about the cost of quality are true?

    A . the cost of quality is the expense of nonconformance to requirements and specifications.

    B . the cost of quality are mostly the direct responsibility of workers who are manufacturing the product.

    C . quality control programs should be implemented when the cost of quality are deemed affordable by management.

    D . A and B.

    E . A and C


    正确答案:A

  • 第14题:

    160 Which of the following is not an input to quality planning?

    A. scope statement.

    B. regulations.

    C. work results.

    D. standards.

    E. quality policy


    正确答案:C

  • 第15题:

    158 The Pareto Principle is a technique used by quality managers to determine which quality control problems of a particular service or manufacturing process should be corrected. Which of the following statements represents the philosophy of the principle?

    A. In order to minimize financial losses from quality control problems, all problems which have a measurable cost associated with them should be corrected.

    B. the majority of defects are caused by a small percentage of the identifiable problems. Improvements efforts should be reserved for these vital few problems.

    C. in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.

    D. generally, 80 % of the quality control problems are justifiable for correction via cost-benefit analysis. The remaining 20% are not financially worthy of improvement efforts.

    E. A and D


    正确答案:B

  • 第16题:

    98 Which of the following statements about the cost of quality are true?

    A. the cost of quality is the expense of nonconformance to requirements and specifications.

    B. the cost of quality are mostly the direct responsibility of workers who are manufacturing the product.

    C. quality control programs should be implemented when the cost of quality are deemed affordable by management.

    D. A and B.

    E. A and C


    正确答案:A

  • 第17题:

    Project Quality Management processes include all the activities of the()that determine quality policies, objectives and responsibilities so that the project will satisfy theneeds for which it was undertaken.

    A.Project

    B.project management team

    C.performingorganization

    D.customer


    参考答案:C

    该题的关键词为"determine quality policies,objectives and responsibilities",其语句结构为"Project Quality Management processes(主语)include(谓语)all the activities of the (宾语)that determine quality policies,objectives and responsibilities(定语从句)",含义为"项目质量管理过程包括决定质量政策、质量目标以及质量责任的什么的所有活动",根据项目质量管理知识,只有组织才可以决定项目的质量政策,因而此处选择选项C。

  • 第18题:

    ●Quality planning tools are often used to help plan effective quality management activities.(71) is one of such tools, which involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance.

    (71)A. Benchmarking

    B. Quality metric

    C. Quality checklist

    D. Brainstorming


    正确答案:A

  • 第19题:

    Which of the following is not part of the quality assurance process?(73)

    A.Operational definitions

    B.Quality policy

    C.Quality audits

    D.Quality improvement


    正确答案:B
    解析:A、C、D都是质量过程中重要内容,只是B不是。

  • 第20题:

    ● Which of the following is not part of the quality assurance process?(73)

    (73)

    A.Operational definitions

    B.Quality policy

    C.Quality audits

    D.Quality improvement


    正确答案:B

  • 第21题:

    Quality planning tools are often used to help plan effective quality management activities.( ) is one of such tools,which involves company actual or planned project practices to those or other projects to generate ideas for improvementand to provide a basis by which to measure performance.

    • A、Benchmarking
    • B、Quality metric
    • C、Quality checklist
    • D、Brainstorming

    正确答案:A

  • 第22题:

    单选题
    The quality of teaching should be measured by the degree ______ which the students’ potentiality is developed.
    A

    to

    B

    of

    C

    with  

    D

    in


    正确答案: A
    解析:
    教学质量应该用学生潜力发展来测量。句子后半部分原型应是develop to such a degree,用which指代后,介词仍然应该用to,故A项正确。

  • 第23题:

    单选题
    For which quality of service parameter should the WLAN for VoWLAN clients be configured?()
    A

    Platinum

    B

    Gold

    C

    Silver

    D

    Bronze


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    Quality planning tools are often used to help plan effective quality management activities.( ) is one of such tools,which involves company actual or planned project practices to those or other projects to generate ideas for improvementand to provide a basis by which to measure performance.
    A

    Benchmarking

    B

    Quality metric

    C

    Quality checklist

    D

    Brainstorming


    正确答案: C
    解析: 参考答案:A